Continuing Authorities Program Section 14 Greenville Utilities Commission (CAP 14 - GUC)
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | North Carolina |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | May 15, 2025 |
| Due Date: | May 30, 2025 |
| Solicitation No: | W912PM25BA011 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Original)
- Original Published Date: May 15, 2025 02:57 pm EDT
- Original Response Date: May 30, 2025 02:00 pm EDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Jun 14, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z2PZ - REPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIES
-
NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
Greenville , NCUSA
The work includes installing riprap along 400 linear feet of the east streambank of the Tar River that is adjacent to the Plant's raw water intake structures. The existing articulated block embankment protection will be removed in areas where the articulated blocks underlays the proposed U.S. Army Corps of Engineers (USACE) design, and the streambank will be graded prior to riprap placement. The riprap is to be placed at a 1.5:1 (horizontal to vertical) slope for 400 linear feet. Riprap placed at the toe of the slope will form a platform of launchable stone approximately 8 feet wide with varying thickness. For the upstream end of protection, the riprap shall be keyed into the existing stream bank until the riprap intersects with the existing grade/ground elevation. The riprap shall be placed on top of a filter system that consists of a 6-inch-thick layer of NCDOT No. 4 stone atop non-woven geotextile fabric.
- KO CONTRACTING DIVISION 69 DARLINGTON AVENUE
- WILMINGTON , NC 28403-1343
- USA
- Sonny Smith
- sonny.z.smith@usace.army.mil
- Phone Number 9102514493
- Troy Small
- troy.d.small@usace.army.mil
- Phone Number 9105244650
- May 15, 2025 02:57 pm EDTPresolicitation (Original)
Related Document
| Jun 23, 2025 | [Solicitation (Original)] Continuing Authorities Program Section 14 Greenville Utilities Commission (CAP 14 - GUC) |
| Jul 15, 2025 | [Solicitation (Updated)] Continuing Authorities Program Section 14 Greenville Utilities Commission (CAP 14 - GUC) |
| Jul 23, 2025 | [Solicitation (Updated)] Continuing Authorities Program Section 14 Greenville Utilities Commission (CAP 14 - GUC) |
See Also
Follow Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009) Active
VETERANS AFFAIRS, DEPARTMENT OF
Due by 12/09/2026
Designer Solicitations - George Watts Hill Alumni Center Renovation and Addition By kiabell
University of North Carolina
Due by 11/19/2026
2nd STREET GARAGE ELEVATOR MODERNIZATION Reference number: ITB-S1-11026 Closing date: December 03, 2026,
City of Wilmington
Due by 12/03/2026
Project: Mint Museum Randolph Roof Repair Project - Phase II Ref. #: 269-2027-043
City of Charlotte
Due by 12/08/2026