Construction of New Echo Loder Elementary School
| Agency: | Washoe County School District |
|---|---|
| State: | Nevada |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Dec 5, 2025 |
| Due Date: | Dec 18, 2025 |
| Solicitation No: | 26-37-B-10-DA |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
×Project:
Construction of New Echo Loder Elementary School
Project #:
26-37-B-10-DA
Project #:
26-37-B-10-DA
Scope of Work:
Phased construction of a new two (2)-story elementary school on the existing Echo Loder Elementary School site approximately 100,000 Square Feet. The new Echo Loder Elementary School will be a Type II-B construction and the Scope of Work includes but is not limited to: grading, paving, landscaping and irrigation, underground utilities, masonry, structural steel, plumbing, HVAC and electrical, membrane roofing, architectural metal stud walls, insulation, aluminum framed windows, doors, frames and door hardware, casework, insulation, painting and flooring as drawn and specified. The existing school shall be demolished after the new school is constructed. The construction of a new playground shall be completed after the old school is demolished.
The Awarded Contractor shall provide infrastructure and space allocation only for future photovoltaic system including, but not limited to, provisions for system interconnection in the main service entrance, conduit from the main electrical room B124M to the second-floor electrical room B203M, and conduits from the electrical room B203M to the roof array locations.
In addition, the Awarded Contractor shall test the radio signal strength inside the building after the shell is completed (including roof, walls, doors and windows) to determine if an Emergency Responder Radio Communications System will be required. If it is required, Additive Alternate 2 shall be applied to the project.
Additive Alternate 1: Provide a 300-Kilowatt Direct Current (kWdc) roof mounted solar (non-ballasted) Photovoltaic (PV) System per specification Section 26 31 00. The solar PV System is a design-build by a division 26 Contractor. Please refer to sheet E331 for PV panel array extents. The Awarded Contractor shall provide panel and racking layout drawings as part of the submittal. The Awarded Contractor shall provide all design, conduit, wire, panels, racking, inverters, equipment, etc. as required for a complete system. The area for the PV equipment has been made available in the main electrical room and in the electrical room on the second floor. The Awarded Contractor shall utilize empty conduits provided in base bid for dc wiring from roof to inverter(s) and Alternate Current (ac) wiring from inverter(s) to the main service entrance.
Additive Alternate 2: Engineer, design, permit, installation, testing and commissioning of the Emergency Responder Radio Communications System, which includes submitting a system design to the Washoe County Radio Shop and local fire code official for a deferred submittal permit.
Sealed bids for the Construction of New Echo Loder Elementary School will be received by the Washoe County School District’s (WCSD) Purchasing Department located at the Brown Center 14101 Old Virginia Road, Room #0, Reno, NV 89521, until 2:00 p.m., (Local Time) on December 18, 2025. The bids will be opened publicly via a TEAMS Meeting at 2:30 pm (local time).
https://teams.microsoft.com/l/meetup-join/19%3ameeting_YzM0NDBjMGUtMTFhYy00NTk3LWEzMzgtYmI3ZTk2Nzk4ZWM0%40thread.v2/0?context=%7b%22Tid%22%3a%223cacf549-5e36-41cc-a3de-89459e121def%22%2c%22Oid%22%3a%224cf09aab-f212-4f29-a98f-538ed07bf681%22%7d
Meeting ID: 269 557 306 352 9
Passcode: S29MY2jb
There will be a MANDATORY Pre-Bid Meeting held at 3:30 p.m. on November 6, 2025, at Echo Loder Elementary School (Meet in Front of the Office) 600 Apple Street, Reno, NV 89502. Due to access and coordination involved in this project we highly recommend that contractors walk the project site that we are making available
The Awarded Contractor shall provide infrastructure and space allocation only for future photovoltaic system including, but not limited to, provisions for system interconnection in the main service entrance, conduit from the main electrical room B124M to the second-floor electrical room B203M, and conduits from the electrical room B203M to the roof array locations.
In addition, the Awarded Contractor shall test the radio signal strength inside the building after the shell is completed (including roof, walls, doors and windows) to determine if an Emergency Responder Radio Communications System will be required. If it is required, Additive Alternate 2 shall be applied to the project.
Additive Alternate 1: Provide a 300-Kilowatt Direct Current (kWdc) roof mounted solar (non-ballasted) Photovoltaic (PV) System per specification Section 26 31 00. The solar PV System is a design-build by a division 26 Contractor. Please refer to sheet E331 for PV panel array extents. The Awarded Contractor shall provide panel and racking layout drawings as part of the submittal. The Awarded Contractor shall provide all design, conduit, wire, panels, racking, inverters, equipment, etc. as required for a complete system. The area for the PV equipment has been made available in the main electrical room and in the electrical room on the second floor. The Awarded Contractor shall utilize empty conduits provided in base bid for dc wiring from roof to inverter(s) and Alternate Current (ac) wiring from inverter(s) to the main service entrance.
Additive Alternate 2: Engineer, design, permit, installation, testing and commissioning of the Emergency Responder Radio Communications System, which includes submitting a system design to the Washoe County Radio Shop and local fire code official for a deferred submittal permit.
Sealed bids for the Construction of New Echo Loder Elementary School will be received by the Washoe County School District’s (WCSD) Purchasing Department located at the Brown Center 14101 Old Virginia Road, Room #0, Reno, NV 89521, until 2:00 p.m., (Local Time) on December 18, 2025. The bids will be opened publicly via a TEAMS Meeting at 2:30 pm (local time).
https://teams.microsoft.com/l/meetup-join/19%3ameeting_YzM0NDBjMGUtMTFhYy00NTk3LWEzMzgtYmI3ZTk2Nzk4ZWM0%40thread.v2/0?context=%7b%22Tid%22%3a%223cacf549-5e36-41cc-a3de-89459e121def%22%2c%22Oid%22%3a%224cf09aab-f212-4f29-a98f-538ed07bf681%22%7d
Meeting ID: 269 557 306 352 9
Passcode: S29MY2jb
There will be a MANDATORY Pre-Bid Meeting held at 3:30 p.m. on November 6, 2025, at Echo Loder Elementary School (Meet in Front of the Office) 600 Apple Street, Reno, NV 89502. Due to access and coordination involved in this project we highly recommend that contractors walk the project site that we are making available
Estimate:
| Engineer / Architect Estimate | |
| Estimate | $73,800,000.00 |
| with Force Account | $0.00 |
| Force Account | $1,800,000.00 |
Milestones:
| Advertisement Date: | Fri 10/17/2025 | |
| Pre-Bid Meeting: | Thu 11/06/2025 3:30 PM * | |
|
This meeting is Mandatory.
Location: Echo Loder Elementary School (Meet in Front of the Office) 600 Apple Street Reno, NV 89502 |
||
| Question Deadline: | Mon 11/24/2025 4:30 PM * | |
| Bid Due Date: | Thu 12/18/2025 2:00 PM * | |
Secure Documents
Note: By downloading "Secured Documents" you will be added to the Planholders list.
26-37-B-10-DA - DRAWINGS - VOLUME I
26-37-B-10-DA - DRAWINGS - VOLUME II
ADDENDUM 1 - REVISED DRAWINGS Volume 2
ADDENDUM 1 - REVISED DRAWINGS Volume 1
ADDENDUM 2 - REVISED DRAWINGS
ADDENDUM 3 - REVISED DRAWINGS
26-37-B-10-DA - ADDENDUM 1 complete
26-37-B-10-DA - ADDENDUM 2
26-37-B-10-DA - ADDENDUM 3
ADDENDUM 1 - Echo Loder As-Builts
Notes:
See Scope of Work for details on Bid Opening and Pre-Bid Meeting.
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Location Details Site Address: 770 Warm Springs Rd. City: Las Vegas County: Clark
State Government of Nevada.
Due by 9/24/2026
Project: Maintenance Yard Bullpen Ventilation Improvement Project Bid #26/27-002 PWP #WA-2026-497 Description: The
City of Sparks
Due by 9/23/2026
Follow DISASTER RESILIENCY PROGRAM PHASE 3, CREECH AFB, NEVADA Active Contract Opportunity Notice
DEPT OF DEFENSE
Due by 9/24/2026
Bid Solicitation # 43ADG-S4017 Bid Solicitation # 43ADG-S4017 Organization Name Adjutant General Contract
State Government of Nevada
Due by 10/23/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.