| Agency: | Rock River Water Reclamation District |
|---|---|
| State: | Illinois |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 26, 2026 |
| Due Date: | Apr 16, 2026 |
| Solicitation No: | 27-402 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
27-402
Concrete Sidewalk Paving Contract FY 2027 (May 1, 2026 – April 30, 2027)
Due Date April 16, 2026 10:15 am Contact Information Department: Engineerings
Four Rivers Sanitation Authority
e
s
Rockford, Illinois o
p
r
u
p
g
n
i
d
Bidding Requirements and Contract Forms
d
for
i
b
r
o
f
d
e
s
Concrete Sidewalk Paving Contract FY 2027
u
e
(May 1, 2026 - April 30, 2027)
b
o
t
t
o
N
Bid Doc. No. 27-402
Four Rivers Sanitation Authority
s
Rockford, Illinois
e
s
o
p
r
Bidding Requirements and Contract Forms
u
and p
General Provisions and Technical Specigfications
n
for Sanitary Sewer Construction
i
d
for
d
i
b
Concrete Sidewalk Paving Contract FY 2027
r
o
(May 1, 2026 - April 30, 2027)
f
d
eBoard of Trustees
s
u
Richard Pollack . . . . . . . . . . . . . . . . . . President
Ben B ernsten . . . . . . . . . . . . . . . . . . Vice President
e
Richard Mowris . . . . . . . . . . . . . . . . . . Clerk/Treasurer
b
Ginger Haas . . . . . . . . . . . . . . . . . . Trustee
o
Brad Long . . . . . . . . . . . . . . . . . . Trustee
t
t
o
Official
N
Christopher T. Baer, PE . . . . . . . . . . . . . . . . . . Executive Director
Matthew L. Campbell, PE . . . . . . . . . . . . . . . . . . Director of Engineering
Bid Doc. No. 27-402
Table of Contents
I. Bidding Requirements
s
Article 1 Notice to Bidders
e
s
Article 2 Instructions to Bidders
o
1 General
p
2 Legal Requirements
3 General Instructions r
u
Article 3 Detailed Specifications p
1 General
2 Notification, Access and Special Considegrations
3 Permit Requirements n
4 Final Grading and Dust Control
i
5 Aggregate Base Course, Type Bd, Variable Depth
6 Portland Cement Concrete Approach Pavement
d
7 Portland Cement Concrete Sidewalk
i
8 Portland Cement Concrete Sidewalk Steps
b
9 Combination Concrete Curb & Gutter, Ty. M6.18
10 Electronic Recordsr
o
II. Contract Forms f
Proposal d
Fair Employment Practices Affidavit of Compliance
e
Bid Bond
s
Agreement
u
Labor & Material Payment Bond
Performanece Bond
b
III. Standard Detail
o
IV. Gteneral Provisions and Technical Specifications for Sanitary Sewer
tConstruction (separate document incorporated by reference)
o
N
Bid Doc. No. 27-402
s
e
s
o
p
r
u
p
g
n
Section I i
d
d
i
b
r
o
f
Biddidng Requirements
e
s
u
e
b
o
t
t
o
N
Bid Doc. No. 27-402
s
e
s
o
p
r
u
p
g
n
i
d
d
i
b
r
o
f
d
e
s
u
e
b
o
t
t
o
N
Article 2 - Instructions to Bidders
1 General
1.1 Scope and Intent
This section of the Contract Documents provides detailed information and requirements for
s
preparing bids to prospective bidders, bidders' responsibility, the preparation and the
e
submission of bids, basis for awarding the Contract and other general information concerned
s
with bidding and executing the Contract.
o
1.2 Contradictions p
If in the case of apparent contradictions between or among the Contractr Documents, the
Contract Documents shall be consulted in the following order: Adudenda, Agreement,
Supplementary Drawings, Instructions to Bidders, Detailed Specifications, Plans, Four Rivers
p
Sanitation Authority (FRSA) General Provisions and Technical Specifications for Sanitary
Sewer Construction. The language in the first such document in wghich language regarding the
conflict, error or discrepancy occurs shall control. n
i
d
2 Legal Requirements
d
2.1 Illinois Regulations i
b
A. Public Act 100-1177 (820 ILCS 130/) entitled the "Prevailing Wage Act" requires the
Bidder to comply with prevailing wagres in accordance with the Illinois Department of
Labor Standards. The State of Illinoois requires contractors and subcontractors on FRSA
projects to submit certified payrfoll reports via the State's Certified Transcript of Payroll
Portal currently found at: https://labor.illinois.gov/laws-
d
rules/conmed/certifiedtranscriptofpayroll.html. The Bidder is responsible for
e
verifying current information at the State's website.
s
B. Public Act 83-10u30 (30 ILCS 565/) entitled the "Steel Products Procurement Act"
requires that steel products used or supplied in performance of this Contract or
subcontract meust be manufactured or produced in the United States with three
exceptionsb.
The prov isions of this Section shall not apply:
o
1. Wthere the Contract involves an expenditure of less than $500.
2t. Where the executive head of the public agency certifies in writing that
o
a) the specified products are not manufactured or produced in the United States in
N
sufficient quantities to meet the agency's requirements, or
b) obtaining the specified products, manufactured or produced in the United States
would increase the cost of the Contract by more than 10%.
3. When its application is not in the public interest.
C. Public Act 96-929 (30 ILCS 570/) entitled the "Employment of Illinois Workers on
Public Works Act" provides that Illinois residents be employed on Illinois public works
projects, provided there has been a period of excessive unemployment (5%) in the State
Bid Doc. No. 27-402 Instruction to Bidders / Page 1 of 9
Concrete Sidewalk Paving Contract FY 2027
(May 1, 2026 - April 30, 2027)
of Illinois as defined in the Act; and, further, that Illinois workers are available and
capable of performing the particular type work involved.
D. Public Act 101-221 (820 ILCS 96/) entitled the "Workplace Transparency Act"
requires that any party to a contract adopt and promulgate written sexual harassment
policies that include, as a minimum, the following information:
s
e
1. the illegality of sexual harassment
s
2. the definition of sexual harassment under Illinois State law
o
3. a description of sexual harassment, utilizing examples p
4. my (our) organization's internal complaint process including penalrties
u
5. the legal recourse, investigative and complaint process available through the Illinois
Department of Human Rights and the Illinois Human Righpts Commission
6. directions on how to contact the Department and the Cgommission
7. protection against retaliation as provided by Sectionn 6-101 of the Illinois Human
Rights Act
i
d
Upon request, this information must be provided to the Illinois Department of Human
d
Rights and the FRSA.
i
E. With regard to nondiscrimination in em
b
ployment, the Contractor for this project will
be required to comply with the Illinois Fair Employment Practices Commission's Rules
and Regulations. r
o
F. The Contractor for this project must comply with the Occupational Safety and Health
f
Act.
d
G. The Contractor for this project must comply with the Federal Drug-Free Workplace
e
Act.
s
H. Public Act 96-1416 requires the Certification of Clean Construction and Demolition
u
Debris (CCDD) and uncontaminated soil prior to disposal at a CCDD fill site. The
Contractor fore this project must comply with Public Act 96-1416 and be responsible
for the certbifications and any fees associated with the disposal at a CCDD fill site.
1. In the event that contaminated soil is uncovered on the project, the Contractor must
o
notify FRSA immediately. Any extra costs resulting from the presence of
t
contaminated soil must be evaluated in accordance with FRSA General Provisions
t& Technical Specs for Sanitary Sewer Construction; General Conditions: Article 5
o
- Time Provisions and Article 8 - Changes.
N
2.2 Americans with Disabilities Act
The Contractor for this project will comply with all applicable requirements of the Americans
with Disabilities Act of 1990 (ADA). The Contractor will hold harmless and indemnify Four
Rivers Sanitation Authority (FRSA) and their representatives from all:
A. suits, claims, or actions
B. costs, either for defense (including but not limited to reasonable attorney's fees and expert
witness fees) or for settlement
Bid Doc. No. 27-402 Instructions to Bidders / Page 2 of 9
Concrete Sidewalk Paving Contract FY 2027
(May 1, 2026 - April 30, 2027)
C. damages of any kind (including but not limited to actual, punitive, and compensatory
damages)
relating in any way to or arising out of the ADA, to which said firm is exposed or which it
incurs in the execution of the Contract.
s
e
3 General Instructions
s
o
3.1 Bidder's Responsibility
p
Bidders are cautioned not to submit proposals until having carefully examined the entire site
r
of the proposed work and adjacent premises and the various means of approach and access to
u
the site, and having made all necessary investigations to inform themselves thoroughly as to
the facilities for delivering, placing and handling the materials at the spite, and having informed
themselves thoroughly as to all difficulties involved in the completion of all the work under
g
this Contract in accordance with its requirements.
n
Bidders must examine the Plans, Specifications and other Contract Documents and shall
i
exercise their own judgment as to the nature and amount of the whole of the work to be done
d
and for the bid prices must assume all risk of variance, by whomsoever made, in any
d
computation or statement of amount or quantities necessary to complete fully the work in
strict compliance with the Contract Documents. i The Bidder must satisfy himself by making
b
borings or test pits, or by such methods as he may prefer, as to the character and location of the
materials to be encountered or work to be per formed. No pleas of ignorance of conditions that
r
exist or that may hereafter exist, or of conditions or difficulties that may be encountered in the
o
execution of the work under this Contract, as a result of failure to make the necessary
f
examinations and investigations, will be accepted as an excuse for any failure or omission on
d
the part of the Contractor to fulfill, in every detail, all of the requirements of the Contract
Documents, or will be accepteed as a basis for any claims whatsoever for extra compensation or
for an extension of time. s
u
The Contractor is responsible for verifying the location of all existing utilities in the
project areas.
e
The Bidder, thberefore, shall satisfy himself by such means as he may deem proper as to the
location of all structures that may be encountered in construction of the work.
o
3.2 Addenda and Interpretations
t
No int erpretation of the meaning of the Plans, Specifications, or other Contract Documents
t
woill be made to any bidder orally. Every request for such interpretation must be in writing
addressed to Four Rivers Sanitation Authority, 3501 Kishwaukee Street, Rockford, Illinois.
N
To be given consideration, such request must be received at least five (5) days prior to the date
fixed for the opening of bids. Any and all such interpretations and any supplemental
instructions will be in the form of written addenda which, if issued, will be sent by email, fax,
or certified mail with acknowledgement of receipt requested, to all prospective bidders, at the
respective addresses furnished for such purposes, not later than three (3) days prior to the date
fixed for the opening of bids. Failure of any bidder to receive any such addenda or
interpretation shall not relieve said bidder from any obligation under his bid as submitted. All
addenda so issued shall become part of the Contract Documents.
Bid Doc. No. 27-402 Instructions to Bidders / Page 3 of 9
Concrete Sidewalk Paving Contract FY 2027
(May 1, 2026 - April 30, 2027)
3.3 Laws and Regulations
The prospective bidder is warned that he must comply with all laws of the United States
Government, State of Illinois, all ordinances and regulations of FRSA in the performance of
the work under this Contract. The Bidder's attention is specifically called to that provision of
the General Conditions regarding the rate of wage to be paid on the work. s
e
3.4 Quantities Estimated Only
s
Bidders are warned that the estimate of quantities of the various items of work and materials,
o
as set forth in the Proposal form, is approximate only and is given solely to be used as a
p
uniform basis for the comparison of bids. The quantities actually required to complete the
Contract work may be less or more than so estimated, and if awarded a contrract for the work
u
specified, the Contractor further agrees that he will not make any claim for damages or for loss
of profits or for an extension of time because of a difference betwepen the quantities of the
various classes of work assumed for comparison of bids and quantities of work actually
performed. g
n
3.5 Form, Preparation, and Presentation of Proposals
i
For particulars as to the quantity and quality of the sudpplies, materials and equipment to be
furnished, and the nature and extent of the work or labor to be done, prospective bidders are
d
referred to the Contract Documents, which may be examined or obtained at the office of
i
FRSA.
b
Each bid will be submitted upon the prescrib ed Proposal form. All blank spaces for bid prices
r
must be filled in, in ink, with the unit or total sum or both for which the Proposal is made. If
o
the Proposal contains any omissions, erasures, alterations, additions or items not called for in
f
the itemized Proposal, or contains irregularities of any kind, such may constitute sufficient
cause for rejection of bid. In cadse of any discrepancy in the unit price or amount bid for any
item in the Proposal, the unit price as expressed in figures will govern. In no case is the
e
agreement form to be filled out or signed by the bidder.
s
Bidders may opt to countact FRSA's Engineering Department at 815.387.7660 to obtain
an electronic Propos al form. If used, this form must be attached to the hard copy Proposal
e
form and appropriately signed and executed with the bid.
b
The bid must be verified and be presented on the prescribed form in a sealed envelope on or
before theo time and at the place stated in the Advertisement for Bids, endorsed with the name
of the person, firm or corporation presenting it, the date of presentation, and the title of the
t
work for which the bid is made. If forwarded by mail, the sealed envelope containing the
t
Proposal and marked as directed above, must be enclosed in another envelope addressed to
o
Clerk of the Four Rivers Sanitation Authority, 3501 Kishwaukee Street, Rockford, Illinois,
N
61109 and be sent preferably by certified mail. FRSA will not accept facsimile generated bids.
3.6 Bid Security
Each Proposal must be accompanied by the FRSA Bid Bond form with an acceptable Bid
Security attached, in the amount specified in Article One, Notice to Bidders. This sum is a
guarantee that, if the Proposal is accepted, a contract will be entered into and its performance
properly secured. The FRSA's Bid Bond Form included in the bid packet must be used. No
other Bid Bond form may be substituted.
Bid Doc. No. 27-402 Instructions to Bidders / Page 4 of 9
Concrete Sidewalk Paving Contract FY 2027
(May 1, 2026 - April 30, 2027)
Within ten (10) days after the award of the bid, the deposits of all but the three (3) lowest
bidders will be returned. The deposits of the remaining two unsuccessful bidders will be
returned within three (3) days after the execution of the Contract, or, if no such Contract has
been executed, within sixty (60) days after the date of opening bids. The deposit of the
successful bidder will be returned only after he has duly executed the Contract and furnished
s
the required bond and insurance.
e
3.7 Affidavit of Compliance
s
o
Each proposal must be accompanied by an executed Affidavit of Compliance. A separate
Affidavit of Compliance form is enclosed with the Proposal packet. Failurep to submit an
executed Affidavit of Compliance with the Proposal may constitute sufficient cause for
r
rejection of the bid.
u
3.8 Statement of Qualifications p
Each Proposal must be accompanied by a Statement of Qualific ations certifying that the
g
bidder is registered to do business in the State of Illinois, has a permanent business office
n
within forty (40) miles of the FRSA office at 3501 Kishwaukee Street in Rockford, IL, and
provides documentation that the bidder possesses thie appropriate financial, material,
d
equipment, facility and personnel resources and expertise necessary to meet all contractual
obligations. The bidder shall document no less thadn three (3) concrete sidewalk contracts of
similar scope within the past five (5) years having equal or greater value to the bid being
i
submitted. FRSA reserves the right to requesbt additional information, as needed, to evaluate
bids prior to making an award.
r
3.9 Comparison of Proposals o
Bids on item contracts will be compfared on the basis of a total computed price arrived at by
taking the sum of the estimatedd quantities of each item, multiplied by the corresponding unit
prices and including any lump sum bids on individual items, in accordance with the estimate
e
of quantities set forth in the Proposal form. Bids on lump sum contracts will be considered
s
upon the basis of the lowest sum bid.
u
3.10 Acceptance of Bids and Basis of Award
e
The contract will be award, if at all, to the lowest responsive, responsible bidder. No bidder
b
may withdraw his bid after the scheduled closing time for receipt of bids, for at least sixty (60)
days. Fouor Rivers Sanitation Authority also reserves the right to reject any of all bids.
The bidtder whose proposal is accepted will be notified of the Notice of Award issued by FRSA
Exectutive Director. Within ten (10) days of issuance of a Notice of Award by the FRSA
Eoxecutive Director, the successful bidder shall enter into a written contract for the
Nperformance of the Proposal work and shall furnish the required bonds and insurance
certificates upon being served such Notice, personally, by mailing, or via email.
If the bidder does not comply with the Notice of Award, FRSA will issue a Deficiency Notice.
If the bidder to whom the contract is awarded refuses or neglects to execute it or fails to furnish
the required bond and insurance within five (5) days after receipt by him of Deficiency Notice,
the amount of his deposit shall be forfeited and shall be retained by FRSA as liquidated damage
and not as a penalty. It being now agreed that said sum is a fair estimate of the amount of
damages that FRSA will sustain in case said bidder fails to enter into a contract and furnish the
required bond and insurance. No plea of mistake in the bid shall be available to the bidder for
Bid Doc. No. 27-402 Instructions to Bidders / Page 5 of 9
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
ITB #26-054 - 151st Street & Regent Drive Traffic Signal Improvements, Construction Date:
Orland Park village
Bid Due: 8/03/2026
Project: C26FI103338505 - RFQ - Mid-Level Construction Work Order Contracting Services (MID-CON) Ref.
Chicago Transit Authority
Bid Due: 8/13/2026
Bid Title: Wastewater Plant Grit Classifier Replacement Category: Requests For Bids and Proposals
City of Geneva
Bid Due: 8/10/2026
Opens August 11 - Effingham Eiche & Kreke Water Main Replacement - Specifications
Effingham city
Bid Due: 8/11/2026