Construction Services for New Haven Harbor Improvement Dredging in New Haven, CT

Agency: DEPT OF DEFENSE
State: Connecticut
Type of Government: Federal
FSC Category:
  • Y - Construction of Structures and Facilities
NAICS Category:
  • 237990 - Other Heavy and Civil Engineering Construction
Posted Date: Apr 30, 2026
Due Date:
Solicitation No: W912WJ26BA012
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Follow
Construction Services for New Haven Harbor Improvement Dredging in New Haven, CT
Active
Contract Opportunity
Notice ID
W912WJ26BA012
Related Notice
W912WJ26X1B08
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
US ARMY CORPS OF ENGINEERS
Sub Command
ENGINEER DIVISION NORTH ATLANTIC
Sub Command 2
ENDIST NEW ENGLAND
Office
W2SD ENDIST NEW ENGLAND
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Presolicitation (Original)
  • Original Published Date: Apr 30, 2026 02:04 pm EDT
  • Original Response Date:
  • Inactive Policy: Manual
  • Original Inactive Date: May 30, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Y1QA - CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
  • NAICS Code:
    • 237990 - Other Heavy and Civil Engineering Construction
  • Place of Performance:
    New Haven , CT
    USA
Description

The U.S. Army Corps of Engineers, New England District will be issuing an Invitation for Bids for Improvement Dredging of the New Haven Harbor Federal Navigation Project (FNP) located in New Haven, CT. This procurement is an Unrestricted Invitation for Bid (IFB). The NAICS code for the work is 237990, Other Heavy and Civil Engineering Construction, with a size standard of $37M. Construction is expected to take about nineteen months to complete. The estimated construction cost is between $50,000,000.00 and $100,000,000.00. Any responsible contractor meeting this standard may submit a bid to be considered by the New England District.



The New Haven Harbor Improvement Dredging project consists of mechanically dredging the navigation channel and turning basin from the current 35-foot depth and channel limits to the newly authorized 40-foot depth below mean lower low water (MLLW). The New Haven Harbor FNP extends from Long Island Sound to the confluence at the Quinnipiac River. In addition to deepening, the project expands channel limits: the entrance channel will widen to 600 feet, the bend through the breakwaters to 800 feet, and the main channel between the breakwaters and terminals to 500 feet. This improvement effort involves the removal of up to 3,500,000 CY of fine-grained silt and organic material, 850,000 cubic yards (CY) of medium-to-fine grained sand material, and 60,000 CY of rock. It is expected that some areas of rock may require blasting or other pre-treatment methods. Rock in the channel is to be removed down to a minimum elevation -42 Feet MLLW with a 2-foot allowable overdepth. All other areas are required to be dredged to -40 Feet MLLW with a 2-foot allowable overdepth.



Mechanically dredged material will be placed into scows for transport and disposal, which is split between four local disposal sites and one open ocean disposal site. Central Long Island Sound Disposal Site (CLDS), approximately 7 miles south of the FNP, is the primary material placement site for the project. Four additional placement sites within the harbor and generally within 1 nautical mile of the channel will receive up to 1,500,000 CY of material for beneficial use. Access to these beneficial use sites may require transfer of scows in water depths as shallow as 10 Feet – 15 Feet MLLW (New Haven, CT mean tide range ~ 6ft). Dredging and disposal operations are anticipated to take roughly 9 to 10 months over two dredging seasons and will be performed during Season One between 1 October 2026 to 1 March 2027 and the Season Two period from 1 October 2027 to 1 March 2028 to meet environmental time of year (ToY) restrictions.



In order to accomplish all dredging requirements within the specified dredging windows it is expected that the Contractor will need to meet a minimum production rate of 300,000 CY per 30 consecutive calendar days. Environmental coordination and permitting has been completed by the U.S. Army of Engineers, New England District.



This is not an invitation for bids at this time. The solicitation requirements and contract documents including instructions for submission and the response date will be available on or about May 18, 2026. Neither telephonic, mailed, nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation, offerors must access the System of Award Management website (https://sam.gov/). All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to Kyle Hall, New England District Contract Specialist, at kyle.k.hall@usace.army.mil or by phone at (978) 318-8479.


Attachments/Links
Contact Information
Contracting Office Address
  • KO CONTRACTING DIVISION 696 VIRGINIA ROAD
  • CONCORD , MA 01742-2751
  • USA
Primary Point of Contact
Secondary Point of Contact


History

Related Document

May 19, 2026[Solicitation (Original)] New Haven Harbor Improvement Dredging, New Haven, CT
Jun 4, 2026[Solicitation (Updated)] New Haven Harbor Improvement Dredging, New Haven, CT
Jun 11, 2026[Solicitation (Updated)] New Haven Harbor Improvement Dredging, New Haven, CT
Jun 25, 2026[Solicitation (Updated)] New Haven Harbor Improvement Dredging, New Haven, CT
Jul 6, 2026[Solicitation (Updated)] New Haven Harbor Improvement Dredging, New Haven, CT
Jul 8, 2026[Solicitation (Updated)] New Haven Harbor Improvement Dredging, New Haven, CT
Jul 14, 2026[Solicitation (Updated)] New Haven Harbor Improvement Dredging, New Haven, CT
Jul 16, 2026[Solicitation (Updated)] New Haven Harbor Improvement Dredging, New Haven, CT
Jul 20, 2026[Solicitation (Updated)] New Haven Harbor Improvement Dredging, New Haven, CT
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow Construction of Chilled Water Replacement and Site Utility Improvements (Phase A2) at

DEPT OF DEFENSE

Follow Electrical Feeder Upgrades, Black Rock Lake Dam, Thomaston, Connecticut Active Contract Opportunity

DEPT OF DEFENSE

Follow Sediment Removal, Black Rock Lake, Thomaston, CT Active Contract Opportunity Notice ID

DEPT OF DEFENSE

2027-01 Camp Oakdale Pickle Ball Court Parking Lot Improvement (Re-Upload) Start Date :

State Government of Connecticut

Bid Due: 8/12/2026