Columbia Avenue Complete Street

Agency: City of Kissimmee
State: Florida
Type of Government: State & Local
Posted Date: Dec 9, 2025
Due Date: Jan 20, 2026
Solicitation No: RFQ2026004
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Main

Agency
City of Kissimmee
Status
Active
Fiscal Year
2026
Primary Contact
Debbie Luke
Title
Columbia Avenue Complete Street
Secondary Contact

Number
RFQ2026004
Tertiary Contact

Type
Request for Qualifications
Department
Purchasing
Online Submissions
No
Project Estimate
Piggyback Solicitation
No
Insurance Required
No
Bid Bond Required
No
Bid Bond Amount

Performance Bond Required
No
Performance Bond Amount

Construction Bond Required
No
Construction Bond Amount

Scope of Services
It is the intent of the Request for Qualifications for Professional Services (PS) to hire

one (1) Florida Department of Transportation (FDOT) pre-qualified consulting

engineering firm (hereinafter Consultant) under work type 3.2 to provide professional

design services for Columbia Avenue Complete Street project from North Hoagland

Boulevard to North Central Avenue, in accordance with Rule Chapter 14-75, Florida

Administrative Code.

It is the intent and purpose of this solicitation to promote completion. It shall be the

proposer’s responsibility to advise the Procurement Services Representative at the

address noted above, if any language, requirements, etc., or any combination thereof,

inadvertently restricts or limits completion or if the requirements stated in this

document limits it to a single source. Such notification must be submitted in writing

and must be received by the Procurement Services Representative no later than ten

(10) calendar days prior to the proposal closing date.

See Exhibit “A” for a detailed Scope of Services including Project Information,

Description, Purpose, Process, Deliverables and other applicable information.

Project Description:

The City of Kissimmee, Florida is proposing to design a complete streets project along

Columbia Avenue from North Hoagland Boulevard to North Central Avenue. Total

project length is approximately 2.3 miles. The limits of this project may also extend up

to 500’ west of Columbia Avenue on Hoagland Boulevard and up to 500’ east of

Columbia Avenue on North Central Avenue. Within the project limits, Columbia

Avenue is fronted on both sides by a mixture of commercial, institutional, recreational,

and multi-family land uses and lies within the Vine Street District.

As part of the City of Kissimmee’s ADA Transition Plan, there were numerous ADA

deficiencies that were identified within the project limits. In addition, the existing

sidewalk is narrow and frequently obstructed or narrowed by trees or utilities creating

an unpleasant walking environment. The City of Kissimmee has adopted a Vision Zero

goal to reduce the number of fatal and serious injury crashes within Kissimmee to zero

by the year 2040. Therefore, this corridor has been identified for a complete street

project that would not only correct existing deficiencies on the corridor but also construct

elements that will increase safety for non-motorized and vulnerable users.

Project scope resulted from the Columbia Avenue Case Study prepared for Metroplan

Orlando by Kittelson and Associates, Inc. in May of 2016.

This project will include reconstruction of the roadway, curb and gutter, sidewalks, curb

ramps, driveways, streetscape elements, and will bring the entire corridor into

compliance with the Americans with Disabilities Act (ADA). The project will also include

construction of new features to enhance pedestrian and bicycle safety on the corridor

including raised pedestrian refuge islands at strategic locations within the existing

center turn lane, curb extensions at intersections and driveways, reconfiguration of the

cross section to better protect bicycle traffic and improve the pedestrian space, and the

installation of pedestrian oriented decorative lighting.

The project will also include an Interlocal Agreement with the Toho Water Authority

(Toho) for utility adjustments and/or utility replacements as identified by Toho. In

addition, to possible conflict relocations, Toho may assign portions of the existing

system in the Project limits to be upgraded or rehabilitated which may include water,

wastewater, reclaimed water, or gravity sewer. The selected firm will be responsible for

including TOHO adjustments or upgrade plans as part of the City project plans.

This project will utilize a not-to-exceed payment, specific rates of compensation, or a

combination thereof.

Dates(All times are listed as EST )

Broadcast Date
11/23/2025 8:00 AM EST
Question End Date
Due Date
1/20/2026 2:00 PM EST
Bid Opening Date

Pre-Bid Meetings

Total: 1 (All times are listed as EST )
Date Time Mandatory Location
12/10/2025 10:00 AM No CITY OF KISSIMMEE
DEVELOPMENT SERVICES BUILDING CONFERENCE ROOM
101 CHURCH STREET
KISSIMMEE, FL 34741
Shortlist Meeting

Total: 0 (All times are listed as EST )
Date Time Location
Documents

Total: 2
Type Name Description File Type
Request for Qualifications RFQ2026004 Columbia Ave Complete Street.pdf RFQ Document PDF
Addendum Addendum 1 RFQ2026-004 Columbia Avenue Complete Street.pdf Addendum 1 PDF
Commodity Codes

Total: 3
Code Description
[918-32] Consulting Services (Not Otherwise Classified)
[918-42] Engineering Consulting
[907-35] Designing Services
Publications

Total: 1
Publication Date
Orland Sentinel 11/23/2025
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Invitation to Bid 224006 Cocoa REVAMP Department of Military Affairs (DMA) Advertisement Status:

State Government of Florida

Bid Due: 6/11/2026

Invitation to Bid (ITB) - Ohio Ave. & Florida Ave. Corridors Streetscape Improvements

Lynn Haven city

Bid Due: 6/30/2026

Description: Convention Center - AHUs Refurbishment, Phase III(RE-BID) Department: Facilities Dev & Ops

Palm Beach County

Bid Due: 7/16/2030

Description: CJC Faraday Room - Shielded Enclosure Installation (RE-BID) Department: Purchasing Buyer: Zulma

Palm Beach County

Bid Due: 1/31/2030