| Agency: | State Government of Georgia |
|---|---|
| State: | Georgia |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | May 21, 2026 |
| Due Date: | Jun 10, 2026 |
| Solicitation No: | PE-50300-RFP-2026-000000312 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-50300-RFP-2026-000000312 | [2038-26] DB-RFQP BOR Project No. J-468 Groseclose Building Deferred Renewal | Georgia Institute Of Technology |
May 21, 2026 @ 02:24 PM
|
Jun 10, 2026 @ 02:00 PM
|
Start Date: May 21, 2026 @ 02:24 PM ET
End Date:
Jun 10, 2026 @ 02:00 PM ET
05/21/2026: GT Planning, Design & Construction (PDC) unit is soliciting Statements of Qualifications (Step 1 RFQ) from Firms interested in providing Design-Build (DB) Services for a project known as ¿BOR Project No. J-468 Groseclose Building Deferred Renewal" located at the Georgia Institute of Technology campus, Atlanta, Georgia. Respondents who are determined qualified may be shortlisted for Interview and offer proposals for these services (Step 2 RFP).
Please see attached DB-RFQP package in the ¿Documents¿ tab.
| Code | Description |
| 90927 | Building Construction, Educational |
| 91172 | Design / Bid Contingency |
| 90610 | Buildings, Architectural Design Services |
| 90638 | General Construction, Architectural Services |
| 90735 | Design Services |
| 91116 | C.I.P., Construction and Rehabilitation, Buildings |
| 91148 | C.I.P., Preconstruction Services |
| 91147 | C.I.P., Preconstruction Reimbursable |
| 92537 | Facilities Design Engineering |
| 92544 | General Construction: Management, Scheduling, Cost Estimation Engineering |
| 95826 | Construction Management Services |
Donna Vongsouvan
donna.vongsouvan@facilities.gatech.edu
XXX-XXX-XXXX
Exhibit C
Project No. J-468, Groseclose Building Deferred Renewal
Georgia Institute of Technology
DESIGN BUILDER (DB) FEE PROPOSAL
1. DB'S FEE:
Basis of Fee. The DB's fee is the amount, established by and agreed to by both parties, which is the full amount of compensation due to the DB as gross profit, and for any and all expenses of the Project not included and identified as a Cost of the Work, provided that the DB performs all the requirements of the Contract Documents within the time limits established. (See Article 4.1.1 of the General Requirements.) If applicable, the fees and costs should be broken down by each site within a multi-site project.
A. DESIGN CONSULTANTS FEE:
Design Consultants Fee. Representing the fee amount for basic design services and construction administration services provided by DB. Owner shall pay to DB a Design Consultants Fee:
B. PRECONSTRUCTION FEE:
Pre-Construction Fee. Representing the gross profit for the pre-construction consulting services provided by DB as set forth in Section 2, Parts 1 and 2 of the General Requirements, and as described in Paragraph 4.1.1.1(a), Owner shall pay to DB a Preconstruction Fee:
C. CONSTRUCTION FEE:
Construction Fee. Representing the gross profit for the construction services provided by DB as set forth in Section 3, Part 1 of the General Requirements, and as described in Paragraph 4.1.1.1(b) Owner shall pay to DB a Construction Fee.
2. DB'S PRECONSTRUCTION & CONSTRUCTION OVERHEAD COSTS and EXPENSES:
The DB's Overhead Costs. The maximum amount for the DB's Pre-Construction Costs and Expenses and Construction Overhead Costs are inclusive of all direct and incidental expenses are as described in Paragraph 4.1.1.2 .
_____________________________________________________________
DB Firm Name
By:__________________________________________________________
Signature of DB Officer
_____________________________________________________________
Title of DB Officer
| TOTAL | |
|---|---|
| Design Fee (fixed fee) | $ |
| TOTAL | |
|---|---|
| Pre-Construction Fee (fixed fee) | $ |
| TOTAL | |
|---|---|
| Construction Fee (fixed fee) | $ |
| AMOUNT | |
|---|---|
| A. Maximum Pre-construction Costs & Expenses (From Attachment A. Do not include the Pre-Construction Fee in this amount) | $ |
| B. Maximum Construction Overhead Costs (From Attachment B. Do not include the Construction Fee in this amount) | $ |
| Total Maximum Overhead Cost (Sum of A & B) | $ |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-68990-NONST-2027-000000043
State Government of Georgia
Bid Due: 8/20/2026
Description Opening Date/Time Closing Date/Time RFQ 26-35-004 Hamilton Crossing Safe Roads to Schools
Bartow County
Bid Due: 7/29/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-62551-NONST-2026-000000228
State Government of Georgia
Bid Due: 7/28/2026
2026-15: LAS Service Road Replacement Phase 2 Bids due by 10:00 a.m. on
City of Covington
Bid Due: 8/25/2026