Crane Rental Services at Garrison Dam, ND
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | North Dakota |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | May 20, 2025 |
| Due Date: | May 22, 2025 |
| Solicitation No: | W9128F25QA045 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: May 19, 2025 08:36 pm CDT
- Original Date Offers Due: May 22, 2025 02:00 pm CDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Jun 06, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: W038 - LEASE OR RENTAL OF EQUIPMENT- CONSTRUCTION, MINING, EXCAVATING, AND HIGHWAY MAINTENANCE EQUIPMENT
-
NAICS Code:
- 238990 - All Other Specialty Trade Contractors
-
Place of Performance:
Garrison , ND 58540USA
The solicitation and attachment to the solicitation are posted in the attachments section below.
Project Description:
The contractor shall provide a crane capable of lifting, placing, and removing a 24,000 lb. Geoprobe 3230 track mounted drill rig into and out of the Garrison Spillway. In addition, the crane shall be used to place all drilling and support equipment (less than 24,000 lbs) onto the spillway. Delivery is planned for June 2, 2025. One crane mobilization and one demobilization shall be required to 1) place the drill rig into the spillway and 2) remove the drill rig from the spillway at project completion. The duration of work required to place the drill rig is assumed to be 1 day or less. The duration of work required to remove the drill rig is assumed to be 1 day or less. Contractor shall submit details on crane needed to perform lift.
The crane shall be capable of supporting a load of 24,000 lbs. and have a relatively long reach. The crane required including all details shall be justified in the quote submitted. The following requirements are involved in the determination of the appropriate crane for the lift:
a. Crane shall be a minimum of 30 feet from spillway wall.
b. Top of spillway wall to floor of spillway is approximately 25 feet.
c. Deer fence on the spillway wall that is 10 feet tall above ground surface.
- KO CONTRACTING OFFICE 1616 CAPITOL AVENUE
- OMAHA , NE 68102-4901
- USA
- Euemduan Osmera
- euemduan.c.osmera@usace.army.mil
- Nadine Catania
- nadine.l.catania@usace.army.mil
- May 19, 2025 08:36 pm CDTSolicitation (Original)
- May 19, 2025 08:32 pm CDT Presolicitation (Original)
Related Document
| May 20, 2025 | [Presolicitation (Original)] Crane Rental Services at Garrison Dam, ND |
See Also
Project: City of Fargo Rental Wheeled Trommel Screener Ref. #: RFQ26298 Type: RFQ