Corridor Study and Conceptual Design

Agency: American Planning Association
State: Federal
Type of Government: State & Local
NAICS Category:
  • 541310 - Architectural Services
  • 541330 - Engineering Services
Posted Date: Feb 10, 2025
Due Date: Mar 21, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Corridor Study and Conceptual DesignCity of Bloomington

Bloomington, IN

The City of Bloomington is seeking a consultant to develop a Corridor Study and Conceptual Design for the 4.1-mile Kinser Pike, Madison Street, and Rogers Street corridor from the 45/46 Bypass to Country Club Road. This Study will align with the City's Comprehensive Plan, Transportation Plan, and Safe Streets and Roads for All Safety Action Plan, advancing the City's goal of eliminating fatal and serious injury crashes on local roadways by 2039.

The project will consist of two main phases:

Phase One: Corridor Analysis – Consultants will gather data through public engagement and analysis to identify issues and goals for the corridor. This phase will include quantitative data (e.g., traffic counts, crash data) and qualitative data (e.g., interviews, surveys, public input). The data will inform a traffic simulation and analysis of potential infrastructure improvements. Public presentations will share findings before moving to the next phase.

Phase Two: Conceptual Design – Using the goals developed in Phase One, consultants will design a feasible, implementable conceptual redesign. This will include multiple design alternatives and detailed cross-sections for each corridor block. The design will be reviewed through robust public engagement and analysis, including community feedback and visual tools like virtual reality and cross-sections. Consultants will propose a design that emphasizes safety and multimodal transportation options. Public presentations will be made to the City's steering committee, boards, and commissions.

The project is expected to take approximately 10 months. A strong emphasis on public engagement, including virtual and in-person options, is critical. The Study's goal is to create a design that improves safety, prioritizes non-automotive modes, and fosters equitable access, while addressing the community's broader goals from the Comprehensive Plan.

The final deliverables will include a conceptual design, public engagement summary, traffic analysis, and an implementation strategy with cost estimates for both short-term and long-term improvements. The City encourages submissions from minority-owned businesses, women-owned businesses, small business enterprises, and local firms.

RFI Response Deadline (5:00 PM ET) March 21, 2025


Request Type
Deadline

Request Type
RFP

Deadline
Friday, March 21, 2025
Contact InformationWebsite
https://bloomington.in.gov/planning
Contact Email
roblingr@bloomington.in.gov
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Follow Mississippi Valley Division Civil Works Areas of Interest Commercial Solutions Openings Active

DEPT OF DEFENSE

Due by 5/28/2027

Follow Regional Africa and the Middle East: Lobito Corridor Electrification Project Feasibility Study

UNITED STATES TRADE AND DEVELOPMENT AGENCY

Due by 10/26/2026

Follow C--Architect-Engineering firms for surveying project. Active Contract Opportunity Notice ID DOIFFBO260022 Related

INTERIOR, DEPARTMENT OF THE

Due by 2/28/2027

Follow Project FLYTRAP 6.0 Active Contract Opportunity Notice ID WHSDIUFLYTRAP Related Notice Department/Ind.

DEPT OF DEFENSE

Due by 10/16/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.