Collison Floating Evaporation Pan for Lake Buchanan
| Agency: | State Government of Texas |
|---|---|
| State: | Texas |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Dec 4, 2024 |
| Due Date: | Dec 19, 2024 |
| Solicitation No: | 580-25-IFB-3271 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
580-25-IFB-3271
Posted
Valerie Arnold-
(512) 475-1926
valerie.arnold@twdb.texas.gov
12/19/2024
2:00 PM
580
14+ Days for Entire Solicitation Package
12/4/2024
12/4/2024 9:30 am
96891-Water Supply Analysis, Infrastructure Analysis, Water Quality Analysis, And Long Term Planning;
NIGP code: 968-91
Texas WaterDevelopment Board solicits the following items under a sole source proprietary solicitation. These specifications are being advertised under Section 2155.067 of the TexasGovernment Code. Only bids on items conforming exactly to these specifications,which include proposing only the brand name(s), make and model number(s)specified, will be considered in determining an award.
Statement of Work(SOW):
Business need :
Deployment of aCollison Floating Evaporation Pan (CFEP) on Lake Buchanan, Texas, andmonitoring, maintenance, and performance of quarterly hemispherical validationtests. Construction of the version 4 CFEP will begin in Fall 2024 with atentative deployment during the first few months of 2025, weather dependent. Asite visit to Lake Buchanan will take place in January or February 2025 todetermine the optimal deployment location with staff from TWDB and/or LCRApresent to facilitate site access. Agua del Sol Consultants will supply a boatfor this site visit. Monitoring and site visits will continue through September30, 2026.
Data provisionfrequency will be:
- quarterly QA/QCdata within 3 weeks of the end of each quarter
- real-timeprovisional daily data through a website link
Equipment to be installed/maintained:
One Collison Floating Evaporation Pan (CFEP):consists of a twenty-foot diameter wave guard surrounding an 8-foot diameter4-foot-deep evaporation pan made from 6061 marine grade aluminum alloy. Thewater level height in the CFEP’s evaporation pan is measured by a linearpotentiometer attached to a float.
Three sets of anchors spaced 120° around and ~ 40feet from the CFEP: each consisting of ~150 lb concrete blocks, 25-50 feet of3/8 proof coil chain, one white or orange warning buoy, and 50-75 feet(depending on depth) of 1/4-inch stainless steel cable. A flashing warninglight will also be present on the CFEP, providing a warning for nighttimeboaters.
The following instrumentation and equipment areattached to the CFEP: Air temperature and relative humidity sensor, wind speedand direction sensor, barometric pressure sensor, precipitation sensor, solarradiation sensor, two infrared sensors, linear potentiometer, digital camera,solar panel, power converter, sealed battery, data logger, cellular modem, andmodem antenna.
Annual budget:
The costs andfees below are based on the estimated 8-10 site visits per year, with each sitevisit lasting between 4-7 days. Salary costs will cover field technician sitevisits and hydrologists costs for performing QA/QC on the collected data. Thebudgets for years 1 and 2 are identical and are outlined below.
|
Description |
Qty |
Unit Price |
Amount |
|
Cell Modem on Pan |
1 |
$ 1,091.00 |
$ 1,091.00 |
|
Camper Usage Fee |
1 |
$ 3,000.00 |
$ 3,000.00 |
|
Boat Usage Fee |
1 |
$ 3,000.00 |
$ 3,000.00 |
|
Truck Usage Fee |
1 |
$ 3,000.00 |
$ 3,000.00 |
|
Milage, Gas ($0.655/mile) |
1 |
$ 7,000.00 |
$ 7,000.00 |
|
M&E for Site Visits |
1 |
$ 2,000.00 |
$ 2,000.00 |
|
Salary |
1 |
$ 40,000.00 |
$ 40,000.00 |
|
Facilities and Administrative % |
|
10% |
$ - |
|
Facilities and Administrative Cost |
1 |
$ 5,909.00 |
$ 5,909.00 |
|
Budget for 10/1/2024 through 9/30/2026, Tax Exempt |
SUBTOTAL |
$ 65,000.00 |
|
|
TAX (7.5%) (NA) |
|
||
|
TOTAL |
$ 65,000.00 |
||
Contract term: Thecontract will be for two years with the possibility of extensions reflectingthe initial annual costs of years 1 and 2.
*Please see attached Exhibit A*
QUESTION AND ANSWER PERIOD: 12/11/2024 – 12/13/2024
All questionsshould be directed to TWDB Purchaser, Valerie Arnold at Bid-Room@twdb.texas.gov .
Bid SubmissionRequirements:
Bids shall be emailed only to Bid-Room@twdb.texas.gov
- Bids shall be received by Due Date 12/19/2024, by 2:00pm Central (no late bids will be accepted)
- Bids shall contain the following information to be accepted.
a. Reference Bid Name, Reference Number,Due Date
b. Vendor full business name, address,city, state, and zip code.
c. Vendors contact name, phone, andemail.
d. Vendor W-9 form.
e. Description of item(s) being bid.
f. Quantity.
g. Cost (broken out by quantity).
h. Notification ifthere will be ongoing licensing or fee requirements.
See Also
Project ID: 26-101-13 Title: Automated Weather Observing System (AWOS III-PT) - Ennis Municipal
Ennis city
Due by 9/23/2026
Follow New - CAP - One Year Requirement Active Contract Opportunity Notice ID
VETERANS AFFAIRS, DEPARTMENT OF
Due by 9/18/2026
Follow Astromaterials Glovebox Systems - Design & Fabrication (A-BOX) Active Contract Opportunity Notice
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
Due by 9/15/2026
Follow Quantel CFR 400 GRM pulsed laser system Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Due by 9/17/2026