DAF WTP Pump VFD Replacement
| Agency: | State Government of Texas |
|---|---|
| State: | Texas |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Sep 15, 2025 |
| Due Date: | Oct 13, 2025 |
| Solicitation No: | RFB2025-067 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
RFB2025-067
Posted
Chris Hanchard
(254) 750-6640
christopherh@wacotx.gov
10/13/2025
2:00 PM
M1612
21+ Days for Solicitation Notice
9/15/2025
9/15/2025 2:06 am
69139-Drives, Variable Speed (Ac, Ac Flux Vector, Dc, Eddy Current, Mechanical, Variable Speed Pulleys, Hydrostatic Speed Variator);
91082-Wiring And Other Electrical Maintenance And Repair Services;
91359-Construction And Upgrades, Wastewater Treatment Plant;
91438-Electrical;
93662-Pumps And Pump Accessories Maintenance And Repair;
1. The project generally consists of the replacement for the Dissolved Air Flotation Water Treatment Plant Pump No. 2 VFD furnishing of all labor, materials, equipment, appurtenances, and incidentals as shown, specified and required for demolition, removal, and disposal work required to properly install the equipment and ensure all instrument and control connections are correctly configured, follow the manufacturer’s installation guide, verify wiring according to the schematic, and perform functioning testing before commissioning the VFD. The project requires all site work, labor, equipment, and materials complete and in place as stated in the RFB, shown on the plans, and specified herein.
2. General Contractor shall self-perform a minimum of 51% of this project.
3. Liquidation Fee is $1000.00 for each day of delay.
4. TxDot Qualifications are NOT Required for this project.
The Work will be substantially completed and in-service in 255 calendar days as provided in Paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions in 285 calendar days. If Additive Alternate #1 is awarded in any combination with the Base Bid, the Work will be substantially completed and in-service in 325 calendar days, and the project will be completed and ready for final payment in 355 calendar days . If a Contractor wants to perform work on Saturdays, Sundays, or City holidays, the Contractor shall seek approval by making a written request to City.
See Also
Electrical Maintenance & Repair Services, Waco District Follow Solicitation Solicitation ID: 601310000103527 Status:
State Government of Texas
Due by 11/30/2026
Bid Number: 27-07 Bid Title: Bid NO. 27-07 Town Creek Branch Slope Repair
City of Huntsville
Due by 11/24/2026
Bid NO. 27-07 Town Creek Branch Slope Repair Follow Solicitation Solicitation ID: NO.27-07
State Government of Texas
Due by 11/24/2026
Solicitation Details eResponse Instructions Subscribe Print PDF Type: Invitation For Bids (IFB) Status:
City of Austin
Due by 12/01/2026