May 20, 2026
ADDENDUM NO. 1
Project:
Beaumont ISD Chiller Replacement Project (Guess E.S.)
(CSP 26.15)
Prepared by:
Salas O’Brien Engineers
10930 W. Sam Houston Parkway N., Suite 900
Houston, Texas 77064
SOBE Project No.: 2650-00566
Prepared For:
Prospective Proposers
PART A:
NOTICE TO PROPOSERS
1.
Receipt of this Addendum shall be acknowledged on the Proposal Form. Failure
to do so may subject Proposers to disqualification. Each Proposer shall make
necessary adjustments and submit his proposal with full knowledge of all
modifications, clarifications, and supplemental data included therein.
2.
This Addendum forms part of the Contract Documents and shall be incorporated
integrally therewith. Where provisions of the following supplemental data differ
from those of previously issued documents, this Addendum shall govern.
3.
The following Contract Documents have been issued to date delineating the
Work (Project). Contract Documents dated: April 17, 2026
4.
This Addendum consists of 2 typewritten pages and 1 page of attachments for a
total of 3 pages.
PART B:
PART C:
CHANGES TO PRIOR ADDENDUM
“Any changes to prior issued addendum materials are listed here.”
1.
None
CHANGES TO THE PROJECT MANUAL
“Any changes to specifications are listed here.”
1.
Section 23 07 19 HVAC PIPING INSULATION
a. Part 3 Execution, Article 3.6 Miscellaneous, Revise Item A to read “New base
mounted pump shall NOT be insulated. Piping insulation and vapor barrier
shall stop at flange to new pump.”
PART D:
CHANGES TO THE DRAWINGS
1.
Sheet M1.1 - MECHANICAL DEMOLITION FLOOR PLAN MECHANICAL
YARD
a. Replace keyed #7 in its entirety with the following: “7. EXISTING CHILLED
WATER PUMP SERVING “A&B”, ASSOCATED ISOLATION VALVES AND
APPARTATUSES SHALL BE REMOVED. EXISTING CONCRETE PAD
SHALL REMAIN AND BE REUSED.”
2.
Sheet M2.1 MECHANICAL FLOOR PLAN MECHANICAL YARD
a. Replace keyed #7 in its entirety with the following: “7. EXISTING 6”
CONCRETE PAD SHALL REMAIN AND BE REUSED. EXTEND EXISTING
COPNCRETE PAD FOR NEW PUMP.”
10930 W. Sam Houston Pkwy N, Suite 900
Houston, Texas 77064
281.664.1900
salasobrien.com
Beaumont ISD Chiller Replacement Project (Guess E.S.)
Addendum 1
PART E:
PART F:
PART G:
PART H:
3.
Sheet M3.1 MECHANICAL PIPING DIAGRAMS
a. Detail #1 Demolition Chilled Water Piping Diagram, Demolition Keyed Notes,
Replace keyed #6 in its entirety with the following: “6. EXISTING CHILLED
WATER PUMP SERVING “A&B”, ASSOCATED ISOLATION VALVES AND
APPARTATUSES SHALL BE REMOVED. EXISTING CONCRETE PAD
SHALL REMAIN AND BE REUSED.”
b. Detail #2 Chilled Water Piping Diagram, Keyed Notes, Replace keyed #9 in its
entirety with the following: “9. EXISTING 6” CONCRETE PAD SHALL
REMAIN AND BE REUSED. EXTEND EXISTING CONCRETE PAD FOR
NEW PUMP.”
4.
Sheet M4.1 MECHANICAL SCHEDULES AND DETAILS
a. Delete detail #2 in its entirety.
RE-ISSUED DRAWING SHEET (30” x 42”)
“Insert the following sheets and omit the previously issued sheets of the same number.”
1.
None
NEW DRAWINGS SHEETS (30” x 42”)
1.
None
QUESTIONS/CLARIFICATIONS
1.
Question: If I need an additional site visit is it possible to make that happen?
Answer: The district has agreed to provide an additional site visit on 5/27 @
10AM.
2.
Question: Is the district okay with moving the pump over a few feet to help with
getting the new chiller installed sooner or would the district like the new pad in
the same existing location?
Answer: The district requests the new pump to be installed in the same location
as the existing pump. The existing concrete pad will be reused and extended as
described in the addendum items above.
3.
Question: Can we get an explanation on why the single point rather than dual
point? If the manufacturer cannot accommodate a single point connection is it an
acceptable modification to return to dual point connection?
Answer: The approved manufacturers listed in the specification each require
only a single-point electrical connection. Additionally, selecting an air-cooled
chiller with a single-point connection allows reuse of the existing overcurrent
protection with minimal disruption to the current installation. By contrast, a dual-
point connection air-cooled chiller would require a second overcurrent protective
device in the MCC or at the branch-circuit tap.
ATTACHMENTS
1.
Pre-Proposal Sign in Sheet
END OF ADDENDUM 1
10930 W. Sam Houston Pkwy N, Suite 900
Houston, Texas 77064
281.664.1900
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bradshaw Unit - Install HVAC Inmate Housing Follow Solicitation Solicitation ID: 696-FD-26-P050 Status:

State Government of Texas

Bid Due: 8/31/2026

DYESS AFRC CHILLER REPLACEMENT Solicitation ID: TMD26-CFMO-0045092 Due Date: 8/11/2026 Due Time: 1:00

State Government of Texas

Bid Due: 8/11/2026

TDCJ - Coleman Unit - Procurement of 50 Ton HVAC Install Package Follow

State Government of Texas

Bid Due: 8/07/2026

Follow 366TRS HVAC Mini Split Active Contract Opportunity Notice ID FA302026Q0078 Related Notice

DEPT OF DEFENSE

Bid Due: 7/28/2026