CoOp Cooling Tower installation
| Agency: | City of New Haven |
|---|---|
| State: | Connecticut |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jul 10, 2025 |
| Due Date: | Jul 22, 2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID:
Title: CoOp Cooling Tower installation
Addenda: 1
Release Date: 6/16/2025
Due Date: 7/22/2025
This project for the NHBOE involves the removal and replacement of the existing cooling tower at the CO-OP School in New Haven. The NHBOE will be pre-purchasing the new cooling tower, and contractor’s scope will include the demolition of the existing tower, structural modifications, rigging, and installation of all associated piping, electrical, insulation, and controls. Due to the size of the equipment and logistics, the project will require a large crane, temporary street shutdowns, and police detail coordination.
See Also
Nathaniel Ely Center Roof Top Unit (RTU) HVAC Replacement The City of Norwalk
State Government of Connecticut
Due by 11/20/2026
Bid Number: 4548 Bid Title: Nathaniel Ely Center Roof Top Unit (RTU) HVAC
City of Norwalk
Due by 11/20/2026
Project: Nathaniel Ely Center Roof Top Unit (RTU) HVAC Replacement Ref. #: 4548
City of Norwalk
Due by 11/20/2026
Greeneille fire House Floor Repair The intent of this project is to improve
State Government of Connecticut
Due by 11/05/2026