208 DeKalb Street - Municipality of Norristown Historical Façade Improvements

Agency: Norristown borough
State: Pennsylvania
Type of Government: State & Local
Posted Date: Jun 24, 2026
Due Date: Jul 22, 2026
Solicitation No: 224020-208DS
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Number: 224020-208DS
Bid Title: 208 DeKalb Street - Municipality of Norristown Historical Façade Improvements
Category: BIDS
Status: Open
Bid Recipient: Municipality of Norristown – Attn: Jayne Musonye
Description:

This project consists of historical façade improvements at 208 DeKalb Street in Norristown, Pennsylvania. The work generally includes stabilization, restoration, repair, and selective replacement of existing stone panels and related façade improvements intended to preserve and enhance the building's historic character. The project generally includes alternate work as identified in the project documents.

Note: This description is intended as a general overview of the project. For complete details regarding the scope of work, refer to the project drawings, specifications, and associated project documentation.

Publication Date/Time:
6/24/2026 10:00 AM
Closing Date/Time:
7/22/2026 4:00 PM
Pre-bid Meeting:
07/08/2026 at 02:30PM
Contact Person:
All questions must be submitted via email to Amy Baade at abaade@lga-partners.com.

Please include the project address in the subject line of your email. Questions will not be accepted or answered by phone and must be submitted no later than Wednesday, July 15, 2026, at 5:00 PM ET. No questions will be addressed after that date and time.

Municipality of Norristown
Planning and Municipal Development Department

Jayne Musonye
Email: jmusonye@norristown.gov

Download Available:
Yes
Fee:
$10
Plan & Spec Available:
Hard copies of plan and specifications can be picked up at the Municipality of Norristown's Department of Planning and Municipal Development for a fee.
Business Hours:
08:30 AM - 04:30 PM
Qualifications:
Bidders must be properly licensed and qualified under applicable laws governing their respective trades and demonstrate experience performing similar restoration and exterior improvement projects. Contractors shall be capable of obtaining all required insurance and must comply with all applicable federal, state, and local laws, regulations, and requirements, including those related to safety, labor, and nondiscrimination. Bidders shall provide evidence of their qualifications and ability to successfully complete the work in accordance with the Contract Documents.
Special Requirements:
A mandatory pre-bid conference will be held at the project site, and attendance is required for all prospective bidders. Bids must be submitted in sealed envelopes on the forms provided, prior to the specified deadline, and clearly labeled in accordance with the bid instructions. Contractors are responsible for reviewing all contract documents, visiting the project site, and accounting for existing conditions when preparing their bids. No late submissions will be accepted.
Miscellaneous:
All project-related questions must be submitted via email to the Architect’s representative, Amy Baade, with the project name clearly indicated in the subject line. No questions will be accepted by phone, and all inquiries must be submitted prior to the deadline established in the Bid Documents. Additional coordination may be directed through the Municipality of Norristown’s Department of Planning & Municipal Development.
Related Documents:

Attachment Preview

208 DEKALB STREET
NORRISTOWN, PA 19401
DRAWING LIST
Sheet Number Sheet Name Sheet Issue Date
BID SET
06/24/2026
The scope of work at 208 DeKalb Pike is to stabilize the existing stone panels along the sidewalk at the front
(Dekalb St) elevation and south side elevation, including stabilizing the panels to the masonry backup wall,
repairing cracks, spalls, and holes, and where necessary, replacing stone panels.
G-000 COVER SHEET 06/24/2026
G-001 STONE REPAIR SPECIFICATIONS 06/24/2026
BASE BID: Repair of existing stone panels along sidewalk. All other areas existing to remain.
ALTERNATE #1: Scrape and paint wood dormers and cornice along full perimeter of roof. Refer to 2/A- 201.
A-201 ELEVATION, DETAILS 06/24/2026
1. Do not scale the drawings.
2. The Contractor is responsible for complying with all applicable codes.
3. The Contractor shall verify all dimensions in the field. Report discrepancies to the Architect for
decisions prior to proceeding with the work.
4. Masonry dimensions on plans, elevations, and sections are nominal. Masonry dimensions on details
are actual.
5. All quantities shown in schedules are for reference only. Contractor to verify all quantities.
GRANT MANAGER:
Municipality of Norristown
235 East Airy Street
Norristown, PA 19401 -5003
Contact: Vincent Poppa
PROPERTY OWNER:
Greater Norristown Society of Arts
208 DeKalb Street
Norristown, PA 19401
Contact: Stan Huskey
ARCHITECT:
Landmarks LGA
444 Liberty Avenue, Suite 1500
Pittsburgh, PA 15222
Contact: Amy Ahn Baade, AIA
FACADE
IMPROVEMENTS
208 DEKALB STREET
NORRISTOWN, PA 19401
G - 000

PROJECT DESCRIPTION
The scope of work at 208 DeKalb Pike is to stabilize the existing stone panels along the sidewalk at the front
(Dekalb St) elevation and south side elevation, including stabilizing the panels to the masonry backup wall,
repairing cracks, spalls, and holes, and where necessary, replacing stone panels.
ALTERNATE #1: EXTERIOR PAINTING
BASE BID: Repair of existing stone panels along sidewalk. All other areas existing to remain.
ALTERNATE #1: Scrape and paint wood dormers and cornice along full perimeter of roof. Refer to 2/A-201.
PROJECT TEAM
GENERAL PROJECT NOTES
1. Do not scale the drawings.
2. The Contractor is responsible for complying with all applicable codes.
3. The Contractor shall verify all dimensions in the field. Report discrepancies to the Architect for
decisions prior to proceeding with the work.
4. Masonry dimensions on plans, elevations, and sections are nominal. Masonry dimensions on details
are actual.
5. All quantities shown in schedules are for reference only. Contractor to verify all quantities.
ISSUE DATE:
LANDMARKS PROJECT NO.
N
ARCHITECT OF RECORD: LGA PARTNERS
O
I
T
C
U
R
T
S
N
O
C
R
O
F
T
O
N
VICINITY MAP
PROJECT SITE
T
S
B
AL
K
E
D
E MAIN
ST
T
S
N
E E
R
G
E LAFAYETTE
ST
REVISIONS
E MAIN
ST
T
S
AL B
S T E LAFAYETTE
ST G R
E E N
K
E
D
NOTE: DO NOT SCALE FROM DRAWINGS.
VERIFY ALL DIMENSIONS ON SITE.
tvr.7KUCKedaaba_lartneC_52R_blaKeD
802_NWOTSIRRON\stcejorP
tiveR\stnemucoD\edaaba\sresU\:C
MA
24:71:01
6202/42/6
MUNICIPALITY OF NORRISTOWN
FACADE IMPROVEMENTS
208 DEKALB STREET
NORRISTOWN, PA 19401
DRAWING LIST
BID SET
Sheet
Number Sheet Name Sheet Issue Date
06/24/2026 GENERAL
G-000 COVER SHEET 06/24/2026
G-001 STONE REPAIR SPECIFICATIONS 06/24/2026
ARCHITECTURAL
A-201 ELEVATION, DETAILS 06/24/2026
GRANT MANAGER:
Municipality of Norristown
235 East Airy Street
Norristown, PA 19401-5003
Contact: Vincent Poppa
PROPERTY OWNER:
Greater Norristown Society of Arts
208 DeKalb Street
Norristown, PA 19401
Contact: Stan Huskey
ARCHITECT:
Landmarks LGA
444 Liberty Avenue, Suite 1500
Pittsburgh, PA 15222
Contact: Amy Ahn Baade, AIA
BID SET
06/24/2026
224020
FACADE
IMPROVEMENTS
208 DEKALB STREET
NORRISTOWN, PA 19401
MUNICIPALITY OF NORRISTOWN
NO. DATE DESCRIPTION
COVER SHEET
G-000

SECTION 040122
STONE RESTORATION
PART 1 -
1.01
A.
RELATED DOCUMENTS
DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING G ENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 1 SPECIFICATION SECTION
APPLY TO THIS SECTION
SECTION SUMMAR
EXTERIOR APPLICATIONS
ACCEPTABLE CURING METHODS INCLUDE COVERING WITH WET BURLAP AND POLYETHYLENE SHEETED PANELS, PERIODIC HAND MISTING, AND
PERIODIC MIST SPRAYING USING SYSTEM OF PIPES, MIST HEADS, AND T IMERS.
ADJUST CURING METHODS TO ENSURE THAT POINTING MORTAR IS DAMP T HROUGHOUT ITS DEPTH WITHOUT ERODING SURFACE MORTAR.
FOR HYDRAULIC LIMES, RETENTION OF MOISTURE WITHIN THE MORTAR FO R THE FIRST SEVERAL DAYS [MINIMUM OF 96 HOURS] IS CRITICAL TO E NSURE THAT
THE HYDRAULIC SET TAKES PLACE BECAUSE ITS HYDRAULIC CONSTITUEN TS REACT WITH WATER ITSELF. THEREAFTER, THE REMAINING CARBONATIO NSET
REQUIRES CYCLICAL LIGHT DAMPING AND SLOW DRYING. FOLLOW MANU FACTURER 'S INSTRUCTIONS REGARDING THE TREATMENT OF THE MORTAR JOINTS
THROUGHOUT THE DURATION OF THE CURING PROCESS.
HAIRLINE CRACKING WITHIN MORTAR OR MORTAR SEPARATION AT EDGE OF A JOINT IS UNACCEPTABLE. COMPLETELY REMOVE SUCH MORTAR AND RE POINT
. . DAVIS COLORS "TRUE TONE MORTAR COLORS", LOS ANGELES, CA, WWW.D AVISCOLORS.COM (800) -356- 4848.
SOLOMON GRIND-C HEM SERVICES, INC. "SGS MORTAR COLORS", SPRINGF IELD, IL, WWW.SOLOMONCOLORS.COM (800) -624
MORTAR MIXE
MEASUREMENT AND MIXING: MEASURE CEMENTITIOUS AND AGGREGATE MA TERIAL IN A DRY CONDITION BY VOLUME OR EQUIVALENT WEIGHT. DO NOT MEASURE BY
SHOVEL; USE KNOWN MEASURE. MIX MATERIALS IN A CLEAN MECHANICALB ATCH MIXER
MIXING POINTING MORTAR: THOROUGHLY MIX CEMENTITIOUS AND AGGREGA TE MATERIALS TOGETHER BEFORE ADDING ANY WATER. THEN MIX AGAIN,A DDING ONLY
ENOUGH WATER TO PRODUCE A DAMP, UNWORKABLE MIX WHICH WILL RETAI N ITS FORM WHEN PRESSED INTO A BALL. MAINTAIN MORTAR IN THIS DAMP
CONDITION FOR 1 TO 2 HOURS. ADD REMAINING WATER IN SMALL PORTIONS UNTIL MORTAR OF DESIRED CONSISTENCY IS REACHED. USE MORTAR WIT
MINUTES OF FINAL MIXING; DO NOT RE-T EMPER OR USE PARTIALLY HARDENE D MATERIAL
POINTING MORTAR: ONE PART PORTLAND CEMENT, ONE PART LIME A NDSIX PARTS MORTAR AGGREGATE. COMPLY WITH ASTM C 270, PROPORTIO
SPECIFICATION, TYPE N, 750 P.S.I
REBUILDING MORTAR: COMPLY WITH ASTM C 270, PROPORTION SPEC
1.02
A.
2.03
A.
1. REPLACE OR REPAIR STONEWORK IN DESIGNATED AREAS
2. REPOINTING OF DESIGNATED AREAS OF STONEWORK
3. DISMANTLE AND REBUILD AREAS SHOWN; NEW STONE TO MATCH EXISTI NG ON EXTERIOR AND INTERIOR
1.03
A.
B.
DEFINITIONS
REPOINTING: THE PROCESS OF RAKING OUT (REMOVING) MORTAR AND R EPLACING IT WITH NEW MORTAR.
PATCH POINTING: THE PROCESS OF PLACING NEW MORTAR IN EXISTING JOINT SPACES, WHICH HAVE PREVIOUSLY BEEN RAKED OUT. THIS TERMDOE S NOT INCLUDE
THE RAKING OUT PROCESS.
GROUT [TUCK] POINTING: THE PROCESS OF TOUCHING UP EXISTING MO RTAR JOINT BY FILLING IN RECESSES WITH NEW MORTAR, WITHOUT FIRST RA KING OUT THE
JOINTS
MATCH EXISTING: NEW MATERIALS AND PRODUCTS SHALL MATCH EXISTI NG IN MATERIAL, SIZE, SHAPE, PROFILE, CONFIGURATION, COLOR, TE
TOOLING, QUALITY OF WORKMANSHIP AND VISUAL APPEARANCE. REPLAC EMENT MATERIALS SHALL NOT BE VISUALLY DISCERNABLE FROM ADJACENT EX ISTING
MATERIALS, EXCEPT FOR MINOR DIFFERENCE RELATING TO WEATHERING OR AGING
3.08
A.
PATCHING
PATCHING AND REPAIR OF MISCELLANEOUS CRACKS IN EXISTING FACADE.
REPAIR FACADE CRACKS IN STONE UNLESS DIRECTED ON DRAWINGS TO " REBUILD" CRACKED AREAS OR "SAW CUT" CRACKED AREAS. (ASSUME 100 LINEAR
FEET OF REPAIR
. ABOVE GRADE MORTAR: TYPE "N
CRACK SIZE (WIDTH)
1/64" (.39MM) OR LESS
PROCEDURE
REPOINT CRACKED MORTAR JOINT
NO REPAIR OR REPLACEMENT REQUIRED.
REPOINT CRACKED MORTAR JOINT
PRESSURE INJECT GROUT INTO STONE CRACKS OR REPLACE MATERIAL.
3. SETTING BUTTONS: LEAD OR PLASTIC BUTTONS OF THE THICKNESS RE QUIRED FOR THE JOINT SIZE INDICATED, AND OF THE SIZE REQUIRED TO M
U NIFORM JOINT WIDTH
4. SEALANT: REFER TO SECTION 079200 -J OINT SEALANTS.
D.
E.
SALVAGE/RETAIN: CAREFULLY REMOVE MATERIALS OF COMPONENTS IN A
REMOVE: D ETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLY DISPOSE OF THEM OFF - SITE UNLESS INDICATED TO BE REMOVED AND SALVA GED OR
REMOVED AND REINSTALLED.
DISASSEMBLE AND SALVAGE: CAREFULLY DETACH FROM EXISTING CONS
DISASSEMBLE AND REINSTALL: CAREFULLY DETACH ITEMS FROM EXISTIN G CONSTRUCTION, PREPARE FOR REUSE, AND REINSTALL WHERE INDICATED
EXISTING TO REMAI N: E XISTING ITEMS OF CONSTRUCTION THAT ARE NO T TO BE PERMANENTLY REMOVED AND THAT ARE NOT OTHERWISE INDICATE
REMOVED, REMOVE D AND SALVAGED, OR REMOVED AND REINSTALLED.
DISMANTLE: TO REMOVE BY DISASSEMBLING OR DETACHING AN ITEM FR OM A SURFACE, USING GENTLE METHODS AND EQUIPMENT TO PREVENT DAMA GE TO THE ITE
AND SURFACES; DISPOSING OF ITEMS UNLESS INDICATED TO BE SALVAG
SUBMITTALS
PRODUCT DATA FOR EACH PRODUCT INDICATED INCLUDING RECOMMEND ATIONS FOR THEIR APPLICATION AND USE. INCLUDE TEST REPORTS AND CE
SUBSTANTIATING THAT PRODUCTS COMPLY WITH REQUIREMENTS.
SAMPLES FOR VERIFICATION PURPOSES, PRIOR TO ERECTING THE MOCKU P, OF THE FOLLOWING:
2.04
A.
MISCELLANEOUS MATERIALS
STONE- TO- STONE ADHESIVE: TW O-PART POLYESTER RESIN STONE ADHESIV E WITH A 15 -TO 30 - MINUTE CURE AT 70 DEGREES F (21 DEGREES C), IN FO RMULATION
(KNIFE OR FLOWING GRADE) RECOMMENDED BY ADHESIVE MANUFACTURER F OR TYPE OF STONE REPAIR INDICATED, AND IN COLOR INDICATED OR, IFN
OTHERWISE INDICATED, AS SELECTED BY ARCHITECT FROM TINTED OR STA
1. AKEMI NORTH AMERICA; " AKEPOX "HOLBROOK, NY, WWW.AKEMI.COM (877)-GO- AKEMI.
2. BONSTONE MATERIALS CORPORATION; " FAST SET 41 " MUKWONAGO, WI WWW.BONSTONE.COM (800)- 425 -221
3. EDISON COATINGS, INC.; "FLEXI- WELD 520T ", PLAINVILLE, CT, WWW.EDISONCOATINGS.COM (800) -69 7-8055.
MORTA R- TO -STONE ADHESIVE: HI GH- MODULUS, HIGH -STRENGTH, MOISTURE
40 DEGREE F (4 DEGREES C).
3.09
A.
B.
C.
3.10
A.
APPLICATION OF JOINT SEALANT
REFER TO SECTION 079200 - JOINT SEALANTS.
REPLACE DETERIORATED SEALANT CRACKED SEALANT, MISSING SEALANT, AND SEALANT NOT BONDED TO ADJACENT SURFACES.
F.
G.
H.
MISCELLANEOUS WORK
PAINTING STEEL UNCOVERED DURING THE WORK, INSPECT STEEL EXPOSE D DURING MASONRY REMOVAL. WHERE ARCHITECT DETERMINES THAT IT IS STRUCTURAL,
OR FOR OTHER REASONS CANNOT BE TOTALLY REMOVED, PREPARE AND PA INT IT AS FOLLOWS
1.04
A.
REMOVE PAINT, RUST, AND OTHER CONTAMINANTS ACCORDING TO SSPC- SP2, "HAND TOOL CLEANING" AS APPLICABLE TO MEET PAINT MANUFAC TURER'S
RECOMMENDED PREPARATION.
IMMEDIATELY PAINT EXPOSED STEEL WITH TWO COATS OF ANTIRUS T COATING, FOLLOWING COATING MANUFACTURER'S WRITTEN INSTRUCTIONS AN
WITHOUT EXCEEDING MANUFACTURER'S RECOMMENDED RATE OF APPLICA TION (DRY FILM THICKNESS PER COAT).
IF ON INSPECTION AND RUST REMOVAL, THE CROSS SECTION OF A STEEL MEMBER IS FOUND TO BE REDUCED FROM RUST BY MORE THAN 1/8 INC
NOTIFY ARCHITECT BEFORE PROCEEDING.
PRODUCT: SUBJECT TO COMPLIANCE WITH REQUIREMENTS, PROVIDE SIKADUR H I-MOD EPOXY, SIKASTIX 370, SIKA CORPORATION, LYNHURST NJ
WWW.SIKACORP.COM (80 0)-933- SIKA.
STONE CONSOLIDATION TREATMENT: READY-T O-USE PRODUCT DESIGNEDF OR THE CONSOLIDATION OF MASONRY MATERIALS THAT HAVE DETERIORATE D DUE TO
WEATHERING AND POLLUTANT E XPOSURE. TREATMENT SHALL BE COMPOSE
1. AKEMI NORTH AMERICA; " AKEPOX " HOLBROOK, NY, WWW.AKEMI.COM (877)-GO- AKEMI.
2. BONSTONE MATERIALS CORPORATION; " FAST SET 41 " MUKWONAGO, WI WWW.BONSTONE.COM (800)-4 25- 2214
3. DIEDRICH TECHNOLOGIES, INC. "303H40 STONE CONSOLIDANT", OAK CREEK, WI, WWW.DIEDRICHINDUSTRIES.COM (800) -323 -3565.
4. EDISON COATINGS, INC.; "FLEXI- WELD 520T "P LAINVILLE, CT, WWW.EDISONCOATINGS.COM (800)- 697 -8055.
5. PRO SO CO, INC. "CONSERVARE OH STONE STRENGTHENER", KANSAS CITY, KS, WWW.PROSOCO.COM (913) -281 -2700.
STONE PATCHING MATERIALS: CEMENT BASED MORTAR THAT IS USED TO PA TCH AND RESTORE DAMAGED DETERIORATED NATURAL STONE; PIGMENTED TO MATCH
STONE COLOR. USE FORMULATION THAT IS VAPOR AND WATER PERMEABLE ( EQUAL TO OR USE FORMULATION HAVING WORKING QUALITIES AND RETARD
CONTROL TO PERMIT FORMING AND SCULPTURING WHERE NECESSARY. FORM ULATE PATCHING COMPOUND IN COLORS, TEXTURES, AND GRAIN TO MATC
BEING PATCHE
EACH NEW EXPOSED MASONRY MATERIAL TO BE USED FOR REPLACING EX ISTING MATERIALS. INCLUDE IN EACH SET OF SAMPLES THE FULL RA NGEOF COLORS
AND TEXTURES TO BE EXPECTED IN THE COMPLETED WORK.
EACH TYPE OF MORTAR FOR POINTING AND MASONRY REBUILDING AND R EPAIR IN THE FORM OF SAMPLE MORTAR STRIPS 6 INCHES (152MM) L ONG BY 1
INCH (12MM) WIDE SET IN ALUMINUM OR PLASTIC CHANNELS.
EACH TYPE OF REPAIR ANCHOR.
3.11
A.
TOOLING STONE
AT LOCATIONS INDICATED, REMOVE FLAKING OR FRAGMENTED STONE DO WN TO SOUND STONE. NOTIFY PROFESSIONAL IF DEPTH OF REMOVED STON E EXCEEDS 3/4 -
INCH (19 MM).
TOOL THE STONE SURFACE TO MATCH THE ORIGINAL STONE FINISH. U SE HAND OR PNEUMATIC CHISELS AND DIAMOND POLISHING/GRINDING PADS.
1. BEVEL EDGES OF TOOLED AREAS APPROXIMATELY 45 DEGREES.
2. WHERE THE RE- TOOLED AREA IS ABOVE A MORTAR JOINT, TOOL AN D BEVEL THE STONE BELOW TO SHED WATER.
QUALIFICATION DATA FOR FIRMS AND PERSONS SPECIFIED IN THE "QUAL ITY ASSURANCE" ARTICLE TO DEMONSTRATE THEIR CAPABILITIES AND EXPER IENCE.
INCLUDE A LIST OF COMPLETED PROJECTS WITH PROJECT NAMES, ADDRE SSES, NAMES OF ARCHITECTS AND OWNERS, AND OTHER INFORMATION SPE CIFIED.
RESTORATION PROGRAM FOR EACH PHASE OF THE RESTORATION PROCES S, INCLUDING PROTECTION OF SURROUNDING MATERIALS ON BUILDING AND
DURING OPERATIONS. DESCRIBED IN DETAIL THE MATERIALS, METHODS ,AND EQUIPMENT TO BE USED FOR EACH PHASE OF THE RESTORATION WORK.
IF ALTERNATIVE METHODS AND MATERIALS TO THOSE INDICATED ARE PR OPOSED FOR ANY PHASE OF RESTORATION WORK, PROVIDE A WRITTEN DESCR IPTION
INCLUDING EVIDENCE OF SUCCESSFUL USE ON OTHER COMPARABLE PRO JECTS, AND A TESTING PROGRAM TO DEMONSTRATE THEIR EFFECTIVENESS FO RTHIS
PROJECT.
3.12
A.
FINAL CLEANING
AFTER MORTAR HAS FULLY HARDENED, THOROUGHLY CLEAN EXPOSED MAS ONRY SURFACES OF EXCESS MORTAR AND FOREIGN MATTER; USE WOOD SCR APERS, STIFF
NYLON OR FIBER BRUSHES, AND CLEAN WATER, APPLIED BY LOW PRESSUR E SPRA
CATHEDRAL STONE COMPANY, INC.; "JAHN RESTORATION MORTAR M7 0 AND M70 SPECIAL"; INCLUDING TOTAL RECONSTRUCTION, HANOVER, MD,
WWW.CATHEDRALSTONE.COM (8 00)-68 4-0901
CONPROCO CORP.; "MIMIC",DOVER, NH, WWW.COMPROCO.COM (800 )-258-3500.
EDISON COATINGS, INC. " CUSTOM SYSTEM 45" , PLAINVILLE, CT WWW.EDISONCOATINGS.COM (800 )-69 7-8 055.
PRIMERS AS RECOMMENDED BY PATCHING MATERIAL MANUFACTURER
1. DO NOT USE METAL SCRAPERS OR BRUSHES.
2. DO NOT USE ACIDIC OR ALKALINE CLEANERS.
1.05
A.
2.
3.
4.
RESTORATION SPECIALIST: ENGAGE AN EXPERIENCED MASONRY RESTOR ATION AND CLEANING FIRM THAT HAS SPECIALIZED IN THE TYPES OF WORK REQUIRED FOR
THIS PROJECT. AT CONTRACTOR'S OPTION, THE WORK MAY BE DIVIDED B ETWEEN TWO SEPARATE FIRMS; ONE FOR CLEANING AND ONE FOR REPAIR W
B.
C.
D.
CLEAN ADJACENT NON- MASONRY SURFACES. USE DETERGENT AND SOFT B RUSHES OR CLOTHS.
CLEAN MORTAR AND DEBRIS FROM ROOF; REMOVE DEBRIS FROM GUTTERS AND DOWNSPOUTS. RINSE OFF
REMOVE MASKING MATERIALS, LEAVING NO RESIDUES THAT COULD TRAP
ROOF AND FLUSH GUTTERS AND DOWNSPO UTS.
WORK MUST BE PERFORMED BY A FIRM HAVING NOT LESS THAN 5 YEARS SUCCESSFUL EXPERIENCE IN COMPARABLE MASONRY RESTORATION PROJECTS
EMPLOYING PERSONNEL SKILLED IN THE RESTORATION PROCESSES AND OPERATIONS INDICATED.
FIELD SUPERVISION: REQUIRE RESTORATION SPECIALIST FIRM TO MAIN TAIN AN EXPERIENCED FULL - TIME SUPERVISOR ON THE JOB SITE DURI NG TIMES THAT
CLAY MASONRY RESTORATION AND CLEANING ARE IN PROGRESS.
FIELD -C ONSTRUCTION MOCKUPS: PRIOR TO STARTING STONE RESTORAT ION, PREPARE THE FOLLOWING SAMPLE TEST AREAS ON THE BUILDING WHER E DIRECTED BY
ARCHITECT. PREPARE SAMPLE TEST AREAS USING SAME MATERIALS AND METHODS PROPOSED FOR THE WORK, AND UNDER SAME WEATHER CONDITIO NS TO B
EXPECTED DURING THE RESTORATION. OBTAIN ARCHITECT'S ACCEPTANC E OF VISUAL QUALITIES BEFORE PROCEEDING WITH MASONRY RESTORATION . RETAIN
ACCEPTABLE TEST AREAS IN AN UNDISTURBED CONDITION, SUITABLY MA RKED, DURING CONSTRUCTION AS A STANDARD FOR JUDGING THE COMPLET ED WOR
NOTIFY OWNER ONE WEEK IN ADVANCE OF DATES AND TIMES WHEN SAM PLE TEST AREAS WILL BE PREPARED. PREPARE A MINIMUM OF THREE T EST ARE
SHOWING V ARIOUS RESTORATION METHODS.
REPOINTING: PREPARE 2 SEPARATE SAMPLE AREAS OF APPROXIMATELY 3 FT. (900MM) HIGH BY 3 FT. (900MM) WIDE FOR EACH TYPE OF REPOIN
REQUIRED; ONE FOR DEMONSTRATING METHODS AND QUALITY OF WORKMAN SHIP EXPECTED IN REMOVAL OF MORTAR FROM JOINTS AND THE OTHER F
DEMONSTRATING QUALITY OF MATERIALS AND WORKMANSHIP EXPECTED IN POINTING MORTAR JOINTS. SEPARATE SAMPLES OF EACH TYPE ARE REQUIR ED FO
STONEWORK AND FOR BRICKWORK.
MASONRY REPAIR: PREPARE SAMPLE PANELS OF SIZE INDICATED FOR EA CH TYPE OF MASONRY MATERIAL INDICATED TO BE PATCHED, REBUIL T OR REPLACED.
ERECT MOCK - UP PANELS INTO AN EXISTING WALL, UNLESS OTHERWISE
SEPARATE SAMPLES OF EACH TYPE ARE REQUIRED FOR STONEWORK AND FOR BRICKWORK.
2.05
A.
STONEWORK ACCESSORIE
ANCHORS, DOWELS AND FASTENING: THE SETTING CONTRACTOR SHALL FUR NISH AND SET ALL ANCHORS, DOWELS, ANGLES, BOLTS, AND RODS REQUI
INSTALL STONE UNLESS OTHERWISE SPECIFIED. SHOW ANCHORS, DOWELS, BOLTS, RODS AND OTHER DEVICES ON SHOP DRAWINGS.
ANCHOR BOLTS, NUTS AND WASHERS: THREADED FASTENERS TYPE 3 04/316 STAINLESS STEEL.
STONE ANCHORS: TYPE AND SIZE INDICATED OR, IF NOT INDICATED ,AS REQUIRED TO SECURELY ANCHOR AND FASTEN STONEWORK IN PLACE B
HORIZONTALLY AND VERTICALLY. FABRICATE ANCHORS AND DOWELS FROM AISI TYPE 302/304 STAINLESS STEEL ; ASTM A 240/A 240M. MINIMU M TWO (2)
DOWELS FOR EACHSTONE COPING PIECE. PROVIDE STRAP ANCHORS AT HEAD OF STONE LINTELS, 2 MINIMUM PER EACH 4 FOOT LENGTH OF LINT
SETTING BUTTONS: LEAD OR PLASTIC BUTTONS OF THE THICKNESS R EQUIRED FOR THE JOINT SIZE INDICATED, AND OF THE SIZE REQUIRED TO MAINTAIN
1.
2.
PART 3 -
3.01
A.
3.02
A.
B.
GENERAL
RESTORATION MATERIALS SHALL BE INSTALLED IN STRICT ACCORDANCEWIT
BUILDING SURVEY
CONTRACTOR SHALL SURVEY MASONRY AND STONE JOINTS IN DETAIL TODE TERMINE REPAIR AND REPLACEMENT WORK NECESSARY FOR RESTORATION.
BEFORE PROCEEDING WITH REPAIR FOR REPOINTING WORK THE CONTRACTO R SHALL CAREFULLY EXAMINE ALL MASONRY AND STONE MORTAR JOINTS FO
SOUNDNESS AND EXTENT OF DETERIORATION.
PREPARATIO
PROTECT PERSONS, MOTOR VEHICLES, SURROUNDING SURFACES OF BUILDIN G WHOSE MASONRY AND STONE SURFACES ARE RESTORED, BUILDING SITE
SURROUNDING BUILDINGS FROM INJURY RESULTING FROM MASONRY RESTO RATION WORK.
UNUSED ANCHOR REMOVAL
C.
1.06
A.
REFERENCES: U.S. DEPARTMENT OF THE INTERIOR, HERITAGE CONSERVA TION AND RECREATION SERVICE PRESERVATION BRIEFS
PROJECT/SITE CONDITIONS
PROTECT PERSONS, MOTOR VEHICLES, SURROUNDING SURFACES OF BUIL DING WHOSE MASONRY SURFACES ARE BEING RESTORED, BUILDING SITE, A
SURROUNDING BUILDINGS FROM INJURY RESULTING FROM MASONRY RESTORAT ION WORK. ERECT TEMPORARY PROTECTION COVERS AS REQUIRES.
DO NOT REPOINT MORTAR JOINTS OR REPAIR MASONRY UNLESS AIR TEMP ERATURES ARE BETWEEN 40 DEGREES F (4 DEGREES C) AND 80 DEGREES F (27 DEGREES C)
AND WILL R EMAIN SO FOR AS LEAST 48 HOURS AFTER COMPLETION OF W ORK. WHEN TEMPERATURE FALLS BELOW 32 DEGREES F (0 DEGREES C), PR OVIDE A
TEMPORARY ENCLOSURE WORK AREA, DAY AND NIGHT; PROVIDE TEMPORARYHE
HOT WEATHER REQUIREMENTS: PROTECT RESTORATION WORK WHEN TEM PERATURE AND HUMIDITY CONDITIONS PRODUCE EXCESSIVE EVAPORATION OF WATER FRO
MORTAR AND PATCHING MATERIALS. PROVIDE ARTIFICIAL SHADE AND W IND BREAKS AND USE COOLED MATERIALS AS REQUIRED. DO NOT APPLY MO RTAR TO
SUBSTRATES WITH TEMPERATURES OF 90 DEG F (32 DEG C) AND ABOVE.
PREVENT GROUT OR MORTAR USED IN REPOINTING AND REPAIR WORK FR OM STAINING FACE OF SURROUNDING MASONRY AND OTHER SURFACES. RE
IMMEDIATELY GROU T AND MORTAR IN CONTACT WITH EXPOSED MASONR Y AND OTHER SURFACES.
PROTECT SILLS, LEDGES AND PROJECTIONS FROM MORTAR DROPPINGS.
CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING HARDNESS O F EXISTING MORTAR JOINTS PRIOR TO SUBMITTING BID.
TAKE GREAT CARE TO PREVENT DAMAGE TO EXISTING MATERIALS. USE T HE GENTLEST MEANS AND METHODS AVAILABLE TO CARRY OUT THE WORK IN
SPECIFIED. TEST A ND PRACTICE MEANS AND METHODS IN INCONSPICUO US AREAS UNTIL IT IS DETERMINED THAT THEY CAN BE CARRIED OUT WITHO UT DAMAGE TO
MATERIALS SCHEDULED TO REMAIN.
PRECONSTRUCTION TESTING
PRECONSTRUCTION MORTAR TESTING: ANALYSIS OF EXISTING BEDDING AND POINTING MORTAR; CAREFULLY REMOVE EXISTING MORTAR FROM WITH
FIVE [5] LOCATIONS DESIGNATED BY PROFESSIONAL OR TESTING SERVIC
TEMPORARY PATCH: AS DIRECTED BY PROFESSIONAL, PROVIDE TEMPORA RY MATERIALS FOLLOWED BY PERMANENT REPAIRS AT LOCATIONS FROM WHI
SAMPLES WERE TAKEN.
PROVIDE RECOMMENDED REPLICATION MIX TO MATCH COLOR AND TEXTU RE OF ORIGINAL MORTAR FOR EACH TYPE OF REPOINTING MORTAR.
TEST ACCORDING TO ASTM 295, MODIFIED AS AGREED BY TESTING SERV ICE AND PROFESSIONAL FOR PROJECT REQUIREMENTS, TO DETERMINE PROP ORTIONA
COMPOSITION OFO RIGINAL INGREDIENTS, SIZES AND COLORS OF AGGR EGATES, AND APPROXIMATE STRENGTH. USE X - RAY DIFFRACTION, INFRARED SPECTROSCOPY
AND DIFFERENTIAL THERMAL ANALYSIS TO SUPPLEMENT MICROSCOPICAL METHODS. ANALYSIS TO INCLUDE:
3.03
A.
REMOVE MASONRY ANCHORS, BRACKETS, WOOD NAILERS, AND OTHE R EXTRANEOUS ITEMS NO LONGER IN USE UNLESS IDENTIFIED AS HISTORIC
SIGNIFICANT OR INDICATED TO REMAIN
REMOVE ITEMS CAREFULLY TO AVOID SPALLING OR CRACKING MASON RYOR STONE. WHERE DIRECTED, IF AN ITEM CANNOT BE REMOVED WITHO UT DAMAGING
SURROUNDING MATERIAL, DO THE FOLLOWING
CUT OR GRIND OFF ITEM APPROXIMATELY 3/4 INCH (20 MM) BENEATH S URFACE AND CORE DRILL A RECESS OF SAME DEPTH IN SURROUND
MASONRY AS CLOSE AROUND ITEM AS PRACTICAL.
MMEDIATELY PAINT EXPOSED END OF ITEM WITH TWO COATS OF ANTIRUS
NSTRUCTIONS AND WITHOUT EXCEEDING MANUFACTURER'S RECOMMENDED DRY FILM THICKNESS PER COAT. KEEP PAINT OFF SIDES OF
E.
F.
G.
PATCH THE HOLE WHERE EACH ITEM WAS REMOVED UNLESS DIRECTE D TO REMOVE AND REPLACE THE MASONRY UNIT.
3.04
A.
STONE PATCHING INCLUDING CRACK PATCHING
CUT OUT DETERIORATED STONE AND ADJACENT STONE THAT HAS BEGUN TO DETERIORATE WITH DUTCHMAN REPAIRS. REMOVE ADDITIONAL STONE SO THAT PATCH
WILL NOT HAVE FEATHERED EDGES AND WILL BE AT LEAST 1/4 INCH (6MM)
REMOVE LOOSE PARTICLES, SOIL DEBRIS, OIL AND OTHER CONTAMINATES F ROM EXISTING STONE UNITS AS LOCATIONS INDICATED BY CLEANING WITH
BRISTLE BRUSH
BRUSH- COAT STONE SURFACES WITH MORTAR- TO- STONE ADHESIVE COMPLY ING WITH MANUFACTURER'S DIRECTIONS.
BRUSH- COAT STONE SURFACES WITH A SLURRY COAT OF PATCHING MORTAR COMPLYING WITH MANUFACTURER'S DIRECTIONS.
PLACE PATCHING MORTAR IN LAYERS NO THICKER THAN 2 INCHES (50MM).
BUILD PATCH UP 1/4 INCH (6MM) ABOVE SURROUNDING STONE AND CARVE S
KEEP EACH LAYER DAMP FOR 72 HOURS OR UNTIL MORTAR HAS SET.
UNACCEPTABLE PATCHES ARE DEFINED AS THOSE WITH HAIRLINE CRACKS O R THAT SHOW SEPARATION FROM STONE AT EDGES, AND THOSE THAT DON OT MATCH
ADJOINING STONE IN COLOR OR TEXTURE. REMOVE PATCHES AND REFILLTO PROVIDE PATCHES FREE OF THOSE DEFECTS.
STONE REPAI
CAREFULLY REMOVE LOOSE STONE FRAGMENTS IN AREAS TO BE REPAIRED.
REMOVE SOIL, LOOSE STONE PARTICLES, MORTAR, AND OTHER DEBRIS OR F OREIGN MATERIAL FROM THE SURFACES TO BE BONDED ON BOTH THE FRAG MENT AND
THE BUILDING STONE FROM WHICH FRAGMENT WAS REMOVED BY CLEANING WITH A STIFF BRUSH.
APPLY ADHESIVE TO COMPLY WITH ADHESIVE MANUFACTURER'S DIRECTIONS . COAT BONDING SURFACE OF BUILDING STONE WITH STONE -TO -STONEAD
COMPLETELY FILLING ALL VOIDS AND COVERING ALL SURFACES. FIT STONE FRAGMENT ONTO BUILDING STONE WHILE ADHESIVE IS STILL TACKY AND H
FRAGMENT SECURELY IN PLACE UNTIL ADHESIVE HAS CURED.
AFTER ADHESIVE HAS FULLY CURED, ANCHOR STONE FRAGMENTS FURTHER W ITH 1/4 INCH (6MM) DIAMETER PLAIN STAINLESS STEEL RODS SET INTO 1/ 4 INCH (6MM)
DIAMETER HOLES DRILLED AT A 4 5 DEGREE DOWNWARD ANGLE THROUGH T HE FACE OF THE STONE. CENTER AND SPACE ANCHOR RODS BETWEEN 3 AN D 5 INCHES
(76MM AND 127MM) APART AND NOT LESS THAN 2 INCHES (50MM) FROM ANY
INSERT RODS NOT LESS THAN 2 INCHES (50MM) INTO BACKING STONE AND 2 INCHES (50MM) INTO FRAGMENT WITH END COUNTERSUNK AT LEAST 3/4 I NCH (19MM)
FROM THE EXPOSED FACE OF THE STONE
CLEAN RESIDUAL ADHESIVE FROM EDGES. WET STONE AND FILL CHIPPED AR EAS AND DRILL HOLES WITH PATCHING MORTAR. AVOID FEATHEREDGING.
PATCHED AREAS TO MATCH TEXTURE OF AND BE LEVEL WITH ADJOINING SU RROUNDING STONE SURFACES. KEEP PATCHING MORTAR DAMP FOR 72 HO
STONE CONSOLIDATION TREATMENT
APPLY TREATMENT TO CLEAN, DRY SURFACES ACCORDING TO MANUFACTURE R'S INSTRUCTIONS. REMOVE AREAS OF BLIND EXFOLIATION AND DELAMINA TION BEFORE
APPLYING.
APPLY IN CYCLES (REPEATED APPLICATIONS) TO RELATIVELY SMALL S ECTIONS OF MASONRY, NOT MORE THAN 100 SQ. FT. (9.3M2) IN AREA. EACH CYCLE
CONSIST OF THREE SUCCESSIVE SATURATING APPLICATIONS, APPLIED AT5- TO 15-MINUTE INTERVALS, DEPENDING ON DRYING CONDITIONS.
APPLY BY LOW- PRESSURE SPRAY TO THE POINT OF REJECTION IN EACHAPPLI CATION. APPLY FROM BOTTOM OF SECTION TO TOP.
APPLY THREE CYCLES, ALLOWING TREATED SURFACE TO DRY FOR 60 TO90 M INUTES BETWEEN CYCLES.
PROTECT TREATED SURFACES FROM RAIN FOR 48 HOURS AFTER TREATMENT.
REPOINTING
REPLACEMENT OF DETERIORATED MORTAR JOINTS, CRACKED MORTAR JOINTS , MISSING MORTAR JOINTS, AND JOINTS NOT BONDED TO FACE BRICK,ADJ
STONE. (ASSUME 20% RE - POINTING OF MASONRY)
JOINT RAKING: RAKE OUT MORTAR FROM JOINTS TO DEPTHS EQUAL TO 2-1/2 TIMES THEIR WIDTHS BUT NOT LESS THAN 1/2 INCH (12MM) NOR LESS THA
REQUIRED TO EXPOSE SOUND, UN -WEATHERED MORTAR.
1.07
A.
C.
D.
E.
F.
G.
H.
C.
D.
3.05
A.
B.
1. ACID DIGESTION AND GRAVIMETRIC ANALYSIS OF SAMPLE TO DETERMIN E THE CONSTITUENTS AND RATIOS OF SAMPLE.
2. PARTICLE SIZE ANALYSIS OF AGGREGATE AND RECOMMENDATION OF CO MPATIBLE AGGREGATE FOR NEW MORTAR.
3. RECOMMENDATION FOR NEW BEDDING AND POINTING MIXES COMPATIBL E WITH EXISTING MASONRY AND MORTAR.
4. SAMPLES OF EACH RECOMMENDED MORTAR IN 1/2 -INCH BY 6 - INCH (13M M BY 150 MM) CHANNELS.
5. DELIVER TO THE TESTING LABORATORY SAMPLES OF THE EXISTING POINT ING MORTAR FOR ANALYSIS AND VERIFICATION OF EXISTING POINTI NG MORT
6. SUBMIT TO THE PROFESSIONAL COPIES OF ALL TEST PROCEDURES, RESU LTS AND REPOINTING MORTAR MIXES FOR REVIEW
FIRMS AND CONSERVATION TESTING LABORATORIES, WHICH POSSESS Q UALIFICATIONS FOR ANALYSIS AND FOR PROVIDING REPLICATION MIXES INC LUDE BUT ARE
NOT LIMITED TO THE FOLLOWING:
1. BUILDING CONSERVATION ASSOCIATES, INC, PHILADELPHIA PA 21 5-923- 2834 (ATTN: DOROTHY KROTZER)
2. MATERIALS CONSERVATION CO, LLC, PHILADELPHIA PA 215 -763-8 090 (AT TN: JOHN CARR)
1.08
A.
SEQUENCING/SCHEDULIN
PERFORM MASONRY AND STONE RESTORATION WORK IN THE FOLLOWING SEQUENCE:
1.
2.
3.
4.
5.
INSPECT FOR OPEN MORTAR JOINTS AND REPAIR BEFORE CLEANING TO P REVENT INTRUSION OF WATER INTO BUILDING.
MASONRY AND STONE REMOVAL AND REBUILDING.
RAKING OUT MORTAR JOINTS
REPOINTING.
3.06
A.
FACADE
IMPROVEMENTS
PART 2 -
2.01
A.
C.
D.
E.
3.07
A.
208 DEKALB STREET
NORRISTOWN, PA 19401
MASONRY MATERIALS
STONE: PROVIDE REPLACEMENT STONE AND ACCESSORIES, INCLUDING UNITS FOR WATER TABLES, LINTELS, ARCHES, CORNERS, AND OTHER SPECIA L GROUND, CUT
OR SAWED SHAPES WHERE REQUIRED TO COMPLETE RESTORATION WORK
1. PROVIDE MATERIAL WITH COLOR, SURFACE TEXTURE, AND PHYSICAL PRO PERTIES TO MATCH EXISTING.
2.02
A.
MORTAR MATERIALS; PORTLAND CEMENT LIME MORTAR
PORTLAND CEMENT: ASTM C 150, TYPE I. LOW - ALKALI, NON -STAINI NG CEMENT
FOR STONEWORK PROVIDE NON -STAINING WHITE CEMENT COMPLYING W ITH STAINING REQUIREMENT OF ASTM C 91 FOR NOT MORE THAN 0.03% WATE
SOLUBLE ALKALI.
REMOVE MORTAR FROM MASONRY SURFACES WITHIN RAKED- OUT JOI NTS TO PROVIDE REVEALS WITH SQUARE BACKS AND EDGES AND TO EXPOS E MASONRY
FOR CONTACT WITH POINTING MORTAR. BRUSH, VACUUM, OR FINISH JOINTS TO REMOVE DIRT AND LOOSE DEBRIS.
DO NOT SPALL EDGES OF MASONRY UNITS OR WIDEN JOINTS. REPLA
CUT OUT OLD MORTAR BY HAND WITH CHISEL AND MALLET, UNLESS O THERWISE INDICATED.
POWER- OPERATED ROTARY HAND SAWS AND GRINDERS WILL NOT BE PERMITTED UNLESS IT CAN BE DEMONSTRATED TO ARCHITECT TO WORK SU CCESSFULLY
WITHOUT DAMAGING CLAY MASONRY ON HORIZONTAL JOINTS ONLY. POWER-OPERATED GRINDERS ON VERTICAL JOINTS ARE PROHIBITED.
JOINT POINTING: RINSE MASONRY JOINT SURFACES WITH WATER TO REMOV E ANY DUST AND MORTAR PARTICLES. TIME APPLICATION OF RINSING SO T HAT, AT TIME
OF POINTING, EXCESS WATER HAS EVAPORATED OR RUN OFF AND JOINT SUR FACES ARE DAMP BUT FREE OF STANDING WATER.
1. APPLY FIRST LAYER OF POINTING MORTAR TO AREAS WHERE EXISTING MORTAR WAS REMOVED TO DEPTHS GREATER THAN SURROUNDING AREAS . APPLY IN
LAYERS NOT GREATER THAN 3/8 INCH (9.5MM) UNTIL A UNIFORM DEP TH IS FORMED. COMPACT EACH LAYER THOROUGHLY AND ALLOW TO BECOM
THUMBPRINT -HARD BEFORE APPLYING NEXT LAYER.
TAKE CARE NOT TO SPREAD MORTAR OVER EDGES ONTO EXPOSED MA SONRY SURFACES, OR TO FEATHEREDGE MORTAR.
WHEN MORTAR IS THUMBPRINT -H ARD, TOOL JOINTS TO MATCH APPRO VEDSAMPLE. REMOVE EXCESS MORTAR FROM EDGE OF JOINT BY BRUSHIN
CURE MORTAR BY MAINTAINING IN A DAMP CONDITION FOR NOT LESS THAN 72 HOURS.
WHERE REPOINTING WORK PRECEDES CLEANING OF EXISTING MASON RY, ALLOW MORTAR TO HARDEN NOT LESS THAN 30 DAYS BEFORE BEGINNI NG CLEANING
WORK.
CURE HYDRAULIC LIME MORTAR ACCORDING TO MANUFACTURER'S RE QUIREMENTS. NEW LIME POINTING MORTAR WILL NEED TO BE DAMPENED R
WITH THE FOLLOWING CURING METHOD
B.
C.
HYDRATED LIME: ASTM C 207, TYPE S.
FACTORY PREPARED LIME PUTTY: ASTM C 1489.
QUICKLIME: ASTM C5, PULVERIZED LIME.
AGGREGATE FOR MORTAR: ASTM C 144, UNLESS OTHERWISE INDICATED.
1. FOR POINTING MORTAR, PROVIDE SAND WITH ROUNDED EDGES.
2. MATCH SIZE, TEXTURE AND GRADATION OF EXISTING MORTAR AGGREGA TE AS CLOSELY AS POSSIBLE
2.
3.
4.
E.
F.
WATER: CLEAN, FREE OF OILS, ACIDS, ALKALINE AND ORGANIC MATT ER.
COLORED MORTAR: AS FOLLOWS:
WHEN ATTEMPTING TO MATCH EXISTING MORTAR, THE CONTRACTOR SHALL SUBMIT TO A TESTING LABORATORY, A SAMPLE OF THE EXISTING MORTAR
TO DETERMINE ITS CONTENTS.
UPON DETERMINATION OF THE CONTENTS OF THE EXISTING MORTAR, THE CONTRACTOR WILL PRODUCE A WALL MOCK -
THE EXISTING MORTAR TO CREATE NEW MORTAR. THE ARCHITECT WILL TH EN REVIEW THE MOCK - UP FOR APPROVAL.
2.
3.
4.
5.
STONE REPAIR
SPECIFICATIONS
G - 001
COLORED PORTLAND CEMENT -LIME MIX.
THE RIVERTON CORPORATION "RIVERTON PORTLAND CEMENT LIME CUSTOM COLOR", FRONT ROYAL, VA (540) - 635 - 4131.
GLEN -GERY/OLDCASTLE CORPORATION "COLOR MORTAR BLEND", WYOMISSI NG, PA, WWW.GLENGERYBRICK.COM (610) - 374 - 4011
LEHIGH PORTLAND CEMENT CO. "LEHIGH CUSTOM COLOR PORTLAND/LIME" , ALLENTOWN, PA, WWW.LEHIGHCEMENT.COM (800) - 523-54

ISSUE DATE:
LANDMARKS PROJECT NO.
N ARCHITECT OF RECORD: LGA PARTNERS
O
I
T
C
U
R
T
S
N
O
C
R
O
F
T
O
N
REVISIONS
NOTE: DO NOT SCALE FROM DRAWINGS.
VERIFY ALL DIMENSIONS ON SITE.
tvr.7KUCKedaaba_lartneC_52R_blaKeD
802_NWOTSIRRON\stcejorP
tiveR\stnemucoD\edaaba\sresU\:C
MA
24:71:01
6202/42/6
SECTION 040122
STONE RESTORATION
PART 1 - GENERAL
1.01 RELATED DOCUMENTS
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND DIVISION 1 SPECIFICATION SECTIONS, 3. MORTAR PIGMENTS a. ACCEPTABLE CURING METHODS INCLUDE COVERING WITH WET BURLAP ANDPOLYETHYLENE SHEETED PANELS, PERIODIC HAND MISTING, AND
APPLY TO THIS SECTION. a. DAVIS COLORS "TRUE TONE MORTAR COLORS", LOS ANGELES, CA, WWW.DAVISCOLORS.COM (800)-356-4848. PERIODIC MIST SPRAYING USING SYSTEM OF PIPES, MIST HEADS, AND TIMERS.
1.02 SECTION SUMMARY b. SOLOMON GRIND-CHEM SERVICES, INC. "SGS MORTAR COLORS", SPRINGFIELD, IL, WWW.SOLOMONCOLORS.COM (800)-624-0261. b. ADJUST CURING METHODS TO ENSURE THAT POINTING MORTAR IS DAMP THROUGHOUT ITS DEPTH WITHOUT ERODING SURFACE MORTAR.
A. EXTERIOR APPLICATIONS: 2.03 MORTAR MIXES 7. FOR HYDRAULIC LIMES, RETENTION OF MOISTURE WITHIN THE MORTAR FOR THE FIRST SEVERAL DAYS [MINIMUM OF 96 HOURS] IS CRITICAL TO ENSURE THAT
1. REPLACE OR REPAIR STONEWORK IN DESIGNATED AREAS A. MEASUREMENT AND MIXING: MEASURE CEMENTITIOUS AND AGGREGATE MATERIAL IN A DRY CONDITION BY VOLUME OR EQUIVALENT WEIGHT. DO NOT MEASURE BY THE HYDRAULIC SET TAKES PLACE BECAUSE ITS HYDRAULIC CONSTITUENTS REACT WITH WATER ITSELF. THEREAFTER, THE REMAINING CARBONATIONSET
2. REPOINTING OF DESIGNATED AREAS OF STONEWORK SHOVEL; USE KNOWN MEASURE. MIX MATERIALS IN A CLEAN MECHANICALBATCH MIXER. REQUIRES CYCLICAL LIGHT DAMPING AND SLOW DRYING. FOLLOW MANUFACTURER'S INSTRUCTIONS REGARDING THE TREATMENT OF THE MORTAR JOINTS
3. DISMANTLE AND REBUILD AREAS SHOWN; NEW STONE TO MATCH EXISTING ON EXTERIOR AND INTERIOR B. MIXING POINTING MORTAR: THOROUGHLY MIX CEMENTITIOUS AND AGGREGATE MATERIALS TOGETHER BEFORE ADDING ANY WATER. THEN MIX AGAIN,ADDING ONLY THROUGHOUT THE DURATION OF THE CURING PROCESS.
1.03 DEFINITIONS ENOUGH WATER TO PRODUCE A DAMP, UNWORKABLE MIX WHICH WILL RETAIN ITS FORM WHEN PRESSED INTO A BALL. MAINTAIN MORTAR IN THIS DAMPENED 8. HAIRLINE CRACKING WITHIN MORTAR OR MORTAR SEPARATION AT EDGE OF A JOINT IS UNACCEPTABLE. COMPLETELY REMOVE SUCH MORTAR AND REPOINT.
A. REPOINTING: THE PROCESS OF RAKING OUT (REMOVING) MORTAR AND REPLACING IT WITH NEW MORTAR. CONDITION FOR 1 TO 2 HOURS. ADD REMAINING WATER IN SMALL PORTIONS UNTIL MORTAR OF DESIRED CONSISTENCY IS REACHED. USE MORTAR WITHIN 30 3.08 PATCHING
B. PATCH POINTING: THE PROCESS OF PLACING NEW MORTAR IN EXISTING JOINT SPACES, WHICH HAVE PREVIOUSLY BEEN RAKED OUT. THIS TERMDOES NOT INCLUDE MINUTES OF FINAL MIXING; DO NOT RE-TEMPER OR USE PARTIALLY HARDENED MATERIAL. A. PATCHING AND REPAIR OF MISCELLANEOUS CRACKS IN EXISTING FACADE.
THE RAKING OUT PROCESS. 1. POINTING MORTAR: ONE PART PORTLAND CEMENT, ONE PART LIME ANDSIX PARTS MORTAR AGGREGATE. COMPLY WITH ASTM C 270, PROPORTION 1. REPAIR FACADE CRACKS IN STONE UNLESS DIRECTED ON DRAWINGS TO "REBUILD" CRACKED AREAS OR "SAW CUT" CRACKED AREAS. (ASSUME 100LINEAR
C. GROUT [TUCK] POINTING: THE PROCESS OF TOUCHING UP EXISTING MORTAR JOINT BY FILLING IN RECESSES WITH NEW MORTAR, WITHOUT FIRST RAKING OUT THE SPECIFICATION, TYPE N, 750 P.S.I. FEET OF REPAIR)
JOINTS. 2. REBUILDING MORTAR: COMPLY WITH ASTM C 270, PROPORTION SPECIFICATION. B. FACADE CRACKS: AS FOLLOWS, UNLESS OTHERWISE INDICATED.
1. MATCH EXISTING: NEW MATERIALS AND PRODUCTS SHALL MATCH EXISTING IN MATERIAL, SIZE, SHAPE, PROFILE, CONFIGURATION, COLOR, TEXTURE. a. ABOVE GRADE MORTAR: TYPE "N" CRACK SIZE (WIDTH) PROCEDURE
TOOLING, QUALITY OF WORKMANSHIP AND VISUAL APPEARANCE. REPLACEMENT MATERIALS SHALL NOT BE VISUALLY DISCERNABLE FROM ADJACENT EXISTING 3. SETTING BUTTONS: LEAD OR PLASTIC BUTTONS OF THE THICKNESS REQUIRED FOR THE JOINT SIZE INDICATED, AND OF THE SIZE REQUIRED TO MAINTAIN 1/64" (.39MM) OR LESS REPOINT CRACKED MORTAR JOINTS.
MATERIALS, EXCEPT FOR MINOR DIFFERENCE RELATING TO WEATHERING OR AGING. UNIFORM JOINT WIDTH NO REPAIR OR REPLACEMENT REQUIRED.
D. SALVAGE/RETAIN: CAREFULLY REMOVE MATERIALS OF COMPONENTS IN AMANNER THAT WILL PERMIT REUSE OR REINSTALLATION IN THIS PROJECT. 4. SEALANT: REFER TO SECTION 079200 -JOINT SEALANTS. 1/64" (.39MM) TO 1/16"(1.5MM) REPOINT CRACKED MORTAR JOINTS.
E. REMOVE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLY DISPOSE OF THEM OFF-SITE UNLESS INDICATED TO BE REMOVED AND SALVAGED OR 2.04 MISCELLANEOUS MATERIALS PRESSURE INJECT GROUT INTO STONE CRACKS OR REPLACE MATERIAL.
REMOVED AND REINSTALLED. A. STONE-TO-STONE ADHESIVE: TWO-PART POLYESTER RESIN STONE ADHESIVE WITH A 15-TO 30-MINUTE CURE AT 70 DEGREES F (21 DEGREES C), IN FORMULATION 3.09 APPLICATION OF JOINT SEALANT
F. DISASSEMBLE AND SALVAGE: CAREFULLY DETACH FROM EXISTING CONSTRUCTION, IN A MANNER TO PREVENT DAMAGE, AND DELIVER TO OWNER. (KNIFE OR FLOWING GRADE) RECOMMENDED BY ADHESIVE MANUFACTURER FOR TYPE OF STONE REPAIR INDICATED, AND IN COLOR INDICATED OR, IFNOT A. REFER TO SECTION 079200 -JOINT SEALANTS.
G. DISASSEMBLE AND REINSTALL: CAREFULLY DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE FOR REUSE, AND REINSTALL WHERE INDICATED. OTHERWISE INDICATED, AS SELECTED BY ARCHITECT FROM TINTED OR STANDARD COLORS AVAILABLE FROM ADHESIVE MANUFACTURER. B. REPLACE DETERIORATED SEALANT CRACKED SEALANT, MISSING SEALANT, AND SEALANT NOT BONDED TO ADJACENT SURFACES.
H. EXISTING TO REMAIN: EXISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO BE PERMANENTLY REMOVED AND THAT ARE NOT OTHERWISE INDICATED TO BE 1. AKEMI NORTH AMERICA; "AKEPOX"HOLBROOK, NY, WWW.AKEMI.COM (877)-GO-AKEMI. C. REPLACE ENTIRE AREAS OF SEALANT WHERE INDICATED ON DRAWINGS.
REMOVED, REMOVED AND SALVAGED, OR REMOVED AND REINSTALLED. 2. BONSTONE MATERIALS CORPORATION; "FAST SET41"MUKWONAGO, WI WWW.BONSTONE.COM (800)-425-2214. 3.10 MISCELLANEOUS WORK
I. DISMANTLE: TO REMOVE BY DISASSEMBLING OR DETACHING AN ITEM FROM A SURFACE, USING GENTLE METHODS AND EQUIPMENT TO PREVENT DAMAGE TO THE ITEM 3. EDISON COATINGS, INC.; "FLEXI-WELD520T", PLAINVILLE, CT, WWW.EDISONCOATINGS.COM (800)-697-8055. A. PAINTING STEEL UNCOVERED DURING THE WORK, INSPECT STEEL EXPOSED DURING MASONRY REMOVAL. WHERE ARCHITECT DETERMINES THAT IT ISSTRUCTURAL,
AND SURFACES; DISPOSING OF ITEMS UNLESS INDICATED TO BE SALVAGED B. MORTAR-TO-STONE ADHESIVE: HIGH-MODULUS, HIGH-STRENGTH, MOISTURE-INSENSITIVE EPOXY ADHESIVE WITH A POT LIFE OF 30 MINUTES AT OR FOR OTHER REASONS CANNOT BE TOTALLY REMOVED, PREPARE AND PAINT IT AS FOLLOWS:
1.04 SUBMITTALS 40 DEGREE F (4 DEGREES C). 1. REMOVE PAINT, RUST, AND OTHER CONTAMINANTS ACCORDING TO SSPC-SP2, "HAND TOOL CLEANING" AS APPLICABLE TO MEET PAINT MANUFACTURER'S
A. PRODUCT DATA FOR EACH PRODUCT INDICATED INCLUDING RECOMMENDATIONS FOR THEIR APPLICATION AND USE. INCLUDE TEST REPORTS AND CERTIFICATIONS 1. PRODUCT: SUBJECT TO COMPLIANCE WITH REQUIREMENTS, PROVIDE SIKADUR HI-MOD EPOXY, SIKASTIX 370, SIKA CORPORATION, LYNHURST NJ, RECOMMENDED PREPARATION.
SUBSTANTIATING THAT PRODUCTS COMPLY WITH REQUIREMENTS. WWW.SIKACORP.COM (800)-933-SIKA. 2. IMMEDIATELY PAINT EXPOSED STEEL WITH TWO COATS OF ANTIRUST COATING, FOLLOWING COATING MANUFACTURER'S WRITTEN INSTRUCTIONS AND
B. SAMPLES FOR VERIFICATION PURPOSES, PRIOR TO ERECTING THE MOCKUP, OF THE FOLLOWING: C. STONE CONSOLIDATION TREATMENT: READY-TO-USE PRODUCT DESIGNEDFOR THE CONSOLIDATION OF MASONRY MATERIALS THAT HAVE DETERIORATED DUE TO WITHOUT EXCEEDING MANUFACTURER'S RECOMMENDED RATE OF APPLICATION (DRY FILM THICKNESS PER COAT).
1. EACH NEW EXPOSED MASONRY MATERIAL TO BE USED FOR REPLACING EXISTING MATERIALS. INCLUDE IN EACH SET OF SAMPLES THE FULL RANGEOF COLORS WEATHERING AND POLLUTANT EXPOSURE. TREATMENT SHALL BE COMPOSED OF SILICIC ETHYL ESTERS, A NEUTRAL CATALYST, AND SOLVENTS. 3. IF ON INSPECTION AND RUST REMOVAL, THE CROSS SECTION OF A STEEL MEMBER IS FOUND TO BE REDUCED FROM RUST BY MORE THAN 1/8 INCH (3 MM)
AND TEXTURES TO BE EXPECTED IN THE COMPLETED WORK. 1. AKEMI NORTH AMERICA; "AKEPOX" HOLBROOK, NY, WWW.AKEMI.COM (877)-GO-AKEMI. NOTIFY ARCHITECT BEFORE PROCEEDING.
2. EACH TYPE OF MORTAR FOR POINTING AND MASONRY REBUILDING AND REPAIR IN THE FORM OF SAMPLE MORTAR STRIPS 6 INCHES (152MM) LONG BY 1/2 2. BONSTONE MATERIALS CORPORATION; "FAST SET41"MUKWONAGO, WI WWW.BONSTONE.COM (800)-425-2214. 3.11 TOOLING STONE
INCH (12MM) WIDE SET IN ALUMINUM OR PLASTIC CHANNELS. 3. DIEDRICH TECHNOLOGIES, INC. "303H40 STONE CONSOLIDANT", OAK CREEK, WI, WWW.DIEDRICHINDUSTRIES.COM (800)-323-3565. A. AT LOCATIONS INDICATED, REMOVE FLAKING OR FRAGMENTED STONE DOWN TO SOUND STONE. NOTIFY PROFESSIONAL IF DEPTH OF REMOVED STONE EXCEEDS 3/4-
3. EACH TYPE OF REPAIR ANCHOR. 4. EDISON COATINGS, INC.; "FLEXI-WELD520T"PLAINVILLE, CT, WWW.EDISONCOATINGS.COM (800)-697-8055. INCH (19 MM).
C. QUALIFICATION DATA FOR FIRMS AND PERSONS SPECIFIED IN THE "QUALITY ASSURANCE" ARTICLE TO DEMONSTRATE THEIR CAPABILITIES AND EXPERIENCE. 5. PRO SO CO, INC. "CONSERVARE OH STONE STRENGTHENER", KANSAS CITY, KS, WWW.PROSOCO.COM (913)-281-2700. B. TOOL THE STONE SURFACE TO MATCH THE ORIGINAL STONE FINISH. USE HAND OR PNEUMATIC CHISELS AND DIAMOND POLISHING/GRINDING PADS.
INCLUDE A LIST OF COMPLETED PROJECTS WITH PROJECT NAMES, ADDRESSES, NAMES OF ARCHITECTS AND OWNERS, AND OTHER INFORMATION SPECIFIED. D. STONE PATCHING MATERIALS: CEMENT BASED MORTAR THAT IS USED TO PATCH AND RESTORE DAMAGED DETERIORATED NATURAL STONE; PIGMENTED TO MATCH 1. BEVEL EDGES OF TOOLED AREAS APPROXIMATELY 45 DEGREES.
1. RESTORATION PROGRAM FOR EACH PHASE OF THE RESTORATION PROCESS, INCLUDING PROTECTION OF SURROUNDING MATERIALS ON BUILDING AND SITE STONE COLOR. USE FORMULATION THAT IS VAPOR AND WATER PERMEABLE (EQUAL TO OR USE FORMULATION HAVING WORKING QUALITIES AND RETARDATION 2. WHERE THE RE-TOOLED AREA IS ABOVE A MORTAR JOINT, TOOL AND BEVEL THE STONE BELOW TO SHED WATER.
DURING OPERATIONS. DESCRIBED IN DETAIL THE MATERIALS, METHODS,AND EQUIPMENT TO BE USED FOR EACH PHASE OF THE RESTORATION WORK. CONTROL TO PERMIT FORMING AND SCULPTURING WHERE NECESSARY. FORMULATE PATCHING COMPOUND IN COLORS, TEXTURES, AND GRAIN TO MATCH STONE 3.12 FINAL CLEANING
2. IF ALTERNATIVE METHODS AND MATERIALS TO THOSE INDICATED ARE PROPOSED FOR ANY PHASE OF RESTORATION WORK, PROVIDE A WRITTEN DESCRIPTION, BEING PATCHED. A. AFTER MORTAR HAS FULLY HARDENED, THOROUGHLY CLEAN EXPOSED MASONRY SURFACES OF EXCESS MORTAR AND FOREIGN MATTER; USE WOOD SCRAPERS, STIFF
INCLUDING EVIDENCE OF SUCCESSFUL USE ON OTHER COMPARABLE PROJECTS, AND A TESTING PROGRAM TO DEMONSTRATE THEIR EFFECTIVENESS FORTHIS 1. CATHEDRAL STONE COMPANY, INC.; "JAHN RESTORATION MORTAR M70 AND M70 SPECIAL"; INCLUDING TOTAL RECONSTRUCTION, HANOVER, MD, NYLON OR FIBER BRUSHES, AND CLEAN WATER, APPLIED BY LOW PRESSURE SPRAY.
PROJECT. WWW.CATHEDRALSTONE.COM (800)-684-0901. 1. DO NOT USE METAL SCRAPERS OR BRUSHES.
1.05 QUALITY ASSURANCE 2. CONPROCO CORP.; "MIMIC",DOVER, NH, WWW.COMPROCO.COM (800)-258-3500. 2. DO NOT USE ACIDIC OR ALKALINE CLEANERS.
A. RESTORATION SPECIALIST: ENGAGE AN EXPERIENCED MASONRY RESTORATION AND CLEANING FIRM THAT HAS SPECIALIZED IN THE TYPES OF WORK REQUIRED FOR 3. EDISON COATINGS, INC. "CUSTOM SYSTEM 45", PLAINVILLE, CT WWW.EDISONCOATINGS.COM (800)-697-8055. B. CLEAN ADJACENT NON-MASONRY SURFACES. USE DETERGENT AND SOFT BRUSHES OR CLOTHS.
THIS PROJECT. AT CONTRACTOR'S OPTION, THE WORK MAY BE DIVIDED BETWEEN TWO SEPARATE FIRMS; ONE FOR CLEANING AND ONE FOR REPAIR WORK. 4. PRIMERS AS RECOMMENDED BY PATCHING MATERIAL MANUFACTURER. C. CLEAN MORTAR AND DEBRIS FROM ROOF; REMOVE DEBRIS FROM GUTTERSAND DOWNSPOUTS. RINSE OFF ROOF AND FLUSH GUTTERS AND DOWNSPOUTS.
1. WORK MUST BE PERFORMED BY A FIRM HAVING NOT LESS THAN 5 YEARSSUCCESSFUL EXPERIENCE IN COMPARABLE MASONRY RESTORATION PROJECTS AND 2.05 STONEWORK ACCESSORIES D. REMOVE MASKING MATERIALS, LEAVING NO RESIDUES THAT COULD TRAPDIRT.
EMPLOYING PERSONNEL SKILLED IN THE RESTORATION PROCESSES AND OPERATIONS INDICATED. A. ANCHORS, DOWELS AND FASTENING: THE SETTING CONTRACTOR SHALL FURNISH AND SET ALL ANCHORS, DOWELS, ANGLES, BOLTS, AND RODS REQUIRED TO
2. FIELD SUPERVISION: REQUIRE RESTORATION SPECIALIST FIRM TO MAINTAIN AN EXPERIENCED FULL-TIME SUPERVISOR ON THE JOB SITE DURING TIMES THAT INSTALL STONE UNLESS OTHERWISE SPECIFIED. SHOW ANCHORS, DOWELS, BOLTS, RODS AND OTHER DEVICES ON SHOP DRAWINGS. END OF SECTION
CLAY MASONRY RESTORATION AND CLEANING ARE IN PROGRESS. 1. ANCHOR BOLTS, NUTS AND WASHERS: THREADED FASTENERS TYPE 304/316 STAINLESS STEEL.
B. FIELD-CONSTRUCTION MOCKUPS: PRIOR TO STARTING STONE RESTORATION, PREPARE THE FOLLOWING SAMPLE TEST AREAS ON THE BUILDING WHERE DIRECTED BY 2. STONE ANCHORS: TYPE AND SIZE INDICATED OR, IF NOT INDICATED,AS REQUIRED TO SECURELY ANCHOR AND FASTEN STONEWORK IN PLACE BOTH
ARCHITECT. PREPARE SAMPLE TEST AREAS USING SAME MATERIALS AND METHODS PROPOSED FOR THE WORK, AND UNDER SAME WEATHER CONDITIONS TO BE HORIZONTALLY AND VERTICALLY. FABRICATE ANCHORS AND DOWELS FROM AISI TYPE 302/304 STAINLESS STEEL ; ASTM A 240/A 240M. MINIMUM TWO (2)
EXPECTED DURING THE RESTORATION. OBTAIN ARCHITECT'S ACCEPTANCE OF VISUAL QUALITIES BEFORE PROCEEDING WITH MASONRY RESTORATION. RETAIN DOWELS FOR EACHSTONE COPING PIECE. PROVIDE STRAP ANCHORS AT HEAD OF STONE LINTELS, 2 MINIMUM PER EACH 4 FOOT LENGTH OF LINTEL.
ACCEPTABLE TEST AREAS IN AN UNDISTURBED CONDITION, SUITABLY MARKED, DURING CONSTRUCTION AS A STANDARD FOR JUDGING THE COMPLETED WORK. 3. SETTING BUTTONS: LEAD OR PLASTIC BUTTONS OF THE THICKNESS REQUIRED FOR THE JOINT SIZE INDICATED, AND OF THE SIZE REQUIRED TOMAINTAIN
1. NOTIFY OWNER ONE WEEK IN ADVANCE OF DATES AND TIMES WHEN SAMPLE TEST AREAS WILL BE PREPARED. PREPARE A MINIMUM OF THREE TEST AREAS UNIFORM JOINT WIDTH.
SHOWING VARIOUS RESTORATION METHODS.
2. REPOINTING: PREPARE 2 SEPARATE SAMPLE AREAS OF APPROXIMATELY 3 FT. (900MM) HIGH BY 3 FT. (900MM) WIDE FOR EACH TYPE OF REPOINTING PART 3 - EXECUTION
REQUIRED; ONE FOR DEMONSTRATING METHODS AND QUALITY OF WORKMANSHIP EXPECTED IN REMOVAL OF MORTAR FROM JOINTS AND THE OTHER FOR 3.01 GENERAL
DEMONSTRATING QUALITY OF MATERIALS AND WORKMANSHIP EXPECTED IN POINTING MORTAR JOINTS. SEPARATE SAMPLES OF EACH TYPE ARE REQUIRED FOR A. RESTORATION MATERIALS SHALL BE INSTALLED IN STRICT ACCORDANCEWITH THE MANUFACTURER'S CURRENT, PRINTED INSTRUCTIONS.
STONEWORK AND FOR BRICKWORK. 3.02 BUILDING SURVEY
3. MASONRY REPAIR: PREPARE SAMPLE PANELS OF SIZE INDICATED FOR EACH TYPE OF MASONRY MATERIAL INDICATED TO BE PATCHED, REBUILT OR REPLACED. A. CONTRACTOR SHALL SURVEY MASONRY AND STONE JOINTS IN DETAIL TODETERMINE REPAIR AND REPLACEMENT WORK NECESSARY FOR RESTORATION.
ERECT MOCK- UP PANELS INTO AN EXISTING WALL, UNLESS OTHERWISE INDICATED, TO DEMONSTRATE QUALITY OF MATERIALS AND WORKMANSHIP. B. BEFORE PROCEEDING WITH REPAIR FOR REPOINTING WORK THE CONTRACTOR SHALL CAREFULLY EXAMINE ALL MASONRY AND STONE MORTAR JOINTS FOR
SEPARATE SAMPLES OF EACH TYPE ARE REQUIRED FOR STONEWORK AND FOR BRICKWORK. SOUNDNESS AND EXTENT OF DETERIORATION.
C. REFERENCES: U.S. DEPARTMENT OF THE INTERIOR, HERITAGE CONSERVATION AND RECREATION SERVICE PRESERVATION BRIEFS 3.03 PREPARATION
1.06 PROJECT/SITE CONDITIONS A. PROTECT PERSONS, MOTOR VEHICLES, SURROUNDING SURFACES OF BUILDING WHOSE MASONRY AND STONE SURFACES ARE RESTORED, BUILDING SITE, AND
A. PROTECT PERSONS, MOTOR VEHICLES, SURROUNDING SURFACES OF BUILDING WHOSE MASONRY SURFACES ARE BEING RESTORED, BUILDING SITE, AND SURROUNDING BUILDINGS FROM INJURY RESULTING FROM MASONRY RESTORATION WORK.
SURROUNDING BUILDINGS FROM INJURY RESULTING FROM MASONRY RESTORATION WORK. ERECT TEMPORARY PROTECTION COVERS AS REQUIRES. B. UNUSED ANCHOR REMOVAL
B. DO NOT REPOINT MORTAR JOINTS OR REPAIR MASONRY UNLESS AIR TEMPERATURES ARE BETWEEN 40 DEGREES F (4 DEGREES C) AND 80 DEGREES F (27 DEGREES C) 1. REMOVE MASONRY ANCHORS, BRACKETS, WOOD NAILERS, AND OTHER EXTRANEOUS ITEMS NO LONGER IN USE UNLESS IDENTIFIED AS HISTORICALLY
AND WILL REMAIN SO FOR AS LEAST 48 HOURS AFTER COMPLETION OF WORK. WHEN TEMPERATURE FALLS BELOW 32 DEGREES F (0 DEGREES C), PROVIDE A SIGNIFICANT OR INDICATED TO REMAIN.
TEMPORARY ENCLOSURE WORK AREA, DAY AND NIGHT; PROVIDE TEMPORARYHEAT. 2. REMOVE ITEMS CAREFULLY TO AVOID SPALLING OR CRACKING MASONRYOR STONE. WHERE DIRECTED, IF AN ITEM CANNOT BE REMOVED WITHOUT DAMAGING
C. HOT WEATHER REQUIREMENTS: PROTECT RESTORATION WORK WHEN TEMPERATURE AND HUMIDITY CONDITIONS PRODUCE EXCESSIVE EVAPORATION OF WATER FROM SURROUNDING MATERIAL, DO THE FOLLOWING:
MORTAR AND PATCHING MATERIALS. PROVIDE ARTIFICIAL SHADE AND WIND BREAKS AND USE COOLED MATERIALS AS REQUIRED. DO NOT APPLY MORTAR TO a. CUT OR GRIND OFF ITEM APPROXIMATELY 3/4 INCH (20 MM) BENEATH SURFACE AND CORE DRILL A RECESS OF SAME DEPTH IN SURROUNDING
SUBSTRATES WITH TEMPERATURES OF 90 DEG F (32 DEG C) AND ABOVE. MASONRY AS CLOSE AROUND ITEM AS PRACTICAL.
D. PREVENT GROUT OR MORTAR USED IN REPOINTING AND REPAIR WORK FROM STAINING FACE OF SURROUNDING MASONRY AND OTHER SURFACES. REMOVE b. IMMEDIATELY PAINT EXPOSED END OF ITEM WITH TWO COATS OF ANTIRUST COATING, FOLLOWING COATING MANUFACTURER'S WRITTEN
IMMEDIATELY GROUT AND MORTAR IN CONTACT WITH EXPOSED MASONRY AND OTHER SURFACES. INSTRUCTIONS AND WITHOUT EXCEEDING MANUFACTURER'S RECOMMENDEDDRY FILM THICKNESS PER COAT. KEEP PAINT OFF SIDES OF RECESS.
E. PROTECT SILLS, LEDGES AND PROJECTIONS FROM MORTAR DROPPINGS. 3. PATCH THE HOLE WHERE EACH ITEM WAS REMOVED UNLESS DIRECTED TO REMOVE AND REPLACE THE MASONRY UNIT.
F. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING HARDNESS OF EXISTING MORTAR JOINTS PRIOR TO SUBMITTING BID. 3.04 STONE PATCHING INCLUDING CRACK PATCHING
G. TAKE GREAT CARE TO PREVENT DAMAGE TO EXISTING MATERIALS. USE THE GENTLEST MEANS AND METHODS AVAILABLE TO CARRY OUT THE WORK INDICATED AND A. CUT OUT DETERIORATED STONE AND ADJACENT STONE THAT HAS BEGUN TO DETERIORATE WITH DUTCHMAN REPAIRS. REMOVE ADDITIONAL STONE SO THAT PATCH
SPECIFIED. TEST AND PRACTICE MEANS AND METHODS IN INCONSPICUOUS AREAS UNTIL IT IS DETERMINED THAT THEY CAN BE CARRIED OUT WITHOUT DAMAGE TO WILL NOT HAVE FEATHERED EDGES AND WILL BE AT LEAST 1/4 INCH (6MM) THICK.
MATERIALS SCHEDULED TO REMAIN. B. REMOVE LOOSE PARTICLES, SOIL DEBRIS, OIL AND OTHER CONTAMINATES FROM EXISTING STONE UNITS AS LOCATIONS INDICATED BY CLEANING WITH A STIFF-
1.07 PRECONSTRUCTION TESTING BRISTLE BRUSH.
A. PRECONSTRUCTION MORTAR TESTING: ANALYSIS OF EXISTING BEDDING AND POINTING MORTAR; CAREFULLY REMOVE EXISTING MORTAR FROM WITHIN JOINTS AT C. BRUSH-COAT STONE SURFACES WITH MORTAR-TO-STONE ADHESIVE COMPLYING WITH MANUFACTURER'S DIRECTIONS. BID SET
FIVE [5] LOCATIONS DESIGNATED BY PROFESSIONAL OR TESTING SERVICE. D. BRUSH-COAT STONE SURFACES WITH A SLURRY COAT OF PATCHING MORTAR COMPLYING WITH MANUFACTURER'S DIRECTIONS.
B. TEMPORARY PATCH: AS DIRECTED BY PROFESSIONAL, PROVIDE TEMPORARY MATERIALS FOLLOWED BY PERMANENT REPAIRS AT LOCATIONS FROM WHICH EXISTING E. PLACE PATCHING MORTAR IN LAYERS NO THICKER THAN 2 INCHES (50MM). ROUGHEN SURFACE OF EACH LAYER TO PROVIDE A KEY FOR THE NEXT. 06/24/2026
SAMPLES WERE TAKEN. F. BUILD PATCH UP 1/4 INCH (6MM) ABOVE SURROUNDING STONE AND CARVE SURFACE TO MATCH ADJOINING STONE AFTER MORTAR HAS HARDENED.
224020
C. PROVIDE RECOMMENDED REPLICATION MIX TO MATCH COLOR AND TEXTURE OF ORIGINAL MORTAR FOR EACH TYPE OF REPOINTING MORTAR. G. KEEP EACH LAYER DAMP FOR 72 HOURS OR UNTIL MORTAR HAS SET.
D. TEST ACCORDING TO ASTM 295, MODIFIED AS AGREED BY TESTING SERVICE AND PROFESSIONAL FOR PROJECT REQUIREMENTS, TO DETERMINE PROPORTIONAL H. UNACCEPTABLE PATCHES ARE DEFINED AS THOSE WITH HAIRLINE CRACKS OR THAT SHOW SEPARATION FROM STONE AT EDGES, AND THOSE THAT DONOT MATCH
COMPOSITION OFORIGINAL INGREDIENTS, SIZES AND COLORS OF AGGREGATES, AND APPROXIMATE STRENGTH. USE X-RAY DIFFRACTION, INFRARED SPECTROSCOPY ADJOINING STONE IN COLOR OR TEXTURE. REMOVE PATCHES AND REFILLTO PROVIDE PATCHES FREE OF THOSE DEFECTS.
AND DIFFERENTIAL THERMAL ANALYSIS TO SUPPLEMENT MICROSCOPICAL METHODS. ANALYSIS TO INCLUDE: 3.05 STONE REPAIR
1. ACID DIGESTION AND GRAVIMETRIC ANALYSIS OF SAMPLE TO DETERMINE THE CONSTITUENTS AND RATIOS OF SAMPLE. A. CAREFULLY REMOVE LOOSE STONE FRAGMENTS IN AREAS TO BE REPAIRED. REUSE ONLY PIECES OF SPALLED STONE THAT ARE IN SOUND CONDITION.
2. PARTICLE SIZE ANALYSIS OF AGGREGATE AND RECOMMENDATION OF COMPATIBLE AGGREGATE FOR NEW MORTAR. B. REMOVE SOIL, LOOSE STONE PARTICLES, MORTAR, AND OTHER DEBRIS OR FOREIGN MATERIAL FROM THE SURFACES TO BE BONDED ON BOTH THE FRAGMENT AND
3. RECOMMENDATION FOR NEW BEDDING AND POINTING MIXES COMPATIBLE WITH EXISTING MASONRY AND MORTAR. THE BUILDING STONE FROM WHICH FRAGMENT WAS REMOVED BY CLEANINGWITH A STIFF BRUSH.
4. SAMPLES OF EACH RECOMMENDED MORTAR IN 1/2-INCH BY 6-INCH (13MM BY 150 MM) CHANNELS. C. APPLY ADHESIVE TO COMPLY WITH ADHESIVE MANUFACTURER'S DIRECTIONS. COAT BONDING SURFACE OF BUILDING STONE WITH STONE-TO-STONEADHESIVE
5. DELIVER TO THE TESTING LABORATORY SAMPLES OF THE EXISTING POINTING MORTAR FOR ANALYSIS AND VERIFICATION OF EXISTING POINTING MORTAR. COMPLETELY FILLING ALL VOIDS AND COVERING ALL SURFACES. FIT STONE FRAGMENT ONTO BUILDING STONE WHILE ADHESIVE IS STILL TACKY AND HOLD
6. SUBMIT TO THE PROFESSIONAL COPIES OF ALL TEST PROCEDURES, RESULTS AND REPOINTING MORTAR MIXES FOR REVIEW. FRAGMENT SECURELY IN PLACE UNTIL ADHESIVE HAS CURED.
E. FIRMS AND CONSERVATION TESTING LABORATORIES, WHICH POSSESS QUALIFICATIONS FOR ANALYSIS AND FOR PROVIDING REPLICATION MIXES INCLUDE BUT ARE D. AFTER ADHESIVE HAS FULLY CURED, ANCHOR STONE FRAGMENTS FURTHER WITH 1/4 INCH (6MM) DIAMETER PLAIN STAINLESS STEEL RODS SET INTO 1/4 INCH (6MM)
NOT LIMITED TO THE FOLLOWING: DIAMETER HOLES DRILLED AT A 45 DEGREE DOWNWARD ANGLE THROUGH THE FACE OF THE STONE. CENTER AND SPACE ANCHOR RODS BETWEEN 3 AND 5 INCHES
1. BUILDING CONSERVATION ASSOCIATES, INC, PHILADELPHIA PA 215-923-2834 (ATTN: DOROTHY KROTZER) (76MM AND 127MM) APART AND NOT LESS THAN 2 INCHES (50MM) FROM ANY EDGE.
2. MATERIALS CONSERVATION CO, LLC, PHILADELPHIA PA 215-763-8090 (ATTN: JOHN CARR) E. INSERT RODS NOT LESS THAN 2 INCHES (50MM) INTO BACKING STONE AND 2 INCHES (50MM) INTO FRAGMENT WITH END COUNTERSUNK AT LEAST 3/4 INCH (19MM)
1.08 SEQUENCING/SCHEDULING FROM THE EXPOSED FACE OF THE STONE.
A. PERFORM MASONRY AND STONE RESTORATION WORK IN THE FOLLOWING SEQUENCE: F. CLEAN RESIDUAL ADHESIVE FROM EDGES. WET STONE AND FILL CHIPPED AREAS AND DRILL HOLES WITH PATCHING MORTAR. AVOID FEATHEREDGING. FINISH
1. INSPECT FOR OPEN MORTAR JOINTS AND REPAIR BEFORE CLEANING TO PREVENT INTRUSION OF WATER INTO BUILDING. PATCHED AREAS TO MATCH TEXTURE OF AND BE LEVEL WITH ADJOINING SURROUNDING STONE SURFACES. KEEP PATCHING MORTAR DAMP FOR 72 HOURS.
2. MASONRY AND STONE REMOVAL AND REBUILDING. 3.06 STONE CONSOLIDATION TREATMENT
3. RAKING OUT MORTAR JOINTS. A. APPLY TREATMENT TO CLEAN, DRY SURFACES ACCORDING TO MANUFACTURER'S INSTRUCTIONS. REMOVE AREAS OF BLIND EXFOLIATION AND DELAMINATION BEFORE FACADE
4. REPOINTING. APPLYING.
5. PATCHING. B. APPLY IN CYCLES (REPEATED APPLICATIONS) TO RELATIVELY SMALL SECTIONS OF MASONRY, NOT MORE THAN 100 SQ. FT. (9.3M2)IN AREA. EACH CYCLE SHALL IMPROVEMENTS
CONSIST OF THREE SUCCESSIVE SATURATING APPLICATIONS, APPLIED AT5-TO 15-MINUTE INTERVALS, DEPENDING ON DRYING CONDITIONS.
PART 2 - PRODUCTS C. APPLY BY LOW-PRESSURE SPRAY TO THE POINT OF REJECTION IN EACHAPPLICATION. APPLY FROM BOTTOM OF SECTION TO TOP.
208 DEKALB STREET
2.01 MASONRY MATERIALS D. APPLY THREE CYCLES, ALLOWING TREATED SURFACE TO DRY FOR 60 TO90 MINUTES BETWEEN CYCLES.
NORRISTOWN, PA 19401
A. STONE: PROVIDE REPLACEMENT STONE AND ACCESSORIES, INCLUDING UNITS FOR WATER TABLES, LINTELS, ARCHES, CORNERS, AND OTHER SPECIAL GROUND, CUT, E. PROTECT TREATED SURFACES FROM RAIN FOR 48 HOURS AFTER TREATMENT.
OR SAWED SHAPES WHERE REQUIRED TO COMPLETE RESTORATION WORK. 3.07 REPOINTING
1. PROVIDE MATERIAL WITH COLOR, SURFACE TEXTURE, AND PHYSICAL PROPERTIES TO MATCH EXISTING. A. REPLACEMENT OF DETERIORATED MORTAR JOINTS, CRACKED MORTAR JOINTS, MISSING MORTAR JOINTS, AND JOINTS NOT BONDED TO FACE BRICK,ADJACENT
MUNICIPALITY OF NORRISTOWN
2.02 MORTAR MATERIALS; PORTLAND CEMENT LIME MORTAR STONE. (ASSUME 20% RE-POINTING OF MASONRY)
A. PORTLAND CEMENT: ASTM C 150, TYPE I. LOW-ALKALI, NON-STAINING CEMENT. B. JOINT RAKING: RAKE OUT MORTAR FROM JOINTS TO DEPTHS EQUAL TO 2-1/2 TIMES THEIR WIDTHS BUT NOT LESS THAN 1/2 INCH (12MM) NOR LESS THAN THAT
1. FOR STONEWORK PROVIDE NON-STAINING WHITE CEMENT COMPLYING WITH STAINING REQUIREMENT OF ASTM C 91 FOR NOT MORE THAN 0.03% WATER REQUIRED TO EXPOSE SOUND, UN-WEATHERED MORTAR.
SOLUBLE ALKALI. 1. REMOVE MORTAR FROM MASONRY SURFACES WITHIN RAKED-OUT JOINTS TO PROVIDE REVEALS WITH SQUARE BACKS AND EDGES AND TO EXPOSE MASONRY
B. HYDRATED LIME: ASTM C 207, TYPE S. FOR CONTACT WITH POINTING MORTAR. BRUSH, VACUUM, OR FINISH JOINTS TO REMOVE DIRT AND LOOSE DEBRIS. NO. DATE DESCRIPTION
C. FACTORY PREPARED LIME PUTTY: ASTM C 1489. 2. DO NOT SPALL EDGES OF MASONRY UNITS OR WIDEN JOINTS. REPLACEANY MASONRY UNITS WHICH BECOME DAMAGED.
QUICKLIME: ASTMC5, PULVERIZED LIME. 3. CUT OUT OLD MORTAR BY HAND WITH CHISEL AND MALLET, UNLESS OTHERWISE INDICATED.
D. AGGREGATE FOR MORTAR: ASTM C 144, UNLESS OTHERWISE INDICATED. 4. POWER-OPERATED ROTARY HAND SAWS AND GRINDERS WILL NOT BE PERMITTED UNLESS IT CAN BE DEMONSTRATED TO ARCHITECT TO WORK SUCCESSFULLY
1. FOR POINTING MORTAR, PROVIDE SAND WITH ROUNDED EDGES. WITHOUT DAMAGING CLAY MASONRY ON HORIZONTAL JOINTS ONLY. POWER-OPERATED GRINDERS ON VERTICAL JOINTS ARE PROHIBITED.
2. MATCH SIZE, TEXTURE AND GRADATION OF EXISTING MORTAR AGGREGATE AS CLOSELY AS POSSIBLE. C. JOINT POINTING: RINSE MASONRY JOINT SURFACES WITH WATER TO REMOVE ANY DUST AND MORTAR PARTICLES. TIME APPLICATION OF RINSING SO THAT, AT TIME
E. WATER: CLEAN, FREE OF OILS, ACIDS, ALKALINE AND ORGANIC MATTER. OF POINTING, EXCESS WATER HAS EVAPORATED OR RUN OFF AND JOINT SURFACES ARE DAMP BUT FREE OF STANDING WATER.
F. COLORED MORTAR: AS FOLLOWS: 1. APPLY FIRST LAYER OF POINTING MORTAR TO AREAS WHERE EXISTING MORTAR WAS REMOVED TO DEPTHS GREATER THAN SURROUNDING AREAS. APPLY IN
1. MATCH EXISTING MORTAR COLOR, AFTER CLEANING. LAYERS NOT GREATER THAN 3/8 INCH (9.5MM) UNTIL A UNIFORM DEPTH IS FORMED. COMPACT EACH LAYER THOROUGHLY AND ALLOW TO BECOME
a. WHEN ATTEMPTING TO MATCH EXISTING MORTAR, THE CONTRACTOR SHALLSUBMIT TO A TESTING LABORATORY, A SAMPLE OF THE EXISTING MORTAR THUMBPRINT-HARD BEFORE APPLYING NEXT LAYER.
TO DETERMINE ITS CONTENTS. 2. TAKE CARE NOT TO SPREAD MORTAR OVER EDGES ONTO EXPOSED MASONRY SURFACES, OR TO FEATHEREDGE MORTAR.
b. UPON DETERMINATION OF THE CONTENTS OF THE EXISTING MORTAR, THECONTRACTOR WILL PRODUCE A WALL MOCK-UP USING THE FORMULA FOR 3. WHEN MORTAR IS THUMBPRINT-HARD, TOOL JOINTS TO MATCH APPROVEDSAMPLE. REMOVE EXCESS MORTAR FROM EDGE OF JOINT BY BRUSHING.
STONE REPAIR
THE EXISTING MORTAR TO CREATE NEW MORTAR. THE ARCHITECT WILL THEN REVIEW THE MOCK-UP FOR APPROVAL. 4. CURE MORTAR BY MAINTAINING IN A DAMP CONDITION FOR NOT LESS THAN 72 HOURS.
2. COLORED PORTLAND CEMENT-LIME MIX. 5. WHERE REPOINTING WORK PRECEDES CLEANING OF EXISTING MASONRY, ALLOW MORTAR TO HARDEN NOT LESS THAN 30 DAYS BEFORE BEGINNING CLEANING SPECIFICATIONS
a. THE RIVERTON CORPORATION "RIVERTON PORTLAND CEMENT LIME CUSTOMCOLOR", FRONT ROYAL, VA (540)-635-4131. WORK.
b. GLEN-GERY/OLDCASTLE CORPORATION "COLOR MORTAR BLEND", WYOMISSING, PA, WWW.GLENGERYBRICK.COM (610)-374-4011 6. CURE HYDRAULIC LIME MORTAR ACCORDING TO MANUFACTURER'S REQUIREMENTS. NEW LIME POINTING MORTAR WILL NEED TO BE DAMPENED REGULARLY G-001
c. LEHIGH PORTLAND CEMENT CO. "LEHIGH CUSTOM COLOR PORTLAND/LIME", ALLENTOWN, PA, WWW.LEHIGHCEMENT.COM (800)-523-5488. WITH THE FOLLOWING CURING METHODS:

This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

General Information Department for this solicitation: Procurement Date Prepared: 07/16/26 Types: IFB Advertisement

State Government of Pennsylvania

Bid Due: 7/30/2026

PW Bid 6716 - PHL 1991.26 Terminal D Holdroom Improvements - Mechanical(Federally Funded)

City of Philadelphia

Bid Due: 7/28/2026

Follow CSS 90331 - Asphalt Repairs - Lock Haven, PA (PA060) Active Contract

DEPT OF DEFENSE

Bid Due: 8/14/2026

Project: 2025 CDBG South Street Improvements Ref. #: Borough of Slatington, Lehigh County

PennBid

Bid Due: 8/07/2026