Construction Services for Retaining Wall Replacement/ Prague, Czech Republic
| Agency: | STATE, DEPARTMENT OF |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Aug 12, 2026 |
| Due Date: | Aug 27, 2026 |
| Solicitation No: | 19EZ8026Q0010 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Aug 12, 2026 12:00 pm CEST
- Original Date Offers Due: Aug 27, 2026 05:00 pm CEST
- Inactive Policy: Manual
- Original Inactive Date: Aug 27, 2026
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1FZ - CONSTRUCTION OF OTHER RESIDENTIAL BUILDINGS
-
NAICS Code:
- 23814 - Masonry Contractors
-
Place of Performance:
Prague , CZ-101 16000CZE
Construction Services for Retaining Wall Replacement– Prague 6 area
Solicitation: 19EZ8026Q0010
The U.S. Embassy in Prague seeks a contractor for the complete replacement of a 19-meter-long, 2.0-meter-high retaining wall located between two Government-Owned (GO) residential properties in Prague 6.
The work includes demolition of the existing statically damaged retaining wall and adjacent fencing, excavation and earthwork, construction of new reinforced concrete foundations and a new RC retaining wall, installation of a drainage and waterproofing system, wall capping, installation of new 80 cm fencing with tie-ins to existing structures on both sides of the property line, and full site restoration. Actual concealed site conditions may vary; the contractor is responsible for verifying all measurements in the field prior to submitting a proposal. The contractor's work shall comply with Czech National Standards or U.S. codes and standards, whichever is more stringent
Contractor Requirements: The contractor shall provide all necessary quantity surveyors, personnel, equipment, materials, and supervision to complete the services per the technical requirements under a firm fixed price. The period of performance for all phases of the project shall not exceed 15 days from Contract Award, with construction milestones including:
Key Responsibilities:
- Submit reports, bill of materials, product literature, drawings, specifications, quality control schedule, project safety plan, and construction costs
- No work beyond the SOW unless directed in writing by the Contracting Officer (CO); work begins only after issuance of a Notice to Proceed (NTP)
- Ensure professional quality, technical accuracy, and coordination of all services; designate a Project Site Manager approved by the COR
Additional Requirements:
- Contractor's employees and subcontractors must submit corporate, financial, and personnel information — including construction vehicle requirements — for Embassy review within 10 days of NTP
- Provide a fixed-price lump sum proposal in CZK (with and without VAT), including specification of materials
- Estimated project implementation window: autumn 2026
In applying for the solicitation material, you are acknowledging that your company can achieve compliance with the following highlighted requirement included in the solicitation:
In accordance with DOSAR 652.242-73 AUTHORIZATION AND PERFORMANCE (AUG 1999), it will be necessary for your organization to possess authorization to operate and do business in the country in which this contract will be fulfilled. Therefore, authorization shall include the requirement to be registered to do business in the Czech Republic. You will be required to provide information that clearly demonstrates your ability to perform work in Prague.
Vendors interested in the detailed solicitation package may request it at pragueGSOprocurement@state.gov.
Due Date for Quotations: August 27, 2026
Site Inspection Date: mandatory (for details, please contact pragueGSOprocurement@state.gov)
Submission Method: Via email to pragueGSOprocurement@state.gov
Contact Information for Questions: pragueGSOprocurement@state.gov
This pre-solicitation notice does not commit the U.S. Department of State to award a contract, nor does it obligate the U.S. Department of State to pay for any costs incurred in the preparation and submission of proposals.
Solicitation and award will be subject to the laws and regulations of the United States of America. This requirement is being completed utilizing full and open competition procedures.
- DEPARTMENT OF STATE, 2201 C ST NW
- WASHINGTON , DC 20520
- USA
- Prague Procurement Team
- praguegsoprocurement@state.gov
- Prague Procurement Team
- praguegsoprocurement@state.gov
- Aug 12, 2026 12:00 pm CESTSolicitation (Original)
See Also
Follow Demolition and Construction of Thayer Hall at the United States Military Academy,
DEPT OF DEFENSE
Due by 9/24/2026
Follow Y--EAST CANAL EFFICIENCY IMPROVEMENTS Active Contract Opportunity Notice ID 140R4026R0025 Related Notice
INTERIOR, DEPARTMENT OF THE
Due by 9/25/2026
Follow Y--Turnout Buildings Active Contract Opportunity Notice ID 140R4026B0002 Related Notice 140R4026B0002 Department/Ind.
INTERIOR, DEPARTMENT OF THE
Due by 11/10/2026
Follow Philpott Restroom Replacement Active Contract Opportunity Notice ID W912PM26QA041 Related Notice Department/Ind.
DEPT OF DEFENSE
Due by 10/09/2026