Design-Bid-Build (DBB) Repair of Storm Sewer Water and Sanitary Sewer Systems, Caserma Miotto, Longare, Vicenza, Italy.
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Aug 10, 2026 |
| Due Date: | Aug 28, 2026 |
| Solicitation No: | W912PF26RA011 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Aug 10, 2026 01:26 pm BST
- Original Published Date: Jul 29, 2026 12:41 pm BST
- Updated Date Offers Due: Aug 28, 2026 03:00 pm BST
- Original Date Offers Due: Aug 28, 2026 03:00 pm BST
- Inactive Policy: Manual
- Updated Inactive Date: Jul 29, 2027
- Original Inactive Date: Jul 29, 2027
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Z2NZ - REPAIR OR ALTERATION OF OTHER UTILITIES
-
NAICS Code:
- 237110 - Water and Sewer Line and Related Structures Construction
-
Place of Performance:
Caserma Miotto, Longare, Vicenza, Italy 36023
10 August 2026 (Amendment 0001): The purpose of this amendment is as summarized on page 2, Summary of Changes of Amendment 0001. The changes include 1. Provide additional Government Point of Contact (POC) which resulted in the following updated sections and attachment: RFP Section 1.2.1. Government POC & RFP Attachment: B08-W912PF26RA011_ATT C_PPQ_AMD01, 2. Revise the Corporate Experience (Factor 2.1) in response to industry feedback received during pre-proposal inquiries (PPI) received. Specifically, Section 4.2.1.1.1(e) from five (5) years to eight (8) years & Sections 4.2.1.1.1(a) and 4.2.1.2. to clarify Secondary Attribute experience does NOT need to be demonstrated within a project meeting the size and core sewer/basin scope relevancy requirements to be credited. 3. Provide Government responses to Pre-Proposal Inquiries (PPI) #1 – 14, and 4. Distribute the following attachments: Revised RFP Attachment (B08-W912PF26RA011_ATT C_PPQ_AMD01), Site Visit Details (B08-W912PF26RA011_ATT E_SITE VISIT_ROUTE, B08-W912PF26RA011_ATT F_SITE VISIT_PHOTOS, B08-W912PF26RA011_ATT G_SITE VISIT_ATTENDANCE_Redacted) and Section 01 00 00 ATTACHMENTS (B08-W912PF26RA011_ATT06_THIRD_PARTY_AGENCY_DOCS and B08-W912PF26RA011_ATT07_PPI LOG_20260810).
29 July 2026 (Initial RFP Posting): This Design-Bid-Build construction project aims to provide repairs to the failed stormwater and sanitary sewer systems at the Miotto Military Installation to achieve environmental compliance and prevent future flood damage. The core of this project involves repairing, upsizing, and decoupling the cross-connected sewer systems to ensure proper independent discharge and full compliance with environmental regulations. The scope of work involves complete construction, repair, and site remediation. Key elements of construction include: repairing, extending, and upsizing the failed stormwater system piping to meet technical capacity standards; remediating site conditions associated with recent storm events, specifically repairing severe flooding, soil erosion, and landslide vulnerabilities; and separating the cross-connected sanitary and storm lines. The project also includes constructing a new direct connection to the Bisatto River via an underground TOC pipe utilizing existing perpetual rights-of-way and executed land-use licenses; installing a mandated stormwater lamination tank beneath a municipal sports field as required by local Italian regulations (Genio Civile); restoring the impacted municipal training field with a new synthetic turf surface directly over the completed lamination tank; and integrating naturalistic design features (such as sedimentation tanks, retention ponds, and weir walls) to effectively reduce stormwater velocity prior to discharge from the installation. The requirement also includes options for asbestos pipe removals, reinstallation of the sports field, landslide area repairs, and sedimentation pond installation. This solicitation is being advertised as Unrestricted for full and open competition. This source selection procurement requires both non-price (technical, experience, and past performance) and price proposals and will utilize the best value continuum tradeoff process at Revolutionary Federal Acquisition Regulation Overhaul (RFO) 15.103-1. The basis for evaluation and evaluation factors for award is included in the solicitation.
- KO DIRECTORATE OF CONTRACTING UNIT 31423 BOX 77
- APO , AE 09630
- USA
- Stacey Miller
- stacey.l.miller45.civ@army.mil
- Phone Number 00390444716874
- Mitchell McGillick
- mitchell.t.mcgillick.mil@army.mil
- Aug 10, 2026 01:26 pm BSTSolicitation (Updated)
- Jul 29, 2026 04:08 pm BST Solicitation (Updated)
- Jul 29, 2026 12:57 pm BST Solicitation (Updated)
- Jul 29, 2026 12:41 pm BST Solicitation (Original)