| Agency: | City of Independence |
|---|---|
| State: | Kansas |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jun 4, 2026 |
| Due Date: | Jul 9, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Bid Title: |
Construction of a Steel Storage Tank
|
| Category: | Airport Improvements |
| Status: | Open |
|
| Internal wetted and vapor-space steel | Stripe coat + 2 coats immersion-grade epoxy lining; then UV topcoated | 20-30 mils |
|---|---|---|
| Exterior buried steel | Factory-applied 100% solids polyurethane/polyurea/hybrid or high-build buried- service epoxy | 70 mils minimum; 80 mils target |
| Exterior exposed steel | Epoxy primer + high-build epoxy + aliphatic polyurethane or polysiloxane | 10-14 mils |
| Grade transition band | Buried coating extended above grade, then UV topcoated | Same as buried system plus UV topcoat |
Coating Specifications:
Buried exterior steel surfaces shall receive a factory-applied, high-build dielectric coating system
suitable for permanent buried steel service without cathodic protection. Coating shall be applied
over a NACE surface profile as recommended by the coating manufacturer. All edges shall be
rounded, welds cleaned, and discontinuities removed before blasting.
The buried coating system shall be plural-component 100% solids polyurethane, polyurea,
polyurethane/polyurea hybrid, or 100% solids high-build epoxy rated by the manufacturer for
buried steel service. Minimum total dry film thickness shall be 70 mils / 1,750 m, with 80 mils /
2,000 m target.
All buried coated surfaces shall be holiday tested in accordance with NACE SP0188. No
holidays, pinholes, cracks, blisters, delamination, exposed steel, underfilm contamination, or
mechanically damaged coating shall be accepted. All repairs shall be made using the coating
manufacturer's written procedure and shall be retested before backfill. NACE SP0188 provides
procedures for high- and low-voltage holiday detection of new non-conductive coatings on
conductive substrates.
No backfill shall be placed until the buried coating has passed final holiday testing and visual
inspection. The first backfill lift against the tank shall be clean sand or selected fine granular
material free of sharp stone, slag, cinders, rubble, organic material, debris, or corrosive
contaminants. Coating shall be protected from damage during lifting, setting, shoring removal,
and backfilling.
Revised coating schedule
Surface Coating system DFT
Internal wetted and Stripe coat + 2 coats immersion-grade epoxy lining;
20-30 mils
vapor-space steel then UV topcoated
Factory-applied 100% solids
Exterior buried 70 mils minimum;
polyurethane/polyurea/hybrid or high-build buried-
steel 80 mils target
service epoxy
Exterior exposed Epoxy primer + high-build epoxy + aliphatic
10-14 mils
steel polyurethane or polysiloxane
Same as buried
Grade transition Buried coating extended above grade, then UV
system plus UV
band topcoated
topcoat
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Contract: 526082515 Call #: 251 Project Number: 040 TE 0576-01 Federal Project Number:
State Government of Kansas
Bid Due: 8/19/2026
Contract: 526082424 Call #: 242 Project Number: 050 TE 0551-01 Federal Project Number:
State Government of Kansas
Bid Due: 8/19/2026
Contract: 526082313 Call #: 231 Project Number: 098 TE 0535-01 Federal Project Number:
State Government of Kansas
Bid Due: 8/19/2026
Follow Construct Air Traffic Control (ATC) Tower Active Contract Opportunity Notice ID W912DQ26RA061
DEPT OF DEFENSE
Bid Due: 8/17/2026