| Agency: | GENERAL SERVICES ADMINISTRATION |
|---|---|
| State: | Colorado |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | May 11, 2026 |
| Due Date: | Jun 11, 2026 |
| Solicitation No: | EQPXAFB-26-0008 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The existing Siemens fire alarm system does not meet current GSA facility standard or building code requirements. The existing fire alarm system was originally installed as a Siemens MXLV multiplex addressable fire alarm system in 1999. In 2008 a renovation of the fire alarm system added dual channel voice circuits and programming, and replaced all existing notification appliances with new synchronized strobe appliances, to include strobes and speaker strobes. New synchronization modules were added to accomplish this. Currently the manufacturer no longer supports field initiating devices and notification appliances, and spare parts are becoming less frequently available resulting in higher maintenance and repair costs to the government. A new fire alarm and emergency voice communication system will ensure operational integrity of the building fire alarm system, improve long-term maintenance capabilities, and avoid costly building disruptions if the existing fire alarm system experiences failures. This project includes the design and installation of a new and complete network digital-addressable fire alarm system and emergency voice alarm communication system, a new bi-directional amplifier two-way radio communications enhancement system, and a new two-way communication system. The system shall include all wiring, raceways, pull boxes, terminal cabinets, outlet and mounting boxes, control equipment, alarm and supervisory signal initiating devices, alarm notification appliances, and all other accessories and miscellaneous items required for complete operational systems even though each item is not specifically mentioned or described. The fire alarm installation shall also include the installation of new digital addressable elevator smoke detection control panels which are monitored by the base building fire alarm system via alarm, supervisory, and trouble signal contacts. A new elevator smoke detection control panel shall be provided for each elevator machine room. Fire alarm replacement may be phased, however DB phasing plans must be reviewed and acceptable to GSA authority having jurisdiction. Upon acceptance of the new fire alarm system the contractor shall be responsible for demolition of the
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Follow Z--PARK CENTER WELL VALVE REPLACEMENT Active Contract Opportunity Notice ID 140L1726Q0022 Related
INTERIOR, DEPARTMENT OF THE
Bid Due: 8/07/2026
Follow NIST Boulder Building 4 Room 1318 Fire Suppression Updates Active Contract Opportunity
COMMERCE, DEPARTMENT OF
Bid Due: 8/14/2026
Follow San Juan Cattle Guard Replacements Active Contract Opportunity Notice ID 1240LT26Q0158 Related
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/27/2026
Description: C27DM4 - CMGC Pre-Const Services: SpCk Dam Rehab Proj Department: DNR -
State Government of Colorado
Bid Due: 6/30/2027