Debris Boom Supply and Install at Harry S. Truman Lake Project
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Missouri |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | No Set aside used |
| Posted Date: | Sep 28, 2026 |
| Due Date: | Oct 26, 2026 |
| Solicitation No: | W912DQ26QA080 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
- Original Published Date: Sep 28, 2026 02:34 pm CDT
- Original Date Offers Due: Oct 26, 2026 10:00 am CDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Nov 10, 2026
-
Initiative:
- None
- Original Set Aside: No Set aside used
- Product Service Code: 2090 - MISCELLANEOUS SHIP AND MARINE EQUIPMENT
-
NAICS Code:
- 332312 - Fabricated Structural Metal Manufacturing
-
Place of Performance:
Warsaw , MO 65355USA
The purpose of the debris boom is to prevent floating debris from impacting the dam's tainter gates, which is crucial for maintaining the full operational capacity of the spillway. The boom will also serve as a visual barrier to boaters. The Contractor shall provide all labor, materials, equipment, engineering, fabrication, delivery, and optional installation necessary to furnish a complete debris boom system at Harry S. Truman Dam. The approximately 2,000-foot boom shall be designed to intercept floating debris upstream of the spillway and withstand site-specific hydraulic, wind, wave, debris, and impact loading conditions. The debris boom shall be designed for an 800-foot-long by 3-foot-thick debris field, use a minimum safety factor of 2.0 for design loads, withstand a direct head-on impact from an 18-inch-diameter, 100-foot-long log traveling at the maximum design water velocity, and withstand design conditions including 50 mph wind speed and 5-foot wave height.
This acquisition is not set-aside for small business concerns and is competed as full and open competition, Unrestricted.
An organized site visit has been scheduled for: Friday, 9 October 2026 at 11am.
- CONTRACTING DIV CORPS OF ENGINEERS 600 FEDERAL BLDG 635 E 12TH ST
- KANSAS CITY , MO 64106-2896
- USA
- Nathaniel Leyba
- nathaniel.j.leyba@usace.army.mil
- Phone Number 8163892281
- Laura Hedrick
- Laura.L.Hedrick@usace.army.mil
- Phone Number 8163893023
- Sep 28, 2026 02:34 pm CDTCombined Synopsis/Solicitation (Original)
Related Document
| Oct 13, 2026 | [Combined Synopsis/Solicitation (Updated)] Debris Boom Supply and Install at Harry S. Truman Lake Project |
| Oct 19, 2026 | [Combined Synopsis/Solicitation (Updated)] Debris Boom Supply and Install at Harry S. Truman Lake Project |
| Oct 23, 2026 | [Combined Synopsis/Solicitation (Updated)] Debris Boom Supply and Install at Harry S. Truman Lake Project |
| Oct 29, 2026 | [Combined Synopsis/Solicitation (Updated)] Debris Boom Supply and Install at Harry S. Truman Lake Project |