Concrete Work for Crossings at 345
| Agency: | State Government of Connecticut |
|---|---|
| State: | Connecticut |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jul 18, 2025 |
| Due Date: | Aug 1, 2025 |
| Solicitation No: | 26-01 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
The project site is currently (2) lots, with addresses 333-341 Main Street and 351-353 Main Street in Norwich, CT. As part of this project both lots will be combined into a single lot. The site was previously occupied by a YMCA and included several different buildings. As part of the initial abatement/demolition phase of this project, portions of most buildings (interior and exterior) have been removed. (4) buildings currently remain, know as Buildings A, B, C and D. The current project is a core & shell project prepping for future tenants. Buildings A, & B, are being brought to roughly a “warm blank box” ready for tenant fitouts in the future. Building C will be built out completely with a total of (8) residential units on Levels 2 & 3 (4 each level), with parking below on the lowest level. Building D is to have minimal scope to provide a dry shell with ventilation. Scope includes a new roof, patching of walls/roofs, etc… as required and newexterior paint.
Robert Castronova 100 Broadway Room 105 Norwich CT, 06360 United States Tel: 860-823-3770 Fax: rcastronova@cityofnorwich.org
See Also
BI-JA-496-CMR - Notice of CMR Invitation to Bid - 1 Notice of CMR
State Government of Connecticut
Due by 10/23/2026
Norwalk Fire Station 4 Renovation and Addition-Trade Bids ReBid The work consists of
State Government of Connecticut
Due by 9/23/2026
Removal/Replacement of Sidewalk at Long hill Ave- Phase 2 City of Shelton is
State Government of Connecticut
Due by 9/25/2026
REHABILITATION OF A 0.41 MILE SECTION OF HUNTERS ROAD AND CULVERTS REPLACEMENT The
State Government of Connecticut
Due by 11/27/2026