CONTRACT NO. C211 - FEMA SANDY POWER SUPPLY AND PLANT WIDE PROJECT

Agency: Bergen County
State: New Jersey
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing
Posted Date: Feb 4, 2026
Due Date: Mar 25, 2026
Solicitation No: BCUA-25-C211
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Project: CONTRACT NO. C211 - FEMA SANDY POWER SUPPLY AND PLANT WIDE PROJECT
Ref. #: BCUA-25-C211
Department: BC Utilities Authority
Type: RFB
Status:
Open
Open Date: Dec 24th 2025, 9:00 AM EST
Questions Due Date: Feb 23rd 2026, 3:00 PM EST
Close Date: Mar 25th 2026, 3:00 PM EDT

Project Description: A. The Work is located in Little Ferry, New Jersey at the Bergen County Utilities Authority Little Ferry Water Pollution Control Facility (BCUA LFWPCF) near the intersection of Empire Blvd and Mehrhof Road.
B. The Work to be performed under Contract No. C211 – FEMA Sandy Power Supply and Plant Wide Project includes, furnishing all labor, materials, equipment and incidentals required to complete the Power Supply, Floodwall and Plantwide Improvements in their entirety as shown on the Contract Documents and as specified herein.
C. This project consists of restoration and mitigation of power supply and plantwide systems throughout the Little Ferry Water Pollution Control Facilities. The power supply flood mitigation measures also include elevating, replacing and flood proofing major electrical components and constructing elevated platforms above the 500 year flood elevation at the Main Switchyard, Main Switchgear Building, six critical Substations (No. 1 through 6), replacing existing feeders, existing cables and existing duct banks, constructing a second story on and reinforcing the Main Switchgear building, constructing parallel duct bank, and performing other related activities like installation of fencing, gates, stairs, and concrete pads.
D. The proposed plantwide scope of work includes the installation of flood walls and flood barriers, dry flood proofing wall apertures, sealing pipe penetrations, raising and replacing existing electrical equipment, and replacing mechanical equipment with submersible type equipment which are all better suited for future flooding conditions. This work impacts the following locations: Main Pump Buildings No. 1 and 2, Primary Sludge Pumping Stations No. 1 through 4, Grit Building, Secondary Sludge Pumping Stations No. 1 through 4, Dewatering Building, Sludge Storage Building, the Control Building, the Administrative Building, Pipe Galleries, and the Lagoon Pumping Station.


* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bid Title: Environmental Commission Special Meeting February 20, 2026 Category: Environmental Commission Notices

Township of Millburn

Bid Due: 12/31/2026

Bid Title: 6/2/26: 48 Hour Notice - Special Meeting for Closed Session -

Township of Millburn

Bid Due: 6/03/2026

PA Generator 2026-28

Perth Amboy Housing Authority

Bid Due: 6/16/2026

Legal Notices Request For Qualifications - Construction Engineering and Inspection Services for Safe

Chatham township

Bid Due: 7/16/2026