| Agency: | City of Port Angeles |
|---|---|
| State: | Washington |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jun 3, 2026 |
| Due Date: | Jun 25, 2026 |
| Solicitation No: | CON-2025-50 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Bid Number: |
CON-2025-50
|
| Bid Title: |
Construction 24HR Restroom
|
| Category: | Public Works |
| Status: | Open |
|
| SMALL WORKS ROSTER |
|---|
City of Port Angeles
Public Works & Utilities Dept.
Engineering Office
321 E. Fifth Street SMALL WORKS ROSTER
Port Angeles WA 98362
Tel: 360-417-4541
F ax: 360-417-4709 Request for Bid
Contract
Contract Title: CONSTRUCTION 24HR RESTROOM Project Number: CON-2025-50
THIS CONTRACT is entered into the date last written below between the CITY OF PORT ANGELES, WASHINGTON
("City") AND ________________, licensed to do business in Washington State ("Contractor").
Project Estimate Range: $39,543.28 - $58,179.83
1. WORK BY CONTRACTOR
The Contractor shall perform the work as described in Attachment A (Attachment A includes Contractor's
Proposal, Scope of Work, Statement of Work, Plans, Specifications, and any other related Contract Documents)
that is attached hereto and by this reference is incorporated herein.
2. TERM OF CONTRACT
All work under this Contract is to be completed as indicated (check one):
All work under this Contract is to be completed by this date: .
All work under this Contract is to be completed 20 days from the Notice to Proceed. No work is
to be performed prior to written Notice to Proceed by the City. (See attachment A for specific
schedule for work).
All work under this contract is to be completed 15 working days from Notice to Proceed. No work
is to be performed prior to a written Notice to Proceed by the City. ( see attachment "A" for
Specific schedule of work)
3. PAYMENT
A. The City shall pay the Contractor for the work performed under this contract (check one):
Force Account - Time and material, not to exceed: $
Force Account - Time and actual expenses incurred, not to exceed: $
Unit prices set forth in the Contractor's bid or quote in Attachment E, not to exceed: $________
Firm Fixed Price set forth in Contractor bid or quote in the amount of: $
The Contractor shall do all work and furnish all tools, materials, and equipment, in accordance
with and as described in Attachment "A".
The Contractor shall provide and bear the expense of all equipment, work, and labor of any sort
whatsoever that may be required for the transfer of materials and for constructing and completing
the work provided for in this contract and every part thereof; except those indicated to be furnished by the City
of Port Angeles in Attachment A.
B. The Contractor shall maintain time and expense records that may be requested by the City. The Contractor
shall submit invoices to the City for payment for work performed. All invoices must reference the City's contract
number. Invoices shall be in a format acceptable to the City.
C. The City shall pay all invoices for non-contested work (See E below) from the Contractor within 30 days of
receipt of a properly completed invoice.
CON-2025-50 Page 1 [TEMPLATE REVISED 5/22/2025]
D. All records and accounts pertaining to this Contract are to be kept available for inspections by representatives
of the City for a period of three (3) years after final payment. Copies shall be made available to the City upon
request.
E. If during the course of the Contract, the work rendered does not meet the requirements set forth in the
Contract, the Contractor shall correct or modify the required work to comply with the requirements of this
Contract. The City shall have the right to withhold payment for such work until it meets the requirements of the
Contract Documents.
4. RESPONSIBILITY OF CONTRACTOR
A. Safety. Contractor shall take all necessary precautions for the safety of employees on the work site and shall
comply with all applicable provisions of federal, state, and local regulations, ordinances, and codes. Contractor
shall erect and properly maintain, at all times, as required by the conditions and progress of the work, all
necessary safeguards for the protection of workers and the public and shall post danger signs warning against
known or unusual hazards.
B. Warranty. Contractor shall be responsible for correcting all defects in workmanship and/or materials discovered
within one year after acceptance of this work. After correcting defect, Contractor shall be responsible for
correcting all defects in workmanship and/or materials in the corrected work for one year after the City accepts
the corrections. The Contractor shall start work to remedy such defects within seven (7) days of mailing notice of
discovery thereof by City and shall complete such work within a reasonable time. In emergencies where damage
may result from delay or where loss of service may result, such corrections may be made by the City, in which
case the cost shall be borne by the Contractor. In the event the Contractor does not accomplish corrections at the
time specified, the work will be otherwise accomplished and the cost of same shall be paid by the Contractor.
C. Damages. Contractor shall be liable for any costs, losses, expenses, or damages including consequential
damages suffered by the City resulting from defects in the Contractors work including, but not limited to, cost of
materials and labor expended by the City in making emergency repairs and cost of engineering, inspection, and
supervision by the City. The Contractor shall indemnify and hold the City harmless from any and all claims that
may be made against the City as a result of any defective work and the Contractor shall defend any such claims
at its own expense. When materials or procedures are not specified in the Contract Document, the City will rely
on the professional judgment of the Contractor to make appropriate selections.
D. Nondiscrimination/Affirmative Action. Contractor agrees not to discriminate against any employee or applicant
for employment or any other persons in the performance of this Contract because of race, creed, color, national
origin, marital status, sex, age, sexual orientation, genetic information, or handicap, or other circumstances as
may be defined by federal, state or local law or ordinance, except for a bona fide occupational qualification.
Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices
to be provided by Contractor setting forth the provisions of the nondiscrimination clause.
E. Employment. Any and all employees of the Contractor, while engaged in the performance of any work or
services required by the Contractor under this Contract, shall be considered employees of the Contractor only and
not of the City. Any and all claims that may arise under the Workers Compensation Act on behalf of those
employees, while so engaged, and all claims made by a third party as consequence of any negligent act or
omission on the part of the Contractor's employees, while so engaged on any of the work or services provided or
rendered herein, shall not be the obligation of the City.
5. COMPLIANCE WITH LAWS
The Contractor shall comply with all federal, state and local laws and regulations applicable to the
work done under this Contract. Any violation of the provisions of this paragraph shall be considered a violation of
a material provision of this Contract and shall be grounds for cancellation, termination or suspension of the
Contract by the City, in whole or in part, and may result in ineligibility for further work for the City.
6. ACTS AND REGULATIONS
1. Compliance with Regulations: The Contractor (hereinafter includes consultants) will comply with the Acts
and the Regulations relative to Non-discrimination in Federally-assisted programs of the U.S. Department of
CON-2025-50 Page 2 [TEMPLATE REVISED 5/22/2025]
Transportation, Washington State Department of Transportation, as they may be amended from time to time,
which are herein incorporated by reference and made a part of this contract.
2. Non-discrimination: The Contractor, with regard to the work performed by it during the contract, will not
discriminate on the grounds of race, color, or national origin in the selection and retention of subcontractors,
including procurements of materials and leases of equipment. The Contractor will not participate directly or
indirectly in the discrimination prohibited by the Acts and the Regulations, including employment practices when
the contract covers any activity, project, or program set forth in Appendix B of 49 CFR Part 21.
3. Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In all
solicitations, either by competitive bidding, or negotiation made by the Contractor for work to be performed
under a subcontract, including procurements of materials, or leases of equipment, each potential subcontractor or
supplier will be notified by the Contractor of the Contractor's obligations under this contract and the Acts and the
Regulations relative to Non-discrimination on the grounds of race, color, or national origin.
4. Information and Reports: The Contractor will provide all information and reports required by the Acts, the
Regulations, and directives issued pursuant thereto and will permit access to its books, records, accounts, other
sources of information, and its facilities as may be determined by the City or the Washington State Department of
Transportation to be pertinent to ascertain compliance with such Acts, Regulations, and instructions. Where any
information required of a Contractor is in the exclusive possession of another who fails or refuses to furnish the
information, the Contractor will so certify to the City or the Washington State Department of Transportation, as
appropriate, and will set forth what efforts it has made to obtain the information.
5. Sanctions for Noncompliance: In the event of a Contractor's noncompliance with the Nondiscrimination
provisions of this contract, the City will impose such contract sanctions as it or the Washington State Department
of Transportation may determine to be appropriate, including, but not limited to:
a. withholding payments to the Contractor under the contract until the Contractor complies; and/or
b. cancelling, terminating, or suspending a contract, in whole or in part.
6. Incorporation of Provisions: The Contractor will include the provisions of paragraphs one through six in
every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts, the
Regulations and directives issued pursuant thereto. The Contractor will take action with respect to any
subcontract or procurement as the City or the Washington State Department of Transportation may direct as a
means of enforcing such provisions including sanctions for noncompliance. Provided, that if the Contractor
becomes involved in, or is threatened with litigation by a subcontractor, or supplier because of such direction, the
Contractor may request the City to enter into any litigation to protect the interests of the City. In addition, the
Contractor may request the United States to enter into the litigation to protect the interests of the United States.
Pertinent Non-Discrimination Authorities:
* Title VI of the Civil Rights Act of 1964 (42 U.S.C. 2000d et seq., 78 stat. 252), (prohibits discrimination on
the basis of race, color, national origin); and 49 CFR Part 21.
* The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. 4601),
(prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or
Federal-aid programs and projects);
* Federal-Aid Highway Act of 1973, (23 U.S.C. 324 et seq.), (prohibits discrimination on the basis of sex);
* Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. 794 et seq.), as amended, (prohibits discrimination
on the basis of disability); and 49 CFR Part 27;
* The Age Discrimination Act of 1975, as amended, (42 U.S.C. 6101 et seq.), (prohibits discrimination on the
basis of age);
* Airport and Airway Improvement Act of 1982, (49 USC 471, Section 47123), as amended, (prohibits
discrimination based on race, creed, color, national origin, or sex);
CON-2025-50 Page 3 [TEMPLATE REVISED 5/22/2025]
* The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and applicability of
Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation
Act of 1973, by expanding the definition of the terms "programs or activities" to include all of the programs or
activities of the Federal-aid recipients, sub-recipients and contractors, whether such programs or activities are
Federally funded or not);
* Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on the basis of disability in
the operation of public entities, public and private transportation systems, places of public accommodation, and
certain testing entities (42 U.S.C. 12131-12189) as implemented by Department of Transportation
regulations at 49 C.F.R. parts 37 and 38;
* The Federal Aviation Administration's Non-discrimination statute (49 U.S.C. 47123) (prohibits discrimination
on the basis of race, color, national origin, and sex);
* Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-
Income Populations, which ensures Non-discrimination against minority populations by discouraging programs,
policies, and activities with disproportionately high and adverse human health or environmental effects on
minority and low-income populations;
* Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and
resulting agency guidance, national origin discrimination includes discrimination because of Limited English
proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP
persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 74100);
* Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because
of sex in education programs or activities (20 U.S.C. 1681 et seq).
7. TERMINATION OF CONTRACT
A. This Contract shall terminate upon satisfactory completion of the work described in Attachment A and final
payment by the City.
B. The City may terminate the Contract and take possession of the premises and all materials thereon and finish
the work by whatever methods it may deem expedient, by giving 10 days written notice to the Contractor, upon
the occurrence of any one or more of the events hereafter specified:
1. The Contractor makes a general assignment for the benefit of its creditors.
2. A receiver is appointed as a result of the insolvency of the Contractor.
3. The Contractor persistently or repeatedly refuses or fails to complete the work required herein.
4. Contractor fails to make prompt payment to subcontractors for material or labor.
5. Contractor disregards federal, state or local regulations and ordinances.
6. Contractor disregards instructions of the Contract Administrator, or otherwise substantially violates
the terms of this Contract.
7. The City determines that sufficient operating funds are not available to fund completion of the work
contracted for.
8. The Director of the Public Works and Utilities Department or his/her designee determines that such
termination is in the best interest of the City.
C. In the event this Contract is terminated by the City, Contractor shall not be entitled to receive any further
amounts due under this Contract until the work specified in Attachment "A" is satisfactorily completed, as
scheduled, up to the date of termination. At such time, if the unpaid balance of the amount to be paid under this
Contract for the satisfactorily completed work exceeds the expense incurred by the City in finishing the work, and
all damages sustained by the City or which may be sustained by reason of such refusal, neglect, failure or
discontinuance of employment, such excess shall be paid by the City to the Contractor. If the City's expense and
damages exceed the unpaid balance for the work Contractor and its surety shall be jointly and severally liable
therefore to the City and shall pay such difference to the City. Such expense and damages shall include all legal
CON-2025-50 Page 4 [TEMPLATE REVISED 5/22/2025]
costs incurred by the City to protect the rights and interests of the City under the Contract, provided such legal
costs shall be reasonable.
8. OWNERSHIP OF DOCUMENTS
A. On payment to the Contractor by the City of all compensation due under this Contract, all finished or
unfinished documents and material prepared by the Contractor with funds paid by the City under this Contract
shall become the property of the City and shall be forwarded to the City upon its request.
B. Any records, reports, information, data, or other documents or materials given to or prepared or assembled by
the Contractor under this Contract will be kept confidential and shall not be made available to any individual or
organization by the Contractor without prior written approval of the City or by court order.
9. CLAIMS
Any claim against the City for damages, expenses, costs, or extras arising out of the performance of this Contract
must be made in writing to the City within thirty days after the discovery of such damage, expense or loss, and in
no event later than the time of approval by the City for final payment. Contractor, upon making application for
final payment, shall be deemed to have waived its right to claim for any other damages for which application has
not been made, unless such claim for final payment includes notice of additional claim and fully describes such
claim.
10. GENERAL ADMINISTRATION AND MANAGEMENT
The Director of the Public Works and Utilities Department or his/her designee shall have primary responsibility for
the City under this Contract and shall oversee and approve all work to be performed, coordinate communications,
and review and approve all invoices, under this Contract.
The City reserves the right to utilize an online cloud-based project management system, Virtual Project Manager
(VPM), to allow for paperless documentation and project administration.
11. INDEMNIFICATION / HOLD HARMLESS
A. The Contractor shall defend, indemnify, and hold the City, its officers, officials, employees and volunteers
harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in
connection with the performance of this Contract, except for injuries and damages caused by the sole negligence
of the City.
B. However, should a court of competent jurisdiction determine that this Contract is subject to RCW 4.24.115,
then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused
by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees,
and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. It is
further specifically and expressly understood that the indemnification provided herein constitutes the Contractor's
waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This
waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or
termination of this Contract.
12. INSURANCE, BONDS, & RETAINAGE
A. The Contractor shall maintain insurance as set forth in Attachment B.
B. If the total bid amount including tax exceeds $35,000, this project will be awarded as a small works roster
contract and payment and performance bonds will be required in accordance with Washington State law. A
retainage of 5% will also be applicable to this contract. The Contractor shall obtain payment and performance
bonds in accordance with this Contract and all Attachments incorporated herein. Copies of the Bid Security
Transmittal Form, Performance Bond and Payment Bond form(s), and Escrow Agreement for Retained Percentage
form are available from the Operations Office of Public Works & Utilities (Telephone 360-417-4541). Performance
Bond and Payment Bond forms are provided in Attachment C. The party to whom the Contract is awarded will be
required to execute the Contract and obtain the Performance and Payment Bond within ten (10) calendar days
from the date the notice of award is delivered to the bidder. Such bonds shall be on the form provided by the
CON-2025-50 Page 5 [TEMPLATE REVISED 5/22/2025]
City, specify the name, contact phone, and address of the surety, and shall include a power of attorney
appointing the signatory of the bonds as the person authorized to execute it (them).
13. PREVAILING WAGE
This Contract is subject to Chapters 39.12 and 49.28 RCW, amendments thereto and regulations issued
thereunder, relating to prevailing wages, benefits and other requirements. Workers shall receive no less than the
prevailing rate of wage. The City shall verify that contractor has received, or is exempt from, training on the
requirements related to public works and prevailing wage under RCW 39.12. Contractor shall verify first-tier
subcontractors have also received, or are exempt from, such training. Each subsequent tier shall verify that the
tier below has received, or is exempt from, such training. No claim for additional compensation will be allowed
which is based upon a lack of knowledge or a misunderstanding of any such requirements by the Contractor or a
failure to include in Contractor's price adequate increases in such wages during the performance of this Contract.
The Contractor is advised to consult the Washington State Department of Labor and Industries to determine the
prevailing wages that must be paid.
This public works project is being done in Clallam County. Washington State wage determinations for Clallam
County Journeymen, Apprentices, and Description can be found at:
Journey Level Rates: https://secure.lni.wa.gov/wagelookup/
Apprentice Rates: https://secure.lni.wa.gov/wagelookup/ApprenticeWageLookup.aspx
Description of Classifications: https://lni.wa.gov/licensing-permits/public-works-projects/scopes-of-work
Use the applicable wage determinations effective on the bid due date.
A copy of the applicable wage rates is available for viewing at the Port Angeles Public Works and Utilities
Contracts Office. In addition, the City will mail a hard copy of the applicable wage rates upon request.
For a contract award under $2,500, and in accordance with RCW 39.12.040(2), the Contractor or subcontractor is
authorized to submit a combined Statement of Intent to Pay Prevailing Wages & Affidavit of Wages directly to the
City of Port Angeles at final invoicing. Submission shall be made on the form developed by the Washington State
Department of Labor and Industries and available from the City of Port Angeles Public Works and Utilities
Department.
Should any dispute arises as to the prevailing rates of wages for a specific trade, craft or occupation and such
dispute cannot be adjusted by the parties in interest, including labor and management representatives, the
matter shall be referred for arbitration to the Director of the Department of Labor and Industries, and his decision
shall be final, conclusive, and binding on all parties involved in the dispute.
14. INTERPRETATION AND VENUE
This Contract shall be interpreted and construed in accordance with the laws of the State of Washington. The
venue of any litigation between the parties regarding this Contract shall be Clallam County, Washington.
15. BRANDS OR EQUAL
When a special "brand or equal" is named it shall be construed solely for the purpose of indicating the standards
of quality, performance, or use desired. Brands of equal quality, performance, and use shall be considered,
provided Contractor specifies the brand and model and submits descriptive literature when available. Any bid
containing a brand which is not of equal quality, performance, or use specified must be represented as an
alternate and not as an equal, and failure to do so shall be sufficient reason to disregard the bid.
16. INSPECTION AND REJECTION
All goods, services, work, or materials purchased herein are subject to inspection and to approval by the City. Any
rejection of goods, services, work, or materials resulting because of nonconformity to the terms and specifications
of this order, whether held by the City or returned, will be at Contractor's risk and expense.
17. SUBLETTING OR ASSIGNING OF CONTRACTS
CON-2025-50 Page 6 [TEMPLATE REVISED 5/22/2025]
Neither the City nor the Contractor shall assign, transfer, or encumber any rights, duties or interest accruing from
this Contract without the express prior written consent of the other.
18. INDEPENDENT CONTRACTOR
The Contractor is and shall be at all times during the term of this Contract an independent contractor and not
an employee of the City.
19. EXTENT OF CONTRACT/MODIFICATION
This Contract, together with the attachments and/or addenda, represents the entire and integrated Contract
between the parties hereto and supersedes all prior negotiations, representations, or agreements, either written
or oral. This contract may be amended, modified, or added to only by written instrument properly signed by both
parties hereto.
20. SUBCONTRACTOR RESPONSIBILITY
The Contractor shall include the language of this section in each of its first tier subcontracts and shall require each
of its subcontractors to include substantially the same language of this section in each of their subcontracts,
adjusting only as necessary the terms used for the contracting parties. The requirements of this section apply to
all subcontractors regardless of tier.
At the time of subcontract execution, the Contractor shall verify that each of its first-tier subcontractors meet the
following bidder responsibility criteria:
- At the time of subcontract bid submittal, have a certificate of registration in compliance with chapter 18.27
RCW;
- Have a current state unified business identifier number;
- If applicable, have:
1) Industrial insurance coverage for the subcontractor's employees working in Washington as required in
Title 51 RCW;
2) Subcontractor's Insurance as required by Attachment B, "Insurance";
3) An employment security department number as required in Tile 50 RCW; and
4) A state excise tax registration number as required in Tile 82 RCW;
5) An electrical contractor license, if required by Chapter 19.28 RCW;
6) An elevator contract license, if required by Chapter 70.87 RCW.
- Not be disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3).
- Have received, or be exempt from, training on the requirements related to public works and prevailing wage
under RCW 39.12.
21. COMPENSATION AND METHOD OF PAYMENT.
A. The City shall pay the Contractor for work performed under this Contract as detailed in the bid, as incorporated
in the Contract.
B. Payments for work provided hereunder shall be made following the performance of such work, unless otherwise
permitted by law and approved in writing by the City. No payment shall be made for any work rendered by the
Contractor except as identified and set forth in this Contract.
C. Progress payments shall be based on the timely submittal by the Contractor using the City's Virtual Project
Manager.
CON-2025-50 Page 7 [TEMPLATE REVISED 5/22/2025]
D. Payments for any alterations in or additions to the work provided under this Contract shall be in accordance with
the Request for Information (RFI) or Construction Change Order (CCO) process as set forth in the Virtual Project
Manager Documents. Following approval of the RFI or CCO, the Contractor shall submit the payment request
through Virtual Project Manager.
E. The Contractor shall submit payment requests through Virtual Project Manager with a completed Application for
Payment form, an example of which is included in Attachment D to this Contract. This form includes a lien waiver
certification and shall be notarized before submission. Applications for payment not signed or notarized shall be
considered incomplete and ineligible for payment consideration. The City shall initiate authorization for payment
after receipt of a satisfactorily completed payment request form and shall make payment to the Contractor within
approximately thirty (30) days thereafter. Final payment requests shall also include a Certification of Work
Completion and Acceptance (located in Attachment D).
IN WITNESS WHEREOF, the parties have executed this Contract as of the date of the last signature affixed
below.
CONTRACTOR CITY OF PORT ANGELES
By: By: ___________________________________
Printed Name: Printed Name: __________________________
Title: Title: __________________________________
Date: Date: _________________________________
APPROVED AS TO FORM:
BY: __________________________________
CITY ATTORNEY
ATTEST:
BY: ___________________________________
CITY CLERK
CON-2025-50 Page 8 [TEMPLATE REVISED 5/22/2025]
City of Port Angeles
ATTACHMENT "A"
Engineering Office
WORK BY CONTRACTOR
Public Works and Utilities Department
The Contractor shall provide all tools, materials, and equipment in order to install the foundation slab, utilities,
and the means to install the Portland Loo as described below.
General Scope: Install utilities, and the foundation slab per Portland Loo's plans. Also, place concrete sidewalks
per drawings. Unload, Move and install (1) Portland Loo(TM) from the staging area at Erickson Playfield 302 South
Race Street , Port Angeles WA, 98362 to the construction site.
Location: Erickson Playfield 302 South Race Port Angeles, WA 98363
Site Point of Contact: David Wegener at 360- 809-8469.
Work Hours and Schedule: The Contractor will be allowed to work from 7:00 AM to 5:00 PM, Monday through
Friday. Work outside of these hours may be requested from and is at the discretion of the City's Project Manager.
Specifications:
All work shall be executed in strict accordance with the latest edition of the following standards and codes
and all local ordinances and regulations and shall meet industry standards.
1. International Building Code (IBC)
2. International Residential Code (IRC)
3. Uniform Plumbing Code (UPC)
4. International Fuel and Gas Code (IFGC)
5. International Mechanical Code (IMC)
6. Washington State Energy Code (WSEC)
7. Washington State Ventilation and Indoor Air Quality Code (VIAQ)
8. ANSI 117 (Ada Accessibility Code)
9. International Fire Code (IFC)
10. National Electrical Code (NEC)
11. Underwriters Laboratories (UL)
12. City of Port Angeles Urban Service Standards & Guidelines (current edition)
13. WSDOT Standard Specifications (current edition)
Permits: City Of Port Angeles Building Permit
Work Requirements:
1.0 Project Description
The following work requirements will be completed in accordance with the Contractor's means and methods. The
tasks outlined in this scope are not intended to be all-encompassing or dictate a particular order of work. The
Contractor shall perform all work in coordination with the necessary parties, including City Staff and the Portland
Loo supplier, to ensure the successful installation of a fully functional restroom.
The work shall be conducted with the objective of minimizing disruption to the Erickson Playfield, and the Contractor
shall take all necessary measures to complete the installation efficiently and in accordance with the required
standards.
1. Contractor to coordinate with and protect surrounding utilities. Call Before You Dig - 811.
2. Construction sequencing and scheduling:
o The Contractor will coordinate with City Staff to schedule installation timing and sequencing.
CON-2025-50 Page 9 [TEMPLATE REVISED 5/22/2025]
o The objective is to minimize the disturbance to the existing restroom during the installation of the
new restroom.
3. Site Mobilization:
o Mobilize necessary equipment and labor to the job site.
o Coordinate location of a laydown area with the City in advance for staging, equipment and
materials. Contractor solely responsible for laydown area and shall restore area back to existing
prior to project completion.
o Secure the work zone with fencing and barricades to protect public safety.
4. Excavation for the Portland Loo Slab/foundation Installation:
o Excavate the area for the proposed Slab/Foundation as indicated in the attached drawings.
o Excavated materials shall be hauled and disposed of offsite at contractor's expense.
o The Slabe/Foundation elevation should match the sidewalk elevation at the south end of the
sidewalk (see note on plans).
o The Slab/Foundation should be installed with zero slope to accept the Porland Loo.
5. Install Utilities into the Portland Loo Slab/Foundation as per the Site Plan and the Portland Loo Supplied
Plans.
o The City's Electrical Department will install the electrical work for this project excluding the
trenching, compaction, and backfill from the Slab/Foundation to the south door of the existing
Erickson Park restroom. The contractor will perform the conduit trenching as part of their bid.
o Contractor shall give the City Electrician a minimum of 10 days advance notice of when the trench
will be ready for conduit install.
6. Foundation Slab Excavation:
o Excavate the foundation slab to 24" depth for 18" slab and 6" CSBC.
o Pothole prior to excavation to expose and document any utilities uncovered.
o Contractor is responsible to repair all damage the contractor generates.
7. Backfill & Compaction:
o Backfill the excavation with 6" Crushed Surfacing Base Course (CSBC) under slab, per Washington
State Department of Transportation (WSDOT) Standard Specification (Std. Spec.) 9-03.9(3) and
compact to 95% density.
8. Foundation Lab:
o Install formwork for slab.
o Install utilities at slab.
o Place back fill, #6 re-bar and 400PSI concrete for slab.
9. Portland Loo Installation Unloading, Loading and Installation:
o Coordinate the delivery of the Portland Loo with the Project Manager
o Unload the Portland Loo from the delivery vehicle and place at the City's staging area noted on
plans.
o Load the Portland Loo and move to finished foundation slab
o Install the Portland Loo to the Slab/Foundation as per The Portland Loo Supplied Plans.
10. Site Restoration:
o Clearing and grubbing shall be incidental to other bid items included in the bid tab and shall be
performed in accordance with the Contract Plans and WSDOT Standard Specifications.
o The Contractor shall restore the site to its pre-construction condition. Site restoration shall be
incidental to bid items included in the bid tab and shall be performed in accordance with the
Contract Plans and WSDOT Standard Specifications.
o Grade the finished project area and prepare for final site stabilization, lawn areas shall be free of
rocks larger than 3".
o Amend all disturbed soils with 6" to 8" of topsoil per BMP T5.13: Post-Construction Soil Quality
and Depth and add seed mix found on plans.
CON-2025-50 Page 10 [TEMPLATE REVISED 5/22/2025]
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Bid Number: 26013 Bid Title: Davies Beach Decking Replacement Category: Construction Projects Status:
City of Lake Stevens
Bid Due: 7/30/2026
Follow TDA Auxiliary Water Supply (AWS) Backup Debris Management Active Contract Opportunity Notice
DEPT OF DEFENSE
Bid Due: 7/30/2026
Follow Mud Mountain Dam Bridge Pier Repair Active Contract Opportunity Notice ID W912DW26RA018
DEPT OF DEFENSE
Bid Due: 7/31/2026
Follow Repair Building 2008 Active Contract Opportunity Notice ID W912DW27RA010 Related Notice Department/Ind.
DEPT OF DEFENSE
Bid Due: 8/05/2026