Cutting and Patching Curb and Gutter

Agency: Jefferson County
State: Wisconsin
Type of Government: State & Local
NAICS Category:
  • 237310 - Highway, Street, and Bridge Construction
  • 238110 - Poured Concrete Foundation and Structure Contractors
  • 238990 - All Other Specialty Trade Contractors
Posted Date: Jul 7, 2026
Due Date: Jul 30, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Attachment Preview

SECTION 01 73 29
CUTTING AND PATCHING
PART 1: GENERAL
1.01 DESCRIPTION
A. Execute cutting, fitting, or patching of Work required to:
1. Make separate parts fit properly.
2. Uncover Work to allow installation of Work not installed at the proper time.
3. Remove and replace defective Work.
4. Remove and replace Work not conforming to requirements of Contract Documents.
5. Install specified Work in existing construction.
6. Provide finished surfaces that match adjacent existing surfaces to fill voids caused by the
removal or replacement of materials.
B. Pay costs caused by Work that is not installed at the proper time, defective Work, or Work not
conforming to Contract Documents, including costs for additional services of
Architect/Engineer.
PART 2: PRODUCTS
2.01 MATERIALS
A. Replacement of Work Removed: Comply with specifications for the type of Work to be done.
B. Placement of Work to fill Voids caused by Removal: Comply with latest industry standards
for the type of Work to be done.
A. Inspect existing conditions of Work, including elements subject to movement or damage
during:
1. Cutting and patching.
B. After uncovering Work, inspect conditions affecting installation of new products.
3.02 PREPARATION PRIOR TO CUTTING
A. Provide shoring, bracing, and support as required to maintain structural integrity of Project.
B. Provide protection for other portions of Project.
C. Provide protection from weather.

3.03 PERFORMANCE
A. Neatly cut or demolish along straight, true, square lines. B. Execute cutting and demolition by
methods that will prevent damage to other Work and will provide proper surfaces to receive
installation of repairs and new Work.
C. Restore Work that has been cut or removed; install new products to provide complete Work in
accordance with requirements of Contract Documents.
D. Refinish entire surfaces as necessary to provide an even finish.
1. Continuous Surfaces: To the nearest intersections.
2. Assembly: Refinish entirely.
END OF SECTION 01 73 29

This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.