Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Updated)
- Updated Published Date: Apr 07, 2026 10:40 am MDT
- Original Published Date: Feb 02, 2026 01:40 pm MST
- Updated Response Date: Feb 01, 2026 05:00 pm MST
- Original Response Date: Feb 17, 2026 05:00 pm MST
- Inactive Policy: Manual
- Updated Inactive Date: May 01, 2026
- Original Inactive Date: Feb 18, 2026
-
Initiative:
- None
- Original Set Aside: No Set aside used
- Product Service Code: 6110 - ELECTRICAL CONTROL EQUIPMENT
-
NAICS Code:
- 335313 - Switchgear and Switchboard Apparatus Manufacturing
-
Place of Performance:
Arvada , COUSA
Pre-Solicitation Notice
System for Award Management (SAM) Posting
Notification of Intent to Publish a Full and Open Competitive Solicitation for
DC Filter at NLR's Flatiron's Campus
INTRODUCTION
The National Laboratory of the Rockies (NLR) is the U.S. Department of Energy’s primary national laboratory for energy systems research and development. As the energy systems laboratory, NLR’s unique strength lies in developing and integrating a broad array of energy technologies into robust, resilient systems - bridging foundational research with practical applications to lower energy costs, drive economic growth, bolster national security, and deliver abundant and reliable energy.
BACKGROUND
A DC filter is a powerful tool in power electronics and energy systems research. It can smooth out voltage or current ripples in DC systems and is particularly effective when used in conjunction with a Controllable Grid Interface (CGI) which can dynamically adjust system parameters.
Procurement of a DC Filter will open a wide range of research opportunities, especially in the context of modern power systems and renewable energy integration. Key research areas include power quality improvement, grid-forming and grid-following control, advanced control algorithms, DC microgrid research, and hardware-in-the-loop simulations.
DESCRIPTION:
NLR intends to publicly publish for a period of 15 calendar days a competitive solicitation for the following:
DC Filter - This project seeks to add a 4kA DC Filter within the CGI Yard. This filter will integrate with the existing 10MW 5kV DC output available in the CGI E-House.
- Filter Capacity: 4,000A
- Filter Topology: L-cmc-C
-
Filter Passives:
- 6x 2mH inductors
- 2 windings common mode choke (2cmc)
- Mid-Point Grounding
- Includes Common mode choke
-
Ancillary Components should include
- DC Distribution
- DC Protection
- Sensing and Control
- System Layout and Electrical Interfaces
Please note that this solicitation is not ready to be issued as of this date. NLR will publish the solicitation on SAM.gov when it is available.
The anticipated delivery date is: 8/1/2027
NLR expects the resultant purchase order to be a fixed unit price type agreement.
All responsible sources may submit a proposal to the solicitation once posted. Electronic submissions to the public solicitation will be accepted prior to the response date and time, which will be publicized with the solicitation.
Proposals, questions, and submissions in response to this pre-solicitation notice will not be collected.
- PO BOX 4011 MAILSTOP RSF-041
- Golden , CO 80402
- USA
- Jessica Roe
- ASP.Responses@nlr.gov
- Apr 07, 2026 10:40 am MDTPresolicitation (Updated)
- Feb 18, 2026 09:55 pm MST Presolicitation (Original)
Related Document
| Feb 2, 2026 | [Presolicitation (Original)] DC Filter at NLR's Flatiron's Campus |
See Also
Ridges Primary Pump Station Motor Control Center (MCC) Replacement Project IFB-5971-26-DD Responses Due
City of Grand Junction
Due by 9/17/2026
Ridges Primary Pump Station Motor Control Center (MCC) Replacement Project IFB-5971-26-DD Responses Due
City of Grand Junction
Due by 9/17/2026
Ridges Primary Pump Station Motor Control Center (MCC) Replacement Project IFB-5971-26-DD Responses Due
City of Grand Junction
Due by 9/17/2026
Ridges Primary Pump Station Motor Control Center (MCC) Replacement Project IFB-5971-26-DD Responses Due
City of Grand Junction
Due by 9/17/2026