DEMOLITION OF 1110 WEST SOUTH BOULEVARD
| Agency: | City of Montgomery |
|---|---|
| State: | Alabama |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Feb 19, 2026 |
| Due Date: | Feb 26, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID:
Title: DEMOLITION OF 1110 WEST SOUTH BOULEVARD
Addenda: 5
Release Date: 1/16/2026
Due Date: 2/26/2026
Post Information
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Summary
The work consists of the complete demolition and removal of the existing building and all associated site improvements at 1110 West South Boulevard down to the building pad, including but not limited to roofs, canopies, walls, windows, doors, floors, and foundations. All interior components such as ceilings, baseboards, flooring, doors, frames, hardware, and windows shall be removed, along with all plumbing, mechanical, HVAC, sprinkler, and electrical systems, including piping, ductwork, controls, and associated equipment. Utility lines for water, sewer, gas, and fire protection shall be properly disconnected and capped beyond the building pad as indicated in the contract documents. The existing pool shall be filled, compacted to 98% density, and graded to match surrounding terrain for mowing. Remaining site elements designated to stay, including existing fencing, curbs, sidewalks, and drives, shall be protected throughout construction. Temporary erosion and sediment control measures shall be installed and maintained in accordance with Alabama Department of Transportation Standard Specifications Section 665. All work must comply with applicable federal, state, and local codes, and the contractor shall obtain required permits, coordinate with utility companies for service disconnections, and legally dispose of all demolition debris off-site at an approved facility. Hazardous materials, if present, shall be handled per regulatory requirements, including EPA Section 608 refrigerant recovery, and asbestos or lead-containing materials must be removed and disposed of in accordance with environmental regulations.
Timeline
See Also
Project ID: Title: DEMOLITION OF 3019 FAIRWEST PLACE Addenda: 0 Release Date: 9/6/2026
City of Montgomery
Due by 9/29/2026
RUSSELL MILLS BUILDINGS NO. 8 & NO. 9 DEMOLITION Tue 08/11/2026 Thu 09/24/2026
City of Alexander City
Due by 9/24/2026
Project ID: Title: DEMOLITION OF 1611 NORTHGATE DRIVE Addenda: 0 Release Date: 9/1/2026
City of Montgomery
Due by 9/29/2026