| Agency: | State Government of Georgia |
|---|---|
| State: | Georgia |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 24, 2026 |
| Due Date: | Jun 1, 2026 |
| Solicitation No: | PE-66888-NONST-2026-000000004 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66888-NONST-2026-000000004 | Corporate Hangar Re-Development & FBO Assignment | Peachtree City Airport Authority |
Apr 24, 2026 @ 02:50 PM
|
Jun 01, 2026 @ 02:30 PM
|
Start Date: Apr 24, 2026 @ 02:50 PM ET
End Date:
Jun 01, 2026 @ 02:30 PM ET
A rare opportunity to secure long-term control of aviation infrastructure in the Atlanta metro through a dual-platform investment: a 9.1-acre corporate hangar redevelopment and an 8.5-acre FBO operation with existing fuel farm and facilities.
Investment Highlights
¿ Dual revenue: immediate FBO cash flow + hangar development upside
¿ Prime location: 25 miles from Atlanta in a high-demand aviation market
¿ Scarce asset: limited airport land with long-term ground lease (20¿30 yrs)
¿ Turnkey operations: renovated FBO, fuel farm, equipment in place
Phase One: Hangar Development
9.1 acres with taxi-lane access for ADG III¿IV aircraft (Gulfstream/Global Express class).
Redevelop site into premium corporate hangars, offices, and aviation support space.
Strategy: Build high-demand assets, secure long-term tenants, generate stable lease income.
Phase Two: FBO Operations
6,648 SF facility with pilot lounge, offices, and conference space; fuel farm with 30,000-gallon capacity and fleet.
Revenue: Fuel sales, service fees, tenant support.
Strategy: Increase fuel flow, enhance services, integrate with hangar tenants.
Market Drivers
¿ Atlanta = major aviation hub
¿ Reliever airport with strong corporate demand
¿ 5,768 ft runway with ILS + planned control tower (2028)
Investment Thesis
Capture immediate income, create long-term value, and control both aviation real estate and operations in a high-growth market.
Deadline: June 1, 2026
| Code | Description |
| 91817 | Aviation Consulting |
| 90910 | Airport Facility Construction |
| 90911 | Airport Facility Maintenance and Repair |
| 95803 | Airport Management Services |
| 90606 | Airports, Lighting, Fueling, Navaids, Architectural Services |
| 92845 | Fueling Services, Mobile, Vehicle |
| 40518 | Gasoline, Aviation, Including Jet Fuel |
| 97126 | Hangar Facilities for Aircraft, Rental or Lease |
| 90517 | Airport Ground Handling Services |
Hope Macaluso
hope@kffc.org
770-487-2225
Request for Information - Corporate Hangar Re-Development
& FBO Assignment
Peachtree City Airport Authority
Atlanta Regional Airport - Falcon Field (KFFC)
7 Falcon Drive, Peachtree City, GA 30269
Issue Date: April 24, 2026
Proposal Due Date: June 1, 2026 by 2:30 p.m. EST
INTRODUCTION
The Atlanta Regional Airport - Falcon Field (FFC), Peachtree City Airport Authority, Peachtree
City, Georgia is classified in the National Plan of Integrated Airport System (NPIAS) as a
General Aviation reliever airport for the Atlanta metropolitan area.
This RFI is for two Phases.
SCOPE OF WORK
Phase One: The project consists of approximately 9.1 acres of developed property west of the
Fixed Based Operator (FBO) and has a taxi lane on the western portion running alongside of the
parcel for access to adjoining parcels with corporate hangars for ADG-III to IV aircraft. The site
has multiple connecting existing hangars which the airport looks to redevelop. Proposals should
provide programmatic details for redeveloping the existing site and providing a schematic design
concept for development of a corporate hangar or hangars for as a corporate campus to house
Airplane Design Group (ADG)-III to IV aircraft (Gulfstream 6 or Global Express, for example).
The existing hangars should be demolished as part of the proposed development scope of work.
The airport desires proposals for this phase to include a lease for the tract, which will be for
direct aeronautical activities. A description for a proposed hangar redevelopment and overview
should be provided with schematic layout.
1. The proposed project shall include but is not limited to proposed project design,
construction, management, operation and maintenance of an aircraft hangar/hangar complex and
must include the most current hangar structure technology and all details regarding the proposed
hangar structure.
2. The proposed hangar development must be able to house aircraft no smaller than a
Gulfstream 5, or with a wingspan of 84 to 117 feet wide.
3. Successful Lessee is required to submit a 7460-1 to the (FAA) Office of Obstruction
Evaluation/Airport Airspace Analysis (OE/AAA) and must receive a favorable determination
prior to commencing construction.
4. The best proposal for the hangar development, will include their concept of the site with
the following inclusions being considered; taxi-lane, and apron layouts suitable for
accommodating general aviation aircraft; airfield access; potential utility corridors; and vehicular
access and automobile parking are accommodating to the airport.
5. Other factors to consider that will be evaluated are FAA design standards (BRL, OFA,
RSA, TSA, critical areas, etc.), airport topography, lease boundaries, airport property limits,
geotechnical information, stormwater management considerations, and FAR Part 77 airspace
evaluation requirements. A formal submittal to FAA for airspace review will be requested by
the selected proposer during the preliminary design phase of the development program.
6. The airport has determined that a fuel facility will NOT be constructed on this property.
7. The description must include, but not be limited to the following:
a) Lounge/Office spaces
b) Hangar aircraft support systems
c) Ramps/aprons, and
d) All available information.
8. Responders shall provide a Proposed Lease Rate per Square Foot, to be considered by the
Airport Authority. The highest and best use scenario will be considered. The Lease Rate per
Square Foot should be based on parcel size. Ground Lease may be on a long-term basis, i.e.
thirty (30) years or twenty (20) years plus a ten (10) year extension, depending upon the
proposed project.
The lessee will be responsible for all maintenance, (routine and/or emergency), of all facilities
and capital improvements, maintenance of insurance, on any part of the facility, capital
improvements, ramps, parking areas, access control gates, etc. The successful responder shall
comply with all current code requirements in regard to improvements to all parts of the leasehold
area.
Phase Two: A lease/proposal for FBO management including the fuel farm. The parcel is
approximately 8.5 acres.
The airport authority is interested in entertaining a lease/proposal for management/operating the
FBO with fuel farm to be managed by a third party which is located 25 miles southwest of
Atlanta at 7 Falcon Drive, Peachtree City, Georgia 30269. The airport provides convenient
access to hotels, conference centers, restaurants, and recreational activities. Falcon Field is
approximately three miles south of Peachtree City's central business district. The airfield has one
asphalt runway; Runway 13/31 which is 5,768 feet long and is equipped with a precision
instrument landing system. An Air Traffic Control Tower is in the design phase with a projected
commissioning date in 2028.
The FBO building is 6,648 square feet which includes a pilot lounge with shower, front desk
area, two conference rooms, six offices, two sets of men and women restrooms and one extra
unisex restroom, three storage closets one with washer & dryer connections and large foyer with
open views of the ramp area. The FBO has just completed a $280,000 renovation of the interior.
It has a fuel farm with two 15 fifteen-thousand-gallon fuel tanks (Jet-A & AvGas) and they lease
four fuel trucks, one 3000-thousand-gallon Jet-A truck, one 5000-thousand-gallon Jet-A truck,
and two 1,000-gallon AvGas trucks which they lease from Perry Brothers, its fuel provider. The
FBO has 46 auto parking spaces.
A proposal should include revenue projections based on the current and future fuel flowage
policy.
1. The proposed management proposal should include but is not limited to any proposed
future project designs or construction on the property, and management philosophy for the FBO.
These plans will be reviewed by the airport authority prior to any award.
2. The best proposal for a new FBO, will include their concept of operation and
management.
3. Responders shall provide a Proposed Lease Rate per Square Foot per annual, to be
considered by the Airport Authority. The highest and best use scenario will be considered. The
FBO lease structure may be on a long-term lease, i.e. thirty (30) years or twenty (20) years plus a
ten (10) year extension, depending upon the proposal.
The lessee will be responsible for all maintenance, (routine and/or emergency), of all facilities,
capital improvements, ramps, parking areas, access control gates, insurance, etc. The successful
responder shall comply with all current code requirements in regard to improvements to all parts
of the leasehold.
The airport has signed certain Grant Assurances and Certifications with the Federal Aviation
Administration (FAA) for the receipt of federal funds. In doing so, property designated as
"airport property" is to be used primarily for those projects supporting "direct aeronautical"
activities. Direct aeronautical activities involve all those functions normally associated with
basing, housing, and maintaining an aircraft or multiple aircraft on airport property.
A Pre-Submittal meeting will be scheduled. To attend please contact Ms. Hope Macaluso,
Aviation Director at Atlanta Regional Airport - Falcon Field, hope@kffc.org 770.487.2225
by May 4, 2026. Zoom or Teams links will be available, but in-person attendance is
encouraged.
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66917-NONST-2026-000000005
State Government of Georgia
Bid Due: 8/13/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-76010-NONST-2026-000000040
State Government of Georgia
Bid Due: 8/11/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) 48400-eRFQ-001840-2027
State Government of Georgia
Bid Due: 8/18/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66316-NONST-2027-000000005
State Government of Georgia
Bid Due: 8/20/2026