Cross-Connection Control Specialist and Backflow Prevention Assembly Tester Services for Cross-Connection Control Program Support

Agency: Zone 7 Water Agency
State: California
Type of Government: State & Local
NAICS Category:
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
  • 541330 - Engineering Services
  • 541611 - Administrative Management and General Management Consulting Services
  • 541990 - All Other Professional, Scientific, and Technical Services
Posted Date: Aug 11, 2026
Due Date: Sep 4, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page


Project ID:

Title: Cross-Connection Control Specialist and Backflow Prevention Assembly Tester Services for Cross-Connection Control Program Support

Addenda: 0

Release Date: 8/11/2026

Due Date: 9/4/2026

Follow
Cross-Connection Control Specialist and Backflow Prevention Assembly Tester Services for Cross-Connection Control Program Support
Request For Proposal
Water Quality
96818
Project ID: RFP-2026-010
Release Date: Tuesday, August 11, 2026
· Due Date: Friday, September 4, 2026 1:00pm
Posted Tuesday, August 11, 2026 11:00am
All dates & times in Pacific Time
Draft Response No Bid23 days, 18 hours, 23 minutes


Post Information

Posted At:Tue, Aug 11, 2026 11:00 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

Zone 7 Water Agency desires to hire a qualified and reliable consultant with Cross-Connection Specialist and Backflow Prevention Assembly Tester certifications to support implementation of the Agency’s Cross-Connection Control Program (CCCP). The selected Consultant will conduct annual and as-needed testing, repairs, and/or replacements, of backflow devices. New devices may need to be installed as needed. Additionally, the Consultant will perform state-required hazard assessment of new or significantly modified backflow devices. The Consultant will also assist in revising the CCCP Implementation Plan as needed and develop new Standard Operating Procedures (SOPs) for CCCP related tasks such as backflow testing and incident response.

The selected Consultant shall have at least five years of cross-connection control experience in California and have performed hazard assessments and backflow prevention assembly testing that meet the requirements of California’s Cross-Connection Control Policy Handbook (CCCPH). Additionally, the Consultant must hold valid Cross-Connection Control Specialist and Backflow Prevention Assembly Tester certifications from certifying organizations recognized by the State Water Resources Control Board (SWRCB), such as the American Water Works Association California-Nevada Section (CA/NV AWWA).

Proposals must be submitted through the E-Procurement Portal at https://procurement.opengov.com/portal/zone7water , no later than 1 p.m. on August 25, 2026.



Background

On December 19, 2023, the State Water Resource Control Board (SWRCB) adopted the Cross-Connection Control Policy Handbook (CCCPH). The CCCPH became effective on July 1, 2024, and replaced Title 17, the original statute governing cross-connection controls, on January 1, 2025. The purpose of the CCCPH is the protection of public health through the establishment of standards to protect the public water system’s potable distribution system through the prevention of any potential backflow or back-siphonage of water from end-user sources back into the potable distribution system. The Agency falls under the CCCPH definition of a Public Water System and is subject to the CCCPH requirements. In order to provide a safe and reliable supply of water for the Tri-Valley area, the Agency submitted a plan in compliance with all the elements to the SWRCB on July 1, 2025. This plan may require revisions if requested by the SWRCB.

The Agency currently has twenty air gaps and ninety-one backflow prevention assemblies in its water system. The Agency owns all backflow prevention devices within its facilities. The Agency’s retail customers are responsible for managing their own cross-connection control programs. The Agency has water supply contracts with its direct customers that allow access and testing of all backflow prevention devices.



Timeline

Release Project Date:
August 11, 2026
Question Submission Deadline:
August 28, 2026, 1:00pm
Response Submission Deadline:
September 4, 2026, 1:00pm
Exceptions or Deviations Taken:
September 4, 2026, 1:00pm
Interview Date (if needed):
September 9, 2026, 1:00pm
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Number Title Type NAICS Code(s) Due Date Issue Date Status OP138358 A Line

LA Metro

Bid Due: 8/13/2026

Bid Number: PC-27-007 Bid Title: EMS ELECTRIC GATE INSTALL Category: Construction Projects Status:

Cosumnes Community Services District

Bid Due: 9/09/2026

Number Title Type NAICS Code(s) Due Date Issue Date Status OP138358 A Line

LA Metro

Bid Due: 8/18/2026