Construction Management for Holly Street Bridge Seismic Retrofit & Rehabilitation Project (HBP)

Agency: City of Pasadena
State: California
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237310 - Highway, Street, and Bridge Construction
  • 237990 - Other Heavy and Civil Engineering Construction
  • 541330 - Engineering Services
Posted Date: Oct 8, 2026
Due Date: Oct 29, 2026
Solicitation No: 2026-RFP-0213
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description


Project ID: 2026-RFP-0213

Title: Construction Management for Holly Street Bridge Seismic Retrofit & Rehabilitation Project (HBP)

Addenda: 0

Release Date: 10/8/2026

Due Date: 10/29/2026

Follow
Construction Management for Holly Street Bridge Seismic Retrofit & Rehabilitation Project (HBP)
Request for Proposals
Public Works Department, Engineering
237 , 2379 , 23799 , 237990 , 5413 ... show all
Project ID: 2026-RFP-0213
Release Date: Thursday, October 8, 2026
ยท Due Date: Thursday, October 29, 2026 2:00pm
Posted Thursday, October 8, 2026 8:00am
All dates & times in Pacific Time - Los Angeles
Draft Response No Bid
Time Remaining: 20 days, 19 hours, 0 minutes


Post Information

Posted At:Thu, Oct 8, 2026 8:00 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary
The City of Pasadena is seeking a qualified consultant to provide construction management including on-site inspection services, and construction materials testing for the Holly Street Bridge Seismic Retrofit and Rehabilitation Project. This project is federally funded through the Highway Bridge Program (HBP) administered by California Department of Transportation (Caltrans). Services to be provided shall adhere to the federal requirements. The selected Consultant will be required to oversee and manage all construction activities related to the project, supporting the day-to-day operations of City staff.


Background
The Holly Street Bridge spans the Arroyo Seco Flood Control Channel, the Arroyo Seco Trail, and North Arroyo Boulevard. The structure is located southeast of the intersection of Linda Vista Avenue and Holly Street. Constructed in 1925, the concrete arch-deck bridge measures approximately 45 feet in width and 400 feet in length. It accommodates two vehicular travel lanes, one in each direction, as well as sidewalks on each side with no physical barrier between pedestrian and vehicular traffic.

According to the 2024 Los Angeles County Bridge Inspection Report, the structure has a sufficiency rating of 32.6 and is classified as structurally deficient, indicating that rehabilitation is required. The primary design components to be implemented as part of the seismic retrofit and rehabilitation project include but are not limited to the following:

  • polyester concrete overlay deck treatment
  • spalled concrete repair
  • rehabilitation of bridge girders with exposed rebars
  • in-kind replacement of spandrel columns with carbon fiber wrapped polymer
  • Americans with Disability Act (ADA) improvements at the intersection of Linda Vista Avenue and Holly Street intersection
The project is federally funded by Federal Highway Administration (FHWA) through the Highway Bridge Program (HBP) and administered by the California Department of Transportation (Caltrans). The Contractor is required to comply with all applicable federal, state, and local laws, regulations, and requirements associated with federally funded projects.
Project must be complete prior to 2028 Summer Olympics.


Timeline

Release Project Date:
October 8, 2026
Question Submission Deadline:
October 15, 2026, 2:00pm
Proposal Submission Deadline:
October 29, 2026, 2:00pm
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Follow 605-341 - Relocate Dialysis Minor Construct - Loma Linda, CA Active Contract

VETERANS AFFAIRS, DEPARTMENT OF

Due by 10/27/2026

Bid No. 008-26/27 - Asphalt Improvement Project at Multiple Sites Notice Inviting Proposal

Glendale Unified School District

Due by 11/17/2026

Johnson Yard Improvement Project Environmental Permitting- Request for Qualifications [Due 10/23] RFQ -

San Lorenzo Valley Water District

Due by 10/23/2026

Project ID: C26031F - PreQual Title: Pre-Qualification: US 101 Express Lanes Phase 5

Santa Clara Valley Transportation Authority

Due by 10/29/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.