Bid Solicitation: S-P00140-00009979
|
Responses Due in 7 Days, 22 Hours, 20 Minutes
|
Header Information
|
Bid Number:
|
S-P00140-00009979
|
Description:
|
EWEB ITB 24-073-PW College Hill 7.5 MGStorage Tanks - Demolition and Earthwork
|
Bid Opening Date:
|
04/23/2024 02:00:00 PM
|
Purchaser:
|
Wendy Lopez
|
Organization:
|
EWEB
|
Department:
|
P0014001 - Purchasing Public Utility
|
Location:
|
P0014 - Purchasing
|
Fiscal Year:
|
23
|
Allow Electronic Quote:
|
No
|
Alternate Id:
|
EWEB ITB 24-073-PW College Hill Storage Tank
|
Required Date:
|
|
Available Date
:
|
04/02/2024 12:42:06 PM
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
Purchase Method:
|
Open Market
|
Pre Bid Conference:
|
A mandatory pre-bid meeting will be held at 10 a.m., on April 5th, 2024, at EWEB?s College Hill Reservoir near 24th and Lawrence, Eugene, Oregon. Attendance is mandatory for General Contractor Bidders.
|
Bulletin Desc:
|
EWEB requires demolition and excavation construction services to facilitate the construction oftwo 7.5 million gallon partially buried concrete storage tanks at EWEBs College Hill Reservoir site. The
project will require demolition of two existing concrete reservoirs, construction surveying and staking, 56,600 cubic yards of rock removal, common excavation, subgrade preparation, and sediment and erosion control.
|
|
Ship-to Address:
|
|
Bill-to Address:
|
|
Print Format:
|
Bid Print New
|
File Attachments:
|
PART 1: ITB 24-073-PW College Hill 7.5 MG Storage Tanks-Demolition and Earthwork
PART 2: ITB 24-073-PW College Hill 7.5 MG Storage Tanks-Demolition and Earthwork
PART 3: ITB 24-073-PW College Hill 7.5 MG Storage Tanks-Demolition and Earthwork
Pre-bid attendance list
Addendum No.1 - ITB 24-073-PW
|
Form Attachments:
|
|
Required Quote Attachments
|
|
Discipline Type:
|
Public Improvement
|
Procurement Method:
|
Competitive Sealed Bid
|
Amendments:
|
Amendment #
|
Amendment Date
|
Amendment Note
|
1
|
04/09/2024 03:47:26 PM
|
Attachment File Changes: Header 1. File 'Pre-bid attendance list': File 'Pre-bid attendance list' added . 2. File 'Addendum No.1 - ITB 24-073-PW': File 'Addendum No.1 - ITB 24-073-PW' added .
|
|
|
Item # 1:
(
912
-
40
)
|
EWEB requires demolition and excavation construction services to facilitate the construction oftwo 7.5 million gallon partially buried concrete storage tanks at EWEBs College Hill Reservoir site. The project will require demolition of two existing concrete reservoirs, construction surveying and staking, 56,600 cubic yards of rock removal, common excavation, subgrade preparation, and sediment and erosion control.
|
|
NIGP Code:
|
912-40
Demolition Services
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 2:
(
912
-
44
)
|
EWEB requires demolition and excavation construction services to facilitate the construction oftwo 7.5 million gallon partially buried concrete storage tanks at EWEBs College Hill Reservoir site. The project will require demolition of two existing concrete reservoirs, construction surveying and staking, 56,600 cubic yards of rock removal, common excavation, subgrade preparation, and sediment and erosion control.
|
|
NIGP Code:
|
912-44
Excavation Services
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|