CONSTRUCTION OF SPRING LAKE TRAIL FROM NORTHLAKE BOULEVARD TO OAKLAND ROAD (FDOT LAP)
| Agency: | City of Altamonte Springs |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jul 28, 2025 |
| Due Date: | Aug 6, 2025 |
| Solicitation No: | ITB-25-001-KY |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Main
Agency
City of Altamonte Springs
City of Altamonte Springs
Status
Active
Active
Fiscal Year
2025
2025
Title
CONSTRUCTION OF SPRING LAKE TRAIL FROM NORTHLAKE BOULEVARD TO OAKLAND ROAD (FDOT LAP)
CONSTRUCTION OF SPRING LAKE TRAIL FROM NORTHLAKE BOULEVARD TO OAKLAND ROAD (FDOT LAP)
Number
ITB-25-001-KY
ITB-25-001-KY
Type
Invitation to Bid
Invitation to Bid
Department
Purchasing
Purchasing
Online Submissions
Yes
Yes
Project Estimate
Piggyback Solicitation
No
No
Insurance Required
Yes
Yes
Bid Bond Required
Yes
Yes
Bid Bond Amount
5% of bid amount
5% of bid amount
Performance Bond Required
Yes
Yes
Performance Bond Amount
100% of contract amount
100% of contract amount
Construction Bond Required
No
No
Construction Bond Amount
Scope of Services
The primary intent of this project is to enhance the bicycle and pedestrian safety and connectivity by constructing an 8- to 12-foot-wide multi-use trail, connecting Oakland Road / Lake Orienta Elementary School at Northlake Boulevard. The construction improvements are along the Spring Lake Road for an approximate total length of 0.931 miles. Project scope includes construction of the trail, stabilized sod at the existing property connections, addition of fencing along the northside of the trail to provide security and separation between trail users and property owners, and signing
and pavement marking upgrades. Please see the ITB Solicitation Documents for more details including the Site Visit information and required bonds (Bid Bond, P&P Bond, Maintenance Bond).
The primary intent of this project is to enhance the bicycle and pedestrian safety and connectivity by constructing an 8- to 12-foot-wide multi-use trail, connecting Oakland Road / Lake Orienta Elementary School at Northlake Boulevard. The construction improvements are along the Spring Lake Road for an approximate total length of 0.931 miles. Project scope includes construction of the trail, stabilized sod at the existing property connections, addition of fencing along the northside of the trail to provide security and separation between trail users and property owners, and signing
and pavement marking upgrades. Please see the ITB Solicitation Documents for more details including the Site Visit information and required bonds (Bid Bond, P&P Bond, Maintenance Bond).
Dates(All times are listed as
EST
)
Broadcast Date
6/19/2025 7:00 PM EST
6/19/2025 7:00 PM EST
Question End Date
7/8/2025 11:00 AM EST
7/8/2025 11:00 AM EST
Due Date
8/6/2025 11:00 AM EST
8/6/2025 11:00 AM EST
Bid Opening Date
Pre-Bid Conferences
Total: 0
(All times are listed as
EST
)
| Date | Time | Mandatory | Location |
Documents
Total: 11
Quote/Bid
Quote/Bid Items
Additional Quote/Bid Items Fields
Quote/Bid Items
Total: 1
| # | Required | Group | Make | Model | Description | Quantity | Unit of Measure | Price/ Percent | Type |
| 1 | Total Base Bid Cost | 1 | Price | Service |
Delivery Date
None
None
Required Files to be Uploaded by the Vendor
Proposal Bid Form
Itemized Bid Form
Bidder Submittal Forms
Proposal Bid Form
Itemized Bid Form
Bidder Submittal Forms
Shipping
None
None
Terms and Conditions
None
None
Include Shipping in Price of Items
No
No
Display Bid Tabulation to Vendors
No
No
Display Vendor Submissions to Vendors
No
No
View Vendor Submissions while Bid Solicitation is Active
No
No
Allow Options File to be Updated after Due Date
No
No
Allow Post Due Date Submission
No
No
Commodity Codes
Total: 7
| Code | Description |
| [912-52] | Maintenance and Repair, Hike and Bike Trails |
| [951-7] | Facilities and Other Improvements, Drives, Parking Lots, Paths, Trails |
| [913-95] | Paving/Resurfacing, Highway and Road |
| [913-27] | Construction, Highway and Road |
| [913-71] | Maintenance and Repair, Highway and Road (To include the removal of asphalt, concrete, bitumens, etc) |
| [912-26] | Construction, Hike and Bike Trail |
| [988-63] | Park Area Construction/Renovation |
Publications
Total: 1
| Publication | Date |
| Orlando Sentinel | 6/20/2025 |
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Advertisement Detail Department of Transportation Agency Decisions PALM BEACH AND NORTHERN 3 COUNTIES(NC3)
State Government of Florida
Due by 10/11/2040
Advertisement Detail Department of Transportation Single Source Reedy Creek Improvement District Advertisement Number:
State Government of Florida
Due by 11/12/2050
Solicitation # Project Title Due Date #010-26 Sardinia Drive Lift Station #32 Emergency
City of Eustis
Due by 9/11/2026
Project ID: PSUT-26-06 Title: Phase 2 Polk Building Renovations Addenda: 0 Release Date:
City of Pembroke Pines
Due by 9/08/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.