COLUMBUS AFB, MS FAC# 141 & 145 FUEL TANK INSPECTION
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Mississippi |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Dec 31, 2024 |
| Due Date: | Oct 17, 2024 |
| Solicitation No: | W9128F25Q0006 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- Updated Published Date: Dec 31, 2024 09:25 am CST
- Original Published Date: Oct 04, 2024 03:25 pm CDT
- Updated Date Offers Due: Oct 17, 2024 04:00 pm CDT
- Original Date Offers Due: Oct 17, 2024 04:00 pm CDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Nov 01, 2024
- Original Inactive Date: Nov 01, 2024
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: H391 - INSPECTION- FUELS, LUBRICANTS, OILS, AND WAXES
-
NAICS Code:
- 541990 - All Other Professional, Scientific, and Technical Services
-
Place of Performance:
Columbus , MS 39701USA
Q&A
Question 1
Will the Government have the floating roof legs set prior to the contractor’s arrival?
Answer 1
The floating roof legs will be set prior to contractor arrival.
Question 2
Under paragraph 4.1.4, the coatings are to be repaired IAW UFGS 09 97 13.27 and 09 97 13.17. Can these repairs be completed by a simple coating contractor without additional inspection or will a SSPC QS1 contractor with a SSPC QP5 inspector be required as listed by the UFGS specifications?
Answer 2
The repairs can be made without a QP5 or QS1 permitting the Contractor follows process within the coating specifications. Note that the specification requires a coatings plan to be submitted.
Question 3
CLIN 0004, Paragraphs 4.1.2, and 4.1.12, where will the fuel be transferred and what is the approximate distance? Is it preferable to accomplish this via vacuum truck or existing piping and pumps?
Answer 3
Base will empty the tank and turn over to the KTR for cleaning. Attachment B identifies residual fuel.
Question 4
Is electricity and water available on site for cleaning crew usage? If so, can you provide the utility rates
Answer 4
Yes, there is no charge.
Question 5
For the coating condition survey, please confirm that both tanks will have a coating condition survey requirement. Paragraph 4.1.4 under the API Internal heading references both an interior and exterior coating system survey; however, there is no requirement listed under the API external section.
Answer 5
If this project has externals on it the paint sampling is only required when completing an internal, at that time they take samples internally and externally.
Question 6
Will isolation kits be required for the new stainless steel manway hardware? If so, redrilling of the flanges and cover plates is likely required to accommodate the 3/4" bolts and kits.
Answer 6
We have never had anyone have to redrill holes for larger bolts/kits. Isolation kits are not required.
DLA-Energy has requested USACE to conduct one each Internal and External API inspections at Columbus AFB, MS to inspect facilities in accordance with all laws standards, federal regulations, as well as any state and local regulations and guidelines.
API External Inspection Facility #145
API Internal Inspection Facility #141
- KO CONTRACTING OFFICE 1616 CAPITOL AVENUE
- OMAHA , NE 68102-4901
- USA
- Kristal Dobry
- kristal.d.dobry@usace.army.mil
- Jae Chang
- jae.chang@usace.army.mil
- Dec 31, 2024 09:41 am CST Award Notice (Original)
- Dec 31, 2024 09:25 am CSTCombined Synopsis/Solicitation (Updated)
- Nov 01, 2024 10:55 pm CDT Combined Synopsis/Solicitation (Updated)
- Oct 04, 2024 04:29 pm CDT Combined Synopsis/Solicitation (Updated)
- Oct 04, 2024 03:25 pm CDT Combined Synopsis/Solicitation (Original)
See Also
Follow RFI/Sources Sought Notice, Heterotrophic Plate Count (HPC) Waterline Testing Services, Biloxi, MS,
VETERANS AFFAIRS, DEPARTMENT OF
Due by 9/23/2026
Bids due in 28 days 10/13/26 11:00am Electronic bidding 19147.024 City of Macon,
Neel-Schaffer, Inc
Due by 10/13/2026