Control of Aquatic Invasive Plant Species and Aquatic Surveys, Buffuvmille Lake, Charlton, MA and Hodges Village Dam, Oxford, MA
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Mar 20, 2025 |
| Due Date: | Apr 4, 2025 |
| Solicitation No: | W912WJ25Q0067 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Mar 20, 2025 03:28 pm EDT
- Original Date Offers Due: Apr 04, 2025 02:00 pm EDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Apr 19, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: F999 - OTHER ENVIRONMENTAL SERVICES
-
NAICS Code:
- 541990 - All Other Professional, Scientific, and Technical Services
-
Place of Performance:
THE WORK CONSISTS OF:
Furnish all materials, equipment, and labor necessary to apply a systematic aquatic herbicide to control Fanwort, Eurasian Milfoil, and Spiny Naiad in approximately 35 acres of Buffumville Lake, Charlton, MA. Granular Fluridone shall be the herbicide used to treat approximately 32.28 acres of Fanwort, split between two applications. Liquid Diquat Dibromide shall be the herbicide used to treat Spiny Naiad one time at the south end of the lake totaling approximately 2.72 acres. Furnish all labor and equipment necessary to conduct a full lake comprehensive invasive plant species survey with a detailed final report.
In addition, furnish all materials, equipment, and labor necessary to conduct a partial river, all inclusive, invasive aquatic plant species survey on approximately 3.3 river miles of the French River, from Greenbriar Park to Hodges Village Dam, Oxford, MA, as well as hand removal of all Water Chestnut found. A final comprehensive report and maps of the presence of all aquatic invasive plant species will be submitted.
This procurement is set-aside for small business vendors. The applicable NAICS code is 541990 with a Small Business Size Standard of $19.5 Million.
ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.
- KO CONTRACTING DIVISION 696 VIRGINIA ROAD
- CONCORD , MA 01742-2751
- USA
- Jennifer M. Samela
- jennifer.m.samela@usace.army.mil
- Phone Number 9783188324
- Mar 20, 2025 03:28 pm EDTSolicitation (Original)
- Mar 04, 2025 11:17 am EST Presolicitation (Original)
Related Document
| Mar 4, 2025 | [Presolicitation (Original)] Control of Aquatic Invasive Plant Species and Aquatic Surveys, Buffuvmille Lake, Charlton, MA and Hodges Village Dam, Oxford, MA |
| Apr 7, 2025 | [Award Notice (Original)] Control of Aquatic Invasive Plant Species and Aquatic Surveys, Buffuvmille Lake, Charlton, MA and Hodges Village Dam, Oxford, MA |
See Also
Follow F--HAZARDOUS WASTE REMOVAL AT LSBS Active Contract Opportunity Notice ID 140G0226Q0183 Related
INTERIOR, DEPARTMENT OF THE
Due by 9/22/2026
Follow F--Synopsis: Oil Well Plugging at BISO Active Contract Opportunity Notice ID DOIPFBO260026
INTERIOR, DEPARTMENT OF THE
Follow SB ERS MATOC, USACE Northwestern Division and EPA Region 2 Active Contract
DEPT OF DEFENSE
Follow LD3 Tree Removal Active Contract Opportunity Notice ID W912ES26QA102 Related Notice Department/Ind.
DEPT OF DEFENSE
Due by 9/23/2026