| Agency: | County of Lake |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jun 23, 2026 |
| Due Date: | Jul 8, 2026 |
| Solicitation No: | Q2026-00105 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
|
|||||||||||||||||||||||||||||||||
|
County Administration Building Electrical Assessment
All prices submitted are to be on the form below in accordance with all terms and conditions set forth in this Request for Quotation. Prices quoted should be in unit of measure shown.
Prices shall be quoted F.O.B. Destination – inside delivery, freight included and shall be inclusive of all costs. Current and/or anticipated applicable fuel costs should be considered and included in the price quoted. Delivery of items is to be within 30 days after any purchase order is issued. |
|||||||||||||||||||||||||||||||||
|
Supporting Documents Below are supporting documents that have been added to this RFQ. Please be sure to review these documents prior to responding to this RFQ. |
|||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
|
Specifications and/or Special Conditions
Change made on 06/23/2026: The bid due date has changed from 07/31/2026 to 07/08/2026.
Background Check Requirement
Under any County contract that involves vendor or subcontractor personnel working in proximity to minors, the vendor hereby confirms that any personnel so employed will have successfully completed an initial, and subsequent annual, Certified Background Check, completed by the vendor at no additional cost to the County. The County retains the right to request and review any associated records with or without cause, and to require replacement of any vendor employee found in violation of this requirement. Vendor shall indemnify the County in full for any adverse act of any such personnel in this regard. Additional requirements may apply in this regard as included within any specific contract award.
Certain insurance requirements apply to any purchase in response to this RFQ:
If "yes" is specified above, the specific requirements are described within this RFQ. The vendor selected for award must provide a Certificate of Insurance that clearly complies with the stated insurance requirements prior to issuance of any purchase order. Failure to do so within the requested timeframe (five (5) working days under otherwise noted) may be cause for rejection of that vendor's response.
Insurance Requirements
Insurance Requirements BCC Under $25k
I acknowledge and agree to abide by all conditions contained in this quotation as well as any special instruction sheet(s) if applicable. Payment terms 30 Days from receipt of materials and/or services and receipt of a proper invoice; delivery FOB Destination – Inside Delivery.
|
|||||||||||||||||||||||||||||||||
OFFICE OF FACILITIES MANAGEMENT SCOPE OF WORK
Project Name: County Administration Building
Address: 315 W Main St., Tavares, Fl 32778
Project Manager: Paul Doran
Unless otherwise noted, the Contractor shall provide all required labor, material, equipment, plans, engineering, surveys,
permitting, and local and state inspections to provide 100% turnkey project. Change orders shall not be issued for incidental
items or tasks that should have been reasonably construed to be part of the project by the Contractor.
PURPOSE
The purpose of this solicitation is to select a Certified Electrical Contractor to perform a comprehensive electrical system
assessment for the County Administration Building located at 315 W Main St., Tavares, FL 32778. The assessment is to
evaluate safety, code compliance, operational reliability, and capacity of existing electrical infrastructure. The assessment
shall identify deficiencies, verify system ratings, and provide recommendations for corrective action and capital planning.
The assessment shall be performed after business hours.
SCOPE OF WORK
The Contractor shall provide all labor, supervision, equipment, tools, and materials necessary to perform a comprehensive
electrical system assessment including, but not limited to, the following:
1. Load and Overcurrent Protection Evaluation
* Verify amperage requirements of existing electrical loads
* Confirm conductor sizing and ratings
* Evaluate overcurrent protective devices for proper sizing and coordination
* Identify overloaded circuits and undersized components
2. Plans and Specifications Review
* Compare existing installation to available plans and specifications
* Identify deviations from design documents and as-built drawings
* Document undocumented field modifications
3. Code Compliance Assessment
* Identify electrical code violations in accordance with applicable codes
* Review installation methods for compliance
* Document improper connections and installations
* Identify potential safety hazards
4. Panelboard and Equipment Verification
* Verify proper panel sizes and configurations
* Confirm available capacity and spare breaker space
1
* Verify rating of all electrical equipment including panels, disconnects, transformers, and switchgear
* Confirm compatibility of connected loads with equipment ratings
5. Testing and Performance Checks
* Perform operational testing of electrical distribution equipment
* Evaluate system performance under normal operating conditions
* Identify abnormal operating conditions or load imbalances
6. Infrared (Thermographic) Testing
* Perform infrared scanning of electrical panels, switchgear, transformers, and major connections
* Identify overheating components and loose connections
* Provide thermographic images and analysis
7. Ground Integrity Testing
* Test grounding electrode system
* Verify continuity of equipment grounding conductors
* Identify deficiencies in grounding system
8. Insulation Resistance Testing
* Perform insulation resistance testing on feeders and selected circuits
* Identify deteriorated insulation and potential failure points
9. Equipotential Bonding Testing
* Verify equipment bonding where applicable
* Confirm bonding between electrical equipment and grounding system
* Identify missing or inadequate bonding
10. Panel Schedule and Circuit Accuracy
* Verify panel schedules for accuracy
* Confirm circuit labeling matches field conditions
* Identify unidentified or mislabeled circuits
* Document available spare capacity
11. Documentation and Reporting
* Provide written report summarizing findings
* Include photographs and thermographic images
* Provide testing data and measurements
* Identify code violations and safety concerns
* Provide prioritized recommendations for corrective actions
* Identify capacity concerns and future planning considerations
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Project ID: Title: Resurfacing, Resealing, Restriping Addenda: 0 Release Date: 7/6/2026 Due Date:
Pinellas County Schools
Bid Due: 8/04/2026
Project ID: 26-0529-ITB-C Title: Ridgecrest YMCA Elevator Modernization Addenda: 0 Release Date: 7/22/2026
Pinellas County
Bid Due: 8/04/2026
Project ID: Title: Small Grant Initiative (SGI) Addenda: 0 Release Date: 7/22/2026 Due
Alachua County
Bid Due: 8/26/2026
Follow Sources Sought - Sunshade Repair Active Contract Opportunity Notice ID FA481926K0003 Related
DEPT OF DEFENSE
Bid Due: 7/30/2026