Collection System Rehabilitation Project CIP CWW2501
| Agency: | City of Sugar Land |
|---|---|
| State: | Texas |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | May 20, 2026 |
| Due Date: | Jun 11, 2026 |
| Solicitation No: | CIP CWW2501 - 2026-ITB-023 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID: CIP CWW2501 - 2026-ITB-023
Title: Collection System Rehabilitation Project CIP CWW2501
Addenda: 0
Release Date: 5/20/2026
Due Date: 6/11/2026
Post Information
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Summary
The project includes rehabilitation of approximately 38,488 L.F. of existing 6”–15” sanitary sewer lines through pipe bursting and cured-in-place pipe (CIPP) lining, along with cleaning and televising of existing sewer lines. Work also includes bypass pumping, manhole installation and rehabilitation, service reconnections, traffic control, and coordination with the City, residents, businesses, pipeline companies, and inspectors.
Add Alternate No. 1 includes rehabilitation of approximately 1,255 L.F. of existing 8” sanitary sewer by pipe bursting.
Add Alternate No. 2 includes rehabilitation of approximately 1,235 L.F. of existing 8” sanitary sewer by pipe bursting.
Please review the attached Invitation to Bid project manual and construction drawings for more details.
Background
The City of Sugar Land’s wastewater collection system includes approximately 2.6 million linear feet of sanitary sewer pipe, about 133 lift stations, approximately 16,450 sanitary sewer manholes, and four (4) wastewater treatment plants, North Wastewater Treatment Plant (North WWTP), South Wastewater Treatment Plant (South WWTP), West Wastewater Treatment Plant (West WWTP), and Greatwood Wastewater Treatment Plant (Greatwood WWTP). Gravity sewer mains, force mains, lift stations, and gravity interceptor mains convey the flows to the wastewater treatment plants.
In continuation of the City’s bi-annual wastewater collection system evaluation program, the areas included in the scope of work were identified as critical wastewater lines needing repair and rehabilitation. The critical wastewater lines were selected by a risk rating system that was developed based on the pipes’ size, material type, age, and depth.
Timeline
Collection System Rehabilitation Project, CIP CWW2501 | Microsoft Teams | Meetup-Join
https://teams.live.com/meet/937285351373?p=yZBZNaTfdX497M5ONC
Meeting ID: 937 285 351 373
Passcode: pu3Uy9
1st Floor City Hall
2700 Town Center Boulevard North
Sugar Land, Texas, 77479
See Also
Solicitation Details eResponse Instructions Subscribe Print PDF Type: Invitation For Bids (IFB) Status:
City of Austin
Due by 11/12/2026
Follow FCI Three Rivers-Replace Generators, Transformers, and Electrical Infrastructure Active Contract Opportunity Notice
JUSTICE, DEPARTMENT OF
Due by 11/30/2026
Follow Elevator Replacement - JBSA-Randolph Active Contract Opportunity Notice ID FA301627Q7005 Related Notice
DEPT OF DEFENSE
Due by 11/05/2027
Follow USACE EDDC Scope Dredge to Budget RFP DRAFT Active Contract Opportunity Notice
DEPT OF DEFENSE
Due by 11/09/2026