Construction of a Spur Jetty at the mouth of the Saco River at Camp Ellis Beach in Saco, Maine.
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Maine |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Sep 5, 2025 |
| Due Date: | Oct 15, 2025 |
| Solicitation No: | W912WJ26BA004 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Original)
- Original Published Date: Sep 05, 2025 11:11 am EDT
- Original Response Date: Oct 15, 2025 01:00 pm EDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Oct 30, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
-
NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
Saco , ME 04072USA
The U.S. Army Corps of Engineers, New England District will be issuing an Invitation for Bids for construction of a spur jetty that will be tied in to the existing North Jetty located at the mouth of the Saco River at Camp Ellis Beach in the City of Saco, Maine. The NAICS code for this procurement is 237990 with a size standard of $45M. The contract solicitation is planned to be issued in the fall of 2025 with construction to take place over a 12-month period beginning in the spring of 2026. The estimated construction cost is between $10,000,000 and $25,000,000.
The existing North Jetty at Camp Ellis Beach is an interlocked stone structure located at the entrance to the Saco River. Originally constructed in 1872, the structure has been lengthened and repaired numerous times over the years. The existing North Jetty is approximately 6,600 feet in length and constructed to a height of 15 feet MLW with an 8-ft crown width. Side slopes are 1H:1V. The proposed jetty spur will extend from the existing North Jetty into Saco Bay.
The proposed work consists of constructing a 750-ft long spur jetty extending from the North Jetty into the Saco Bay at a location approximately 1500’ from shore. As part of the spur jetty construction, the Contractor will reinforce an approximately 100-ft length of the North Jetty.
The work includes mobilization and demobilization, the furnishment and delivery of stones, removal/rehandling/resetting of existing stones, and placement of new bedding, underlayer and armor stone for tie-in between the new and the existing structure. Anticipated stone required to construct the spur jetty and reinforce the existing north jetty includes approximately 9,500 square yards of 2-ft thick, stone-filled marine mattress; 13,000 tons of underlayer stone; and 38,000 tons of 8-12 ton armor stone (36,000 tons for the spur and 2,000 for the existing jetty reinforcement.) The reinforcement work will require substantial moving and rehandling of existing stones to obtain the required interlocking placement and construction tolerances.
Construction, stone delivery, and access will be by water. Access to the breakwater by land is unavailable and no work should be completed from the crest of the breakwater. Environmental coordination and permitting is being completed by the U.S. Army of Engineers, New England District. Low tide water depths in the vicinity of the structure are approximately 10 feet, and the average tidal range is approximately 9 feet. The area is located 1500’ off the shoreline and subject to wave action. No spudding or anchoring into the existing structure is permitted.
Please note that this solicitation is unrestricted. This is not an invitation for bids at this time. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about mid-October 2025. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the System of Award website (www.sam.gov). In order to download the solicitation, offerors must access the Procurement Integrated Enterprise Environment (https://piee.eb.mil/). All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at brian.t.mannion@usace.army.mil
- KO CONTRACTING DIVISION 696 VIRGINIA ROAD
- CONCORD , MA 01742-2751
- USA
- BRIAN MANNION
- brian.t.mannion@usace.army.mil
- Phone Number 9783188478
- Sep 05, 2025 11:11 am EDTPresolicitation (Original)
Related Document
| Oct 17, 2025 | [Solicitation (Original)] Construction of a Spur Jetty at Camp Ellis Beach in Saco, Maine |
| Oct 29, 2025 | [Solicitation (Updated)] Construction of a Spur Jetty at Camp Ellis Beach in Saco, Maine |
| Dec 3, 2025 | [Solicitation (Updated)] Construction of a Spur Jetty at Camp Ellis Beach in Saco, Maine |
| Jan 22, 2026 | [Award Notice (Original)] Construction of a Spur Jetty at Camp Ellis Beach in Saco, Maine |
See Also
Follow Maine Air National Guard Fuel Cell Hangar (FCH), Project No. FKNN159044 Active
DEPT OF DEFENSE
RFP #27013 Construction Manager at Risk Merrill Auditorium Ceiling Restoration Project (PDF, 168.66
City of Portland
Due by 10/07/2026
Follow Maintenance Dredging of Isle Au Haut Thoroughfare, Isle Au Haut, Maine Active
DEPT OF DEFENSE
Follow Acadia National Park Active Contract Opportunity Notice ID 693C73-27-B-000002 Related Notice Department/Ind.
TRANSPORTATION, DEPARTMENT OF
Due by 11/10/2026