| Agency: | County of Greenville |
|---|---|
| State: | South Carolina |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jun 29, 2025 |
| Due Date: | Aug 1, 2025 |
| Solicitation No: | IFB #26002 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Project ID: IFB #26002
Title: Cripple Creek - Stream Improvement and Riparian Area Reclamation (SCIIP)
Addenda: 0
Release Date: 6/27/2025
Due Date: 8/1/2025
The Cripple Creek Stream Improvement and Riparian Area Reclamation project is intended to establish a riparian forest and perform a restoration along stream banks within the Reedy River watershed. An 800-foot stream improvement project is proposed along this corridor. The purpose of this project would be to dissipate erosive energy in the system by laying back vertical banks to at least a 3:1 slope, and where possible, creating a bankfull bench. The stream restoration work may include bank grading with the help of soil lifts, coir matting, turf reinforcement matting, boulder walls and bank toe treatments (toe rock, toe wood, and boulder toes(s)). They will also include the installation of instream features such as cross vane(s), boulder/constructed riffle(s), stream drop(s), j-hook vane(s), and single arm vane(s). Additionally, these projects may include re-routing or daylighting of streams.
In some locations a one-sided stream improvement may be the only viable option due to the proximity of the stream to the railroad. However, any improvement to even one side of the stream will ultimately help to lower the stress applied to the opposite bank especially for Priority 2 and 3 stream restorations. By stabilizing streams and restoring it’s surrounding vegetation, streams become much less likely to erode, and by reducing velocity and sediment loading, reduce the risk of downstream problems. Additionally, reforesting the areas along streams help to further bolster a stream’s resistance to erosion. In general, reforesting also reduces stormwater volume, reduces pollutant loadings, and increases ecological diversity.
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Number Deadline 2026070 RFP#2026070 SPARTANBURG COUNTY TIER 2 PENNY ROADWAY RECLAMATION- PROJECT BLUE
County of Spartanburg
Bid Due: 6/18/2026
Project Name: Bridge to the Wild Restaurant and Forest Habitats Agency/Owner: Riverbanks Zoo
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/23/2026
Ad Title: Timber Sale SNF 006 ADV TS 26 LC 288 Purchasing Agent/Entity:
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/13/2026
Solicitation Number Solicitation Description Purchasing Agency Delivery Point Submission Ending Date/Time 5400019471 SOIL
State Government of South Carolina
Bid Due: 4/20/2099