DelawareStatePark CampgroundCampstoreCheck-in Replacement

Agency: Ohio Facility Construction Commission
State: Ohio
Type of Government: State & Local
Posted Date: Aug 6, 2026
Due Date: Aug 17, 2026
Solicitation No: DNR-270073
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Publish Date Due Date Number Owner Contractring Authority Project Name Primary Service Estimated Project Cost Q&A Short List Notes
2026/07/24 8/17/2026 DNR-270073 Ohio Department of Natural Resources Local Agency DelawareStatePark CampgroundCampstoreCheck-in Replacement A/E $3,000,000 N/A TBD

Attachment Preview

Request for Qualifications (Registered Design Professional*)
State of Ohio Standard Forms and Documents
Administration of Project: Local Agency
Delaware State Park Campground Camp-
Project Name store/Check-in Replacement
Project Location Delaware State Park
City / County Delaware / Delaware
Owner
Ohio Department of Natural Resources
Delivery Method General Contracting
Publish Date 7/24/2026
Response Deadline 8/17/26
Project Number
DNR-270073
Project Manager
Ray Moone
Contracting Authority Local Agency
Prevailing Wages State
5:00pm local time
No. of paper copies requested (stapled, not bound)
0
No. of electronic copies requested (PDF)
1
* “Registered Design Professional includes any architect holding a certificate issued under section 4703.10 of the Revised
Code, any landscape architect holding a certificate issued under section 4703.36 of the Revised Code, or any engineer
holding a certificate issued under section 4733.14 of the Revised Code.” (Ohio Building Code section 4101:1-2-01 Definitions)
Submit the requested number of Statements of Qualifications (Form F110-330) directly to Division of Engineering at
Engineering@dnr.ohio.gov. See Section J of this RFQ for additional submittal instructions.
Submit all questions regarding this RFQ in writing to Division of Engineering@dnr.ohio.gov with the project number included in
the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page on the OFCC
website at http://ofcc.ohio.gov on a regular basis until one week before the response deadline. The name of the party
submitting a question will not be included on the Q&A document.
Project Overview
A. Project Description
The Ohio Department of Natural Resources (ODNR) manages campgrounds at 76 State Parks, with over 8,970
campsites. The purpose of this project is to replace the current Camp-store/Check-in building that serves the Delaware
State Park Campground. continue the ongoing campground improvements that began in 2015.
ODNR is seeking professional design services for the design and construction administration required for this project.
The design for this project will include investigation and assessments of existing utilities/infrastructure (water, sewer,
storm drainage, electric, paving) that will support the planned new building. This assessment will consider the condition
of materials, sources of service, capacity, and expansion potential. The presence of asbestos-containing subgrade piping
must also be determined to support a design plan that addresses both immediate and future facility needs.
This project will enhance user experience, demolish and replace the current Camp-store/Check-in building, address
parking, and reassess and reconfigure pedestrian and vehicle traffic patterns as needed. Public and client use
requirements will be defined through the development of a Program of Requirements. ADA accessibility, public
appearance, Life Cycle Cost Analysis considerations and the development of potentially multiple creative design
concepts will all be incorporated in the design process. Due to the existing building being demolished due to its age, a
Hazardous Materials Assessment will be included. Additionally, rehabilitation of the adjacent recreation area including the
putt-putt course and landscape improvements (campground entrance sign) around the Camp-store/Check-in and
recreation area will be part of the project.
Phased construction efforts to maintain Camp-store and Check-in functionality need to be considered throughout the
design process.
As scope and associated costs are refined, scope and budget may be added or removed as ODNR initiatives and
funding allow.
F110-02-2026-JAN
Publish Date: 7/24/2026
Page 1 of 5
Request for Qualifications (Registered Design Professional*)
State of Ohio Standard Forms and Documents
B. Scope of Services
The development of a Program of Requirements (POR) will be included as part of the Professional Design as an
Additional Service. The project scope will be evaluated, prioritized, and defined to align with the project budget. Evaluation
of the project construction schedule will also be part of the POR stage. Upon award of the Agreement, the selected firm
will commence by developing the Program of Requirements.
The selected firm shall apply for and obtain all necessary regulatory permits, maintain current estimates of probable
construction costs through the design phase, and provide construction administration services. Permitting and/or
coordination with United States Army Corps of Engineers (USACE), United States Fish and Wildlife Service (USFWS),
ODNR Dam Safety Program, ODNR Division of Wildlife, Ohio Environmental Protection Agency (OEPA), State Historic
Preservation Office (SHPO), and the local floodplain administrators will be required. The selected firm will provide the
engineering analysis and calculations needed to advance the design, including structural, geotechnical, and hydraulics
engineering.
All design and construction shall comply with the current editions of all applicable national, state, and local codes, as well
as accessibility standards, including ADA, ICC A117.1, and the ABA Outdoor Developed Areas Guidelines. The Ohio
Department of Natural Resources Division of Engineering has developed a set of design guidelines for construction
projects. It is expected that all architects, engineers, consultants, and contractors will be familiar with these design
guidelines which will serve as the preference for all construction projects when developing final project specifications. A
complete set of current guidelines are available at Design Guidelines for Construction Projects | Ohio Department of
Natural Resources. (https://ohiodnr.gov/business-and-industry/services-to-business-industry/design-guidelines-all).
The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and
clarify with the Owner and/or the Contracting Authority, the cost breakdown of the A/E Agreement detailed cost
components to address the Owner’s project requirements. Participate in the Encouraging Diversity, Growth & Equity
(EDGE) Program as required by statute and the Agreement.
As required by the Agreement, and as properly authorized, provide the following categories of services: Program
Verification, Schematic Design, Design Development, Construction Document Preparation, develop & maintain estimates
of probable construction cost, value engineering, project schedules & construction schedules, Life Cycle Cost Analysis
(LCCA) reports, GIS As-built deliverables Bid and Award Support, Conformed Documents, Construction Administration,
Post-Construction, and Additional Services of all types.
Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required
for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov.
During the construction period, provide not less than 8 hours (excluding travel time) on-site construction administration
services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site
representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having
relevant and appropriate types of construction administration experience.
For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form
F110-330), below is a list of relevant scope of work requirements for this RFQ:
1. Experience with similar scope (campgrounds, public use shower-houses and restrooms).
2. Experience with environmental permitting and cultural resources assessment services.
3. Ability to manage design and construction projects in an occupied State Park setting.
4. Experience coordinating with USACE.
5. Experience with public facing and architecturally unique building design concepts.
6. Ability to design project scope within budget in current market conditions with regional cost factors.
7. Experience with construction cost-estimating/analysis for natural resource facilities.
8. Experience managing the State of Ohio contract documents and OAKS CI.
9. Experience with ODNR Capital improvement projects.
10. Experience developing public use facilities able to endure inherent heavy wear and demanding conditions.
F110-02-2026-JAN
Publish Date: 7/24/2026
Page 2 of 5
Request for Qualifications (Registered Design Professional*)
State of Ohio Standard Forms and Documents
C. Estimated Budget / Funding
State Funding:
$$3,000,000.00
Other Funding:
$0
Construction Cost: $2,524,500.00
Total Project Cost: $$3,000,000.00
D. Anticipated Schedule
Professional Services Start:
Construction Notice to Proceed:
Substantial Completion of all Work:
Professional Services Completed:
12 / 26
09 / 27
07 / 28
09 / 29
E. Estimated Basic Fee Range (see note below)
8% to 10%
F. EDGE Participation Goal
Percent of initial Total A/E Fee:
5.0%
NOTE: Basic Services include: (1) Program Verification, (2) Schematic Design, (3) Design Development, (4) Construction Documents,
(5) Bidding and Award OR GMP Proposal and Amendment (as applicable), (6) Construction Administration, and (7) Closeout services. The
Basic Fee includes all registered design professional services and consultant services necessary for proper completion of the Basic Services,
including validation of existing conditions (but not subsurface or hidden conditions) and preparation of cost estimates and design schedules for
the project. The Estimated Basic Fee Range is calculated as a percentage of the Estimated Budget for Construction Cost above,
including the Owner’s contingency. The Basic Fee excludes any Additional Services required for the project.
G. Basic Service Providers Required (see note below)
Lead A/E Discipline: Architecture
Secondary
Engineering
Disciplines:
Civil Engineering
Mechanical-Electrical-Plumbing Eng.
Landscape Architecture
Surveying
H. Additional Service Providers Required
Cultural Services
Environmental Services
Hazardous Materials
Geotechnical Services
Program of Requirements
Special Inspections OBC
USACE Permitting
Enter Secondary Discipline
Enter Secondary Discipline
NOTE: The lead A/E shall be (1) any architect holding a certificate issued under section 4703.10 of the Revised Code, (2) any landscape
architect holding a certificate issued under section 4703.36 of the Revised Code, or (3) any engineer holding a certificate issued under section
4733.14 of the Revised Code.
I. Evaluation Criteria for Selection
Demonstrated ability to meet Owner’s programmed project vision, scope, budget, and schedule on previous
projects.
Previous experience compatible with the proposed project (e.g., type, size).
Relevant past work of prospective firm’s proposed consultants.
Past performance of prospective firm and its proposed consultants.
Qualifications and experience of individuals directly involved with the project.
Proposer’s previous experience (numbers of projects, sizes of projects) when working with its proposed
consultants.
Specification writing credentials and experience.
Experience and capabilities of creating or using Critical Path Method (CPM) schedules and of using CPM
schedules as a project management resource.
Approach to and success of using partnering and Alternative Dispute Resolution.
Proximity of prospective firms to the project site.
Proposer’s apparent resources and capacity to meet the needs of this project.
The selected A/E and all its consultants must have the capability to use the Internet within their normal business
location(s) during normal business hours.
Interested A/E firms are required to submit the Commitment to Participate in the EDGE Business Assistance Program
form in its Statement of Qualifications (Form F110-330) submitted in response to the RFQ, to indicate its intent to contract
with and use EDGE-certified Business(es), as a part of the A/E’s team. The Intent to Contract and to Perform and / or
waiver request letter and Demonstration of Good Faith Effort form(s) with complete documentation must be attached to
F110-02-2026-JAN
Publish Date: 7/24/2026
Page 3 of 5
Request for Qualifications (Registered Design Professional) continued
the A/E’s Technical Proposal. Both forms can be accessed via the OFCC website at https://ofcc.ohio.gov. The Intent to
Contract and to Perform form is again required at the Fee Proposal stage.
If the A/E firm intends to receive points for exceeding the EDGE Participation Goal, it must provide BOTH a
completed Commitment to Participate form AND a completed Statement of Intent to Contract and to Perform form
signed by both parties with its Statement of Qualifications.
For all Statements of Qualifications, please identify the EDGE-certified Business(es), by name, which will participate in the
delivery of the proposed professional services solicited in the RFQ.
Interested A/E firms must indicate on their Statement of Qualifications, the locations where their services will be
performed in the spaces provided or by attachment in accordance with the requirements of Executive Order 2019-12D
related to providing services only within the United States and the requirements of Executive Order 2022-02D prohibiting
purchases from or investment in any Russian institution or company. Failure to do so may cause their Statement of
Qualifications to be rejected.
J. Submittal Instructions
Firms are required to submit the current version of Statement of Qualifications (Form F110-330) available via the OFCC
website at https://ofcc.ohio.gov.
Electronic submittals, if requested, should be combined into one PDF file named with the project number listed on the
RFQ and your firm’s name, followed by “SOQ”. Use the “print” feature of Adobe Acrobat or similar software for creating a
PDF rather than using a scanner. If possible, please reduce the file size of the PDF. In Acrobat, go to Advanced, then
PDF Optimizer. Electronic submittals are limited to a maximum file size of 25 MB.
Paper copies of the Statement of Qualifications, if requested, should be stapled only. Do not use special bindings or
coverings of any type. Cover letters and transmittals are not necessary.
CD/DVD copies of the Statement of Qualifications, if requested, should have the sleeve labeled with the project number
and firm name, followed by “SOQ”.
Facsimile copies of the Statement of Qualifications will not be accepted.
Firms are requested to identify professional registrations, memberships and credentials including: LEED GA, LEED AP,
LEED AP+, CCCA, CCM, CCS, CDT, CPE, DBIA, and any other appropriate design and construction industry credentials.
Identify that information on the resume page for individual in Block 22, Section E of the F110-330 form.
F110-02-2026-JAN
Publish Date: 7/24/2026
Page 4 of 5
Registered Design Professional Selection Rating Form
State of Ohio Standard Forms and Documents
Delaware State Park Campground Camp-
Project Name store/Check-in Replacement
Project Number DNR-270073
Proposer Firm
City, State, Zip
Selection Criteria
1. Primary Firm Location, Workload and Size (Maximum 10 points)
a. Proximity of firm to project site
b. Amount of fees awarded by Contracting Authority in
previous 24 months
c. Number of licensed professionals
Less than 150 miles
150 miles to 250 miles
More than 250 miles
Less than $1,000,000
$1,000,000 to $2,000,000
More than $2,000,000
Less than 5 professionals
5 to 10 professionals
More than 10 professionals
2. Primary Firm Qualifications (Maximum 30 points)
a. Project management lead
b. Project design lead
c. Technical staff
d. Construction administration staff
Experience / ability of project manager to
manage scope / budget / schedule / quality
Experience / creativity of project designer to
achieve owner’s vision and requirements
Experience / ability of technical staff to create
fully coordinated construction documents
Experience / ability of field representative to
identify and solve issues during construction
3. Key Consultant Qualifications (Maximum 20 points)
a. Key discipline leads
b. Proposed EDGE-certified Consultant participation*
Experience / ability of key consultants to
perform effectively and collaboratively
One point for every 2 percent increase in
professional services over the EDGE
participation goal
4. Overall Team Qualifications (Maximum 10 points)
a. Previous team collaboration
b. LEED** Registered / Certified project experience
c. BIM project experience
d. Team organization
Less than 4 sample projects
4 to 6 sample projects
More than 6 sample projects
Registered LEED v4.0 or v4.1 projects
Certified LEED v4.0 or v4.1 projects
Training and knowledge
Direct project experience
Clarity of responsibility / communication
demonstrated by table of organization
5. Overall Team Experience (Maximum 30 points)
a. Previous team performance
b. Experience with similar projects / delivery methods
c. Budget and schedule management
d. Knowledge of Ohio Capital Improvements process
Past performance as indicated by
evaluations and letters of reference
Less than 4 projects
4 to 6 projects
More than 6 projects
Performance in completing projects within
original construction budget and schedule
Less than 4 projects
4 to 8 projects
More than 8 projects
Value
Score
5
2
0
2
1
0
1
2
3
Max
=3
0 - 10
0 - 10
0-5
0-5
Max
= 20
0 - 15
0-5
1
2
3
Max
=3
0
0
Max
=0
0
1
Max
3
=3
0-2
0 - 10
0-3
4-6
7 - 10
0-5
0-1
2-3
4-5
* Must be comprised of registered professional design consulting firms and NOT the lead firm - For more
information on scoring this and other criteria refer to Document F199-01 - PS Selection Rating Rubric.
** Leadership in Energy & Environmental Design administered by Green Business Certification Inc.
Notes:
Evaluator:
Name
Subtotal
F110-02-2026-JAN
Signature
Publish Date: 7/24/2026
Date
Page 5 of 5
This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Basic Information Solicitation # RFQ033458 Solicitation Type IFB Document Title Kent Fairwood Storm

City of Columbus

Due by 9/16/2026

Solicitation ID: SRC0000041428 Solicitation Name: PWC Headlands Beach Roof Replacement Two Restrooms Original

State Government of Ohio

Due by 9/18/2026

Project ID: Title: Access Garage Door Replacements Addenda: 0 Release Date: 8/24/2026 Due

Southwest Ohio Regional Transit Authority

Due by 9/14/2026

IFB 2026-019 Exterior Building Restoration (Poindexter Place) IFB 2026-019 Exterior Building Restoration (Poindexter

Columbus Metropolitan Housing Authority

Due by 10/05/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.