300246 Coventry Boat House

Agency: University of Connecticut
State: Connecticut
Type of Government: State & Local
Posted Date: Jan 5, 2026
Due Date: Jan 22, 2026
Solicitation No: 300246
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
300246 Coventry Boat House
Number 300246
Open 12/19/2025
Close 1/22/2026 2:00 PM
Type ITB - Invitation to Bid
Pre-Bid
Non Mandatory

1/06/2026 2:00 PM UPDATED

44 Lake Street UPDATED
Coventry, Connecticut 06238
United States
Map It

RFI
1/13/2026 2:00 PM
Contact Chris Peters chris.peters@uconn.edu (860) 486-6324
Details Only previously prequalified contractors may submit a bid for this project.
Documents 300246-Solicitation-Information-Sheet .pdf

300246-Project-Information-Sheet .pdf .pdf

Attachment Preview

SOLICITATION INFORMATION SHEET
CONSTRUCTION - GENERAL CONTRACTOR/TRADE CONTRACTOR
INVITATION TO BID
The University of Connecticut is accepting sealed Bids for:
ITB RELEASE DATE: December 19, 2025
PROJECT NUMBER: 300246
PROJECT NAME:
Coventry Boat House
PROJECT LOCATION: 44 Lake Street, Coventry, CT 06238
PROCUREMENT AGENT: Chris Peters, chris.peters@uconn.edu, 860-486-6324
INTENT OF THIS SOLICITATION: The purpose of this Invitation to Bid (“ITB”) is to solicit bids for the
Coventry Boat House project.
LOCATION OF THIS SOLICITATION: Submit a Bid for this solicitation through the HuskyBuy Portal:
https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=UConnFullSuite.
CRITICAL DATES:
Pre-Bid Conference Date and Time
Pre-Bid Conference Location
Q&A (RFI) Due Date and Time
Bid Due Date and Time
Scope Review Meeting (with lowest
qualified Bidder)
1/6/2026
2:00 PM
44 Lake Street, Coventry, CT 06238
1/13/2026
2:00 PM
1/22/2026
2:00 PM
1/26/2026
10:00 AM
PRE-BID CONFERENCE: During the Pre-Bid Conference, the ITB and Scope of Work will be discussed. There
also will be an opportunity to view existing conditions (if applicable). The Pre-Bid Conference is not
mandatory, however, interested Bidders are strongly encouraged to attend.
REQUEST FOR INFORMATION QUESTIONS: All Requests for Information (“RFI”) questions are to be posted
under the Q&A Board Tab in the HuskyBuy sourcing event for this Solicitation. No phone calls or RFI
questions emailed directly to the Procurement Agent will be accepted.
Construction GC-Trade ITB, July 2024
Page 1 of 5
CLARIFICATIONS, ADDENDA, and INTERPRETATIONS: Bidders shall promptly notify the University of any
ambiguity, inconsistency, or error which they may discover upon examination of the plans, specifications,
and contract documents.
Any and all interpretations of the drawings, specifications, RFI Responses, contract documents, and
supplemental instructions, will be in the form of a clarification/addendum, and posted as part of the
HuskyBuy sourcing event. Failure of a Bidder to receive any such clarification/addendum or interpretation
shall not release a Bidder from the obligations under its Bid as submitted.
BID OPENING: Bid openings are conducted via virtual conference at 2:15 p.m. on the due date. It is the
responsibility of the Bidder to request access to the bid opening prior to the bid due date and time via
email to the Procurement Agent listed for this solicitation.
CONSIDERATION OF BIDS: Cost Proposals received in response to this ITB are opened during a public
opening. To ensure the integrity of the bidding process, the Total Bid Amount and prices for any
Alternates are read at the bid opening. After the bid opening and before the contract award, the lowest
responsible Bidder is determined by adding together the Total Bid Amount plus any Alternates (additive
or deductive) accepted by the University. The University reserves the right to elect to implement some,
all, or none of the Alternates (if applicable) set forth in this Bid, as may be in the best interest of the
University. Prices for Alternates are not negotiable since they are a component in determining the lowest
responsible Bidder.
ELIGIBLE PREQUALIFIED BIDDERS: The following Contractors are prequalified and may submit a bid for
this Project:
All State Construction Inc
BRD Builders LLC
Carlin Construction Company, LLC
Connecticut Carpentry Corporation
Daniel O'Connells Sons Inc
DEF Services Group, Ltd
Dimeo Construction Company
Diversity Construction Group
Downes Construction Company
G. Donovan Associates, Inc.
JLY Enterprises LLC
KBE Building Corporation
Kronenberger & Sons Restoration LLC
Lee Kennedy Co., Inc.
Loureiro Building Construction, LLC
Mattern Construction, Inc.
Noble Construction & Management Inc
Nosal Builders, Inc.
O&G Industries, Inc.
Pat Munger Construction Company, Inc.
Richards Corporation
Sarazin General Contractors, Inc.
Construction GC-Trade ITB, July 2024
Page 2 of 5
Scope Construction Company Inc.
The Associated Construction Company
The Morganti Group, Inc.
The Whiting-Turner Contracting Company
Turner Construction Company
Western Buiders, Inc.
Wohlsen Construction Company, Inc.
Zlotnick Construction
PROJECT SCHEDULE/DURATION:
Anticipated Contract Issuance/Notice to Proceed: February, 27 2025
Construction Start: 3/2/2026
Project Duration: 11 Months
Boat Storage Area Complete: August 2026
LIQUIDATED DAMAGES: Liquidated Damages of Five Hundred Dollars and 00/100 ($500.00) per calendar
day shall be assessed if the Contractor fails to achieve Substantial Completion or causes delay to the
Substantial Completion of any portion of the work within the Contract Time.
WAGE RATES: Prevailing Wages are required for this Project if the total cost of all work to be performed
by the Contractor and Subcontractors is $100,000.00 or more and subject to Connecticut General Statutes
§31-53, §31-54, and §31-55: https://www.cga.ct.gov/current/pub/chap_557.htm#sec_31-53.
PROJECT DESCRIPTION/SCOPE OF WORK:
The scope of work includes the complete demolition of the existing facility, including removal of the
oil tanks and septic tank, as well as all associated site work and utility connections. Demolition activities and
the connection to the town-owned sewer system will be permitted by the Town of Coventry.
The project also includes construction of a new 6,000-square-foot facility, repaving of the parking
areas, and backfilling of the site to create proper grades for ramps and access to the boat storage area. A
gravel pathway to the lake is also included.
The proposed building will be a slab-on-grade wood structure designed for year-round use. The
conditioned portion of the building will include student and coach lounges, as well as restroom facilities. A
new propane tank will also be required.
COST PROPOSAL: Submit a Cost Proposal utilizing the Form provided. No substitution of the Form is
permitted.
FINANCIAL ABILITY: The lowest responsible Bidder will be required to submit their Company’s financial
documents within 5 business days of notification from the University. The financial documents must
demonstrate the Company’s ability to complete a construction project with a minimum value of at least
$2,750,000. See the Financial Ability Prequalification Requirements Document for further information.
Failure of the lowest responsible Bidder to submit financial documents during the specified timeframe or
failure to pass the University’s financial requirements will result in a non-responsive Bid.
Note: Financial documents are not required to be submitted with your Company’s bid submission.
Construction GC-Trade ITB, July 2024
Page 3 of 5
MISCELLANEOUS REQUIRED DOCUMENTS: The Bid shall include the following documents:
1. SEEC Form 10: Review the SEEC Form 10: Notice to Executive Branch State Contractors and Prospective
State Contractors of Campaign Contribution and Solicitation Limitations (acknowledgment of receipt
of the explanation of prohibitions) and upload the executed Form where applicable. The Form can be
found at: https://seec.ct.gov/Portal/data/forms/ContrForms/seec_form_10_final.pdf.
2. Bidder Contract Compliance Monitoring Report: Review the Commission on Human Rights and
Opportunities Bidder Contract Compliance Regulations Notification to Bidders and upload the
completed Report where applicable. The Form can be found at: https://portal.ct.gov/-
/media/DDS/conversion/NotificationtoBidders1.pdf.
3. Bid Security: A bid security in the form of a bid bond, certified check or a treasurer’s or cashier’s check
issued by a responsible bank or trust company, payable to the University of Connecticut (reference
the attached bid bond form) must accompany all bids if the Total Bid Amount is over $50,000.00. Bid
bonds must be issued by a surety licensed in Connecticut and listed on the Department of Treasury’s
Listing of Approved Sureties with an underwriting limitation of no less than the full amount of the bid.
The bid security shall be in the amount equal to TEN PERCENT (10%) of the amount of the bid. In lieu
of a bid bond or certified check, a letter of credit that shall be in the amount of TEN PERCENT (10%)
of the total bid amount for a bid valued less than $100,000 and in the amount of twenty-five percent
(25%) of the bid amount for any bid value that exceeds $100,000 may be submitted.
CONTRACT: A draft of the contract has been provided with the solicitation documents. The University
reserves the right to modify the contract or waive any informality as it deems to be in the best interest of
the University. By submitting a Proposal, your Company accepts the contract and any modifications that
the University deems necessary to it without exception. Proposers will be notified of any modifications
to the contract made by the University. Any exceptions to the contract submitted by the Proposer will
not be considered.
SET-ASIDE REQUIREMENTS: The Set-Aside Requirement for this Project is that (1) not less than thirty
percent (30%) of the Total Contract Price be awarded to subcontractors who are certified by the
Connecticut Department of Administrative Services as “Small Business Enterprises” (“SBEs”) and (2) not
less than ten percent (10%) of the Total Contract Price be awarded to subcontractors who are certified by
the Connecticut Department of Administrative Services as “Minority Business Enterprises” (“MBEs”) (the
10% set aside for MBEs may be included in the 30% set aside for SBEs). If the Contractor is an S/MBE,
then any self-performed work may be included in the Set-Aside Requirement. The Contractor is
responsible for ensuring that they, and the S/MBEs they have selected, are eligible Connecticut-certified
S/MBE contractors.
Listed below is a sample of suggested categories (if applicable) and possibilities for the breakout of the
schedule of values for inclusion of S/MBE participation:
01 – General Conditions: temporary electric and wiring; cleaning
02 – Existing Conditions: demolition and salvage; abatement
03 – Concrete: sidewalks and flatwork
05 - Metals: metal stairs and railings; miscellaneous metals; decorative metal
06 - Woods Plastics and Composites: rough carpentry and blocking
07 – Thermal and Moisture Protection: insulation; sealers and waterproofing
Construction GC-Trade ITB, July 2024
Page 4 of 5
08 – Openings: door hardware
09 – Finishes: tile installation; acoustic ceilings; flooring installations; painting and coatings;
firestopping
10 – Specialties: signage
12 – Furnishings: window treatments
14 – Conveying Equipment: lifts
23 – HVAC (Heating, Ventilating, Air Conditioning): HVAC duct insulation
27 – Communications: low voltage cabling
28 – Electronic Safety & Security: fire alarm and security wiring
32 – Exterior Improvements: retaining walls; paving; fencing and gates; landscaping
44 – Pollution and Waste Control Equipment: trucking
End of Solicitation Information Sheet
Construction GC-Trade ITB, July 2024
Page 5 of 5
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Project ID: Title: Clifton Street Boat Launch Addenda: 0 Release Date: 5/17/2026 Due

City of New Haven

Bid Due: 6/10/2026