Concrete Foundation Material (Concrete, Base Course, #4 Rock, Sand)
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Idaho |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Jun 4, 2025 |
| Due Date: | Jun 5, 2025 |
| Solicitation No: | FA489725QC049 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- Updated Published Date: Jun 04, 2025 11:12 am MDT
- Original Published Date: May 28, 2025 09:51 am MDT
- Updated Date Offers Due: Jun 05, 2025 12:00 pm MDT
- Original Date Offers Due: Jun 05, 2025 12:00 pm MDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Jun 20, 2025
- Original Inactive Date: Jun 20, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 5680 - MISCELLANEOUS CONSTRUCTION MATERIALS
-
NAICS Code:
- 238110 - Poured Concrete Foundation and Structure Contractors
-
Place of Performance:
Mountain Home AFB , ID 83648USA
Questions & Answers (Q&A) and soliciation requirement clarifications:
1. For the #4 Rock. This is not for "Crushed Concrete". Any industry standard #4 Rock or " #4 crushed rock", that is a Subbase aggregate material, meeting this minimum specification and the ASTM requirements is acceptable.
2. This requirement requires the delivery of poured/mixed concrete. For clarification, The concrete pump truck is being requested during the concrete placement for the footer and pedestal portion of the project. The primary reason is safety, keeping the concrete truck away from the ledge to prevent cave-in. As well as reduce splattering and shifting of the steel reinforcement as it is a 4’ drop. The work site is relatively open, allowing the truck to move as needed. The building dimensions are approximately 110’ x 50’, maximum expected reach is 150’ depending on the operator’s preference for vehicle movement.
-----------------------------------------------------------
COMBINED SYNOPSIS / SOLICITATION
REQUEST FOR QUOTE (RFQ)
In accordance with FAR PART 12.603(c)(2)(i): This is a Combined Synopsis/ Solicitation (COMBO) for commercial products or
commercial services prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in
this notice. This announcement constitutes the only solicitation; proposals are being requested, and a written solicitation will not be
issued. This solicitation is issued as a Request for Quote (RFQ). The solicitation document and incorporated provisions and clauses
are those in effect through the current Federal Acquisition Circular (FAC). 2025-03
All interested parties are instructed to review the attached Solicitation / RFQ Document and the attached specifications for this requirement.
QUOTES are due No Later Than: 5 JUNE 2025 by 12:00 PM (Noon) MST Local Time.
This requirement is for the purchase and delivery of Concrete, Base Course, #4 Rock, and Sand in accordance with the attached Specifications.
Offerors are highly encouraged to ensure that they thoroughly read the attached RFQ document and follow the instructions.
Specifically, the Addendums to FAR 52. 212-1, Instructions to Offerors and 52.212-2, Evaluation Criteria.
Offerors must include a complete Price Quote for all Line Items along with their Technical Evaluation Proposal:
The Technical Evaluation Proposal Must include a sufficient description of the proposed Materials/Items in accordance with the specifications of each item listed in Paragraph/Section 2 of the Specifications document.
Additionally, Offerors must include the items listed in Paragraph 2.5. Tests, Inspections, and Verification documents for technical acceptability.
For the Base Course, #4 Rock, and Sand – All items indicated in Para. 2.5. b. and for the concrete, all items indicated in Para 2.5. c
As well as the location/source/origin of each item.
- ADMIN ONLY NO REQTN CP 208 828 4658 366 GUNFIGHTER AVE STE 2102
- MOUNTAIN HOME AFB , ID 83648-5296
- USA
- Alethea Coker
- alethea.coker@us.af.mil
- Phone Number 2088283129
- Dan Parks
- daniel.parks.14@us.af.mil
- Phone Number 2088283103
- Jun 04, 2025 11:12 am MDTCombined Synopsis/Solicitation (Updated)
- May 28, 2025 09:51 am MDT Combined Synopsis/Solicitation (Original)
Related Document
| May 28, 2025 | [Combined Synopsis/Solicitation (Original)] Concrete Foundation Material (Concrete, Base Course, #4 Rock, Sand) |
See Also
Event: REQUEST FOR QUOTE FOR WEIGHTED BLANKETS FOR IDJC Event: 1446-0 Category: AGENCY
State Government of Idaho
Due by 10/07/2026
Geothermal HDPE Materials (GEO1006) Geothermal HDPE Pipe and fittings to replace main lines
City of Boise
Due by 9/30/2026
Due Date Date Posted Open Solicitations Details Oct. 7, 2026 Sept. 15, 2026
State Government of Idaho
Due by 10/07/2026
Project ID: MO27-11 Title: FY27 Maintenance 3/8" Chip Seal Aggregate Material Addenda: 0
Ada County Highway District
Due by 9/23/2026