CPL - Nitrogen spigot installation
| Agency: | State Government of Ohio |
|---|---|
| State: | Ohio |
| Type of Government: | State & Local |
| Posted Date: | Dec 15, 2025 |
| Due Date: | Dec 29, 2025 |
| Solicitation No: | SRC0000035857 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Solicitation ID: | SRC0000035857 |
| Solicitation Name: | CPL - Nitrogen spigot installation |
| Original Begin Date: | 12/12/2025 4:25:24 PM |
| Begin Date: | 12/12/2025 4:25:24 PM |
| End Date: | 12/29/2025 5:00:00 PM |
| Inquiry End Date: | 12/24/2025 12:00:00 AM |
| Commodity: | Laboratory general purpose tubing |
| MBE Set Aside: | MBE Set Aside |
| Agency: | AGR380000 - CONSUMER PROTECTION LAB |
| Solicitation Status: | Open for Bidding |
| Solicitation Type: | Quick Quote |
|
In an MBE set-aside solicitation, only those bidders/suppliers with an active MBE certification at the time the solicitation closes can submit a response
|
|||
|
Solicitation ID
SRC0000035857
|
|||
|
Solicitation Name
CPL - Nitrogen spigot installation
|
RFx Type
Quick Quote
|
||
|
Lot #
1
|
Solicitation Status
Open for Bidding
|
||
|
Round #
1
|
MBE Set Aside
|
||
|
Begin Date
12/12/2025 4:25:24 PM (ET)
|
Amendment?
|
||
|
End Date
12/29/2025 5:00:00 PM (ET)
|
Inquiry End Date
12/24/2025 12:00:00 AM
|
||
|
Summary
The Consumer Protection Laboratory has a stand alone nitrogen tank outside the building. The request is to install a new transfer line for a secondary spigot to reach the outside the west doors.
|
Predecessor Contract
|
||
|
Process
The award will be made to the lowest responsive and responsible Bidder and/or Supplier that can meet the requested specifications within the time period outlined. |
|||
|
Ship To
|
|||
1 Record(s)
|
0 Record(s)
|
1 Record(s)
|
Attachment Preview
Scope of Work:
Liquid VJ Pipe Extension for new fill location:
Install a ½” VJ (approx. 85’) pipe system from the liquid connection point on the tank up to the front step entrance for a new manual Dewer fill. Run VJ piping line around the tank pad to the exterior building. Mount hangers on the building to fasten the piping. At the stair entrance provide and mount a stainless-steel lockable cage/cabinet to enclose the fill valve.
• VJ piping to be ½” x 2” rigid VP bayonet style.
• Use flex fittings at all elbow turns for expansion.
• Install proper relief valves in between any ball valves.
• Have a on/off valve at fill side in the new enclosure.
• All piping is made to length. Lead times to be expected.
Notes:
1. Does not include plans and/or permits.
2. Work to be completed during normal business hours, Monday-Friday.
3. Customer to provide clean working area and staging area