Community Wi-Fi Expansion
| Agency: | City of New Haven |
|---|---|
| State: | Connecticut |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Aug 6, 2026 |
| Due Date: | Aug 18, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID:
Title: Community Wi-Fi Expansion
Addenda: 0
Release Date: 8/6/2026
Due Date: 8/18/2026
Post Information
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Summary
The Community Wi-Fi Grant Project aims to bridge the digital divide and enhance broadband access for the New Haven Green for multi-cultural events.
This request for proposal seeks a qualified proposer to deploy high-speed, secure, and scalable wireless internet access across the New Haven Green for community and cultural events. The project will ensure a minimum of 1 gigabit-per-second symmetrical download and upload speeds, meeting or exceeding the program's technical requirements.
Furnish all labor, supervision, engineering, project management, materials, equipment, tools, transportation, permits, coordination, installation, configuration, testing, training, documentation, warranty services, and incidental work necessary to furnish and place into operation a complete outdoor public Wi-Fi system serving approximately 16 acres of the New Haven Green.
The project includes installation of approximately fifteen outdoor-rated Wi-Fi 6/6E access points on existing or new poles, light fixtures, rooftop locations, and other structures; dedicated fiber-optic backhaul to a Community Anchor Institution served by the Connecticut Education Network; enterprise-grade switches, routers, PoE/PoE+ equipment, injectors and related network electronics; NEMA-rated outdoor enclosures; electrical and power connections; solar power and backup UPS equipment where utility power is unavailable; mounting hardware; fiber and communications cabling; terminations; grounding; bonding; surge and lightning protection; and restoration of affected areas.
The contractor will also configure WPA3 security, VLAN segmentation, public and privileged network access, eduroam and RADIUS authentication, centralized network management, usage reporting, performance monitoring and quality-of-service controls. The work includes RF coverage testing, fiber certification, speed and throughput testing, system commissioning, training, equipment inventory, operating documentation, test reports and record/as-built drawings. The completed system must provide at least 90 percent coverage at -67 dBm or better and support at least 1 Gbps symmetrical bandwidth per sector.
Timeline
See Also
LISC CT OEC Facilities Construction and Renovation Grant Program LISC Connecticut, through an
State Government of Connecticut
Due by 2/03/2027
Request for Price Proposals (RFP) - Solicitation number 2026-09-LC Solicitation Date: September 2,
New Britain Housing Authority
Due by 10/02/2026
Project ID: Title: B027-14 City Sidewalks Addenda: 0 Release Date: 9/11/2026 Due Date:
City of Meriden
Due by 10/02/2026
Follow Design-Bid-Build, P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New
DEPT OF DEFENSE
Due by 9/29/2026