| Agency: | State Government of Georgia |
|---|---|
| State: | Georgia |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 20, 2026 |
| Due Date: | May 22, 2026 |
| Solicitation No: | PE-56300-RFP-2026-000000024 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-56300-RFP-2026-000000024 | Coffin Building Gym Floor Replacement | College Of Coastal Georgia |
Apr 20, 2026 @ 11:49 AM
|
May 22, 2026 @ 02:00 PM
|
Start Date: Apr 20, 2026 @ 11:49 AM ET
End Date:
May 22, 2026 @ 02:00 PM ET
Demo gym floor to the bare concrete. Install approximately 10,070 square feet of Aacer MFMA certified floor system to fit existing six-inch slab depression, with 21/4" x 3/4" #2 grade or better MFMA certified, maple over custom sleeper system, on cush pads, over 6mil vapor barrier. Install new cove base to both end of walls and affected wall areas. Drum sand the entire court. Apply game lines, painting, and staining to match the existing artwork and color scheme.
| Code | Description |
| 91444 | Flooring |
| 91427 | Carpentry |
| 91025 | Flooring Maintenance and Repair, Including Refinishing and Sealing Services |
| 90945 | Finishes, Flooring, Wall and Ceiling, etc. |
| 90975 | Site Clean-up, Post-Construction |
| 91006 | Carpentry Maintenance and Repair Services |
Paul Melchor
pmelchor@ccga.edu
9122795833
DESIGN-BID-BUILD
CONSTRUCTION CONTRACT
BETWEEN CONTRACTOR AND OWNER
TO BE USED WITH
BOARD OF REGENTS OF THE UNIVERSITY SYSTEM OF GEORGIA'S
DESIGN PROFESSIONAL CONTRACT
BETWEEN
LEGAL GC Firm Name
(CONTRACTOR)
AND
BOARD OF REGENTS OF THE
UNIVERSITY SYSTEM OF GEORGIA
(OWNER)
For the Use and Benefit of:
the College Of Coastal Georgia
Using Agency (Institution)
PROJECT NO. CCGA Coffin Building Gym Floor Replacement
INCLUDES:
Executive Summary of Contents Preface
Form of Contract Contract 1 to 3
Bid Requirements Bid 1 to 10
General Conditions GC 1 to 60
Forms Forms 1 to 29
Supplementary General Conditions
EXECUTIVE SUMMARY OF CONTENTS
FORM OF CONTRACT
1
BID REQUIREMENTS
GENERAL CONDITIONS
SECTION 1 - GENERAL
Part 1 - General
Part 2 - Contractor's General Responsibilities and Duties
Part 3 - Owner's General Responsibilities and Rights
Part 4 - Protection of Persons and Property
Part 5 - Bonds, Indemnity, and Insurance
Part 6 - Hazardous Conditions and Materials
Part 7 - Miscellaneous Provisions
SECTION 2 - PRE-COMMENCEMENT PHASE
Part 1 - Pre-commencement Phase Services
Part 2 - Construction Documents and Site Plan
SECTION 3 - CONSTRUCTION PHASE
Part 1 - Construction Phase Services
Part 2 - Changes to the Work
Part 3 - Time
Part 4 - Correcting the Work, Inspections, Covering and Uncovering Work
Part 5 - Subcontractors, Trade Contractors, and Suppliers
SECTION 4 - COMPENSATION
Part 1 - General
Part 2 - Payments Withheld
Part 3 - Liens
SECTION 5 - CONTRACT ADJUSTMENTS, DISPUTES, AND TERMINATION
Part 1 - Owner's Right to Suspend Work
Part 2 - Contract Adjustments and Disputes
Part 3 - Termination
SECTION 6 - PROJECT COMPLETION
Part 1 - Material Completion
Part 2 - Final Completion
Part 3 - Inspections for Completion of the Work
Part 4 - Final Documents
Part 5 - Payment for Material Completion and Final Payment
Part 6 - Correction of the Work after Final Completion
SECTION 7 - FORMS
Performance Bond
Payment Bond
Offsite Stored Materials Agreement
Georgia Security and Immigration Compliance Act Affidavit(s)
Non-Influence Affidavit
Statutory Affidavit
Five Year Bond on Roofs and Walls
Specimen Certificate of Manufacturer
Certificate of Insurance
Bond to Discharge Claim
Change Order Forms
Application for Payment Form
Subcontractor Retainage Release Certificate
Final Certification of Costs
SUPPLEMENTARY GENERAL CONDITIONS
CONSTRUCTION CONTRACT
BETWEEN CONTRACTOR AND OWNER
THIS CONSTRUCTION CONTRACT (hereinafter the "Contract") made this Date day of Month, Year (hereinafter the "Effective Date"), by and between the Board of Regents of the University System of Georgia (hereinafter the "Owner"), for the use and benefit of The College of Coastal Georgia (hereinafter the "Using Agency" or "Institution") LEGAL GC Firm Name, (hereinafter the "General Contractor" / "Contractor").
Contractor's FEIN or Tax Identification Number:
Contractor's Georgia License Type and Number:
Contractor's Federal Employment Verification Certification:
The Contractor is registered with, authorized to use, is using and will continue to use, the federal work authorization program throughout the term of the contract, and holds the following authorization:
User Identification Number:
Date of Authorization: Date
WITNESSETH, that the Contractor and the Owner, for the consideration set forth herein, the adequacy and sufficiency of which is hereby acknowledged by each party, agree as follows:
Project No. CCGA 2635 - Coffin Building Gym Floor Replacement
Project Name and Description: CCGA 2635-Coffin Building Gym Floor replacement - All labor and Material to demo gym floor to the bare concrete. Install approximately 10,070 square feet of Aacer MFMA certified floor system to fit the existing six-inch slab depression, with 21/4" x 3/4" #2 grade or better MFMA certified, maple over custom sleeper system, on cush pads, over 6mil vapor barrier. Install new cove base to both end of walls and affected wall areas. Drum sand the entire court. Apply game lines, painting, and staining to match the existing artwork and color scheme.
1. Existing Documents. The Contractor has reviewed and taken into consideration the Bidding Documents in preparing his bid.
2. The Contract Sum: The Owner shall pay the Contractor for the performance of the contract, subject to additions and deductions provided by approved change orders, in current funds, the Contract Sum as follows, (base bid less Deductive Alternate 1)
and /100 Dollars ($ )
3. The Material Completion and Occupancy Date shall be achieved within 120 consecutive calendar days beginning the date specified in the Proceed Order. (Or by a date certain - be specific as to what was represented in the Bid Documents - REMOVE THIS STATEMENT PRIOR TO FINALIZING THE CONTRACT!)
4. The agreed daily amount for Liquidated Damages is: $ per day.
5. The agreed daily amount for Time Dependent Overhead Costs is: $ per day.
6. Notice. All notices in accordance with Section 1.1.5 shall be given to the following addresses:
CONTRACTOR: LEGAL GC Firm Name
Physical Address, NO P.O. Boxes
City, State Zip
Attention: CM-POC, Title
Phone Number: CM-POC Phone
Email: CM-POC Email address
OWNER: Board of Regents of the University System of Georgia
270 Washington Street, SW
30334
Attention: Sandra Lynn Neuse, Vice Chancellor for
Real Estate & Facilities
Phone Number: 404-962-3155
USING AGENCY (Institution): The College of Coastal Georgia
One College Drive
Brunswick, GA 31520
Attention: Michelle Ham
Phone Number: 912-279-5744
Email: Mham@ccga.edu
7. Scope of The Work: The Contractor shall furnish all the materials, perform all of the Work, and do all things required by the Contract Documents.
8. Schedule and Completion: The Pre-commencement Phase Services to be performed under this Contract shall commence upon the Effective Date of the Contract and be completed within 120 days thereafter. Activities on the Site shall commence on the date specified in the Proceed Order and shall be materially complete in accordance with established Milestones, and not later than the Material Completion and Occupancy Date.
9. Periodic Progress Payments: The Owner shall make progress payments, less retainage, as set forth in Section 4 of the General Conditions.
10. Payment for Material Completion: The Contractor may request payment of the remaining contract balance, including retainage, less amounts credited the Owner or incurred as liquidated damages, and less amounts withheld for the Punchlist by reason of Minor Items or Permitted Incomplete Work (See Paragraph 6.5.3.2). Payment for Material Completion shall be made by a check payable jointly to the Contractor and Surety and shall be mailed to the Surety.
11. Final Payment: Final Payment shall be made within ten days of receipt of the final payment application as set forth in Section 6, Part 2 of the General Conditions, provided that all other requirements of the Contract shall have been met in full.
12. The Contract Documents: This Contract, together with the Bidding Documents and the Bid, shall constitute the Contract Documents for the Project.
13. Bonds: The Contractor shall furnish both a performance bond and a payment bond and shall pay the premiums thereon as a Cost of the Work. The Performance Bond shall guarantee the full performance of the Contract.
14. Full Performance: The Owner and the Contractor hereby agree to the full performance of the Contract Documents.
15. Applicable Law: This Contract and all rights, privileges and responsibilities shall be interpreted and construed according to the laws of the State of Georgia.
16. No Conflict of Interest: The Contractor covenants that it presently has no interest and shall not acquire any interest, direct or indirect, that would conflict in any manner or degree with the performance required under this Contract. The Contractor further covenants that, in the performance of this Contract, it shall neither contract with nor employ any person having any such interest.
17. Transactions With State Officials, Ethics: The parties hereto certify that the provisions of law contained in the Act prohibiting full-time appointive officials and employees of the State from engaging in certain transactions affecting the State as defined in O.C.G.A. 45-10-20-26 and the Governor's Executive Orders governing ethics, have not and will not be violated in any respect in regard to this contract and further certifies that registration and all disclosures required thereby have been complied with.
18. No Assignment: This Contract and the proceeds of this Contract may not be assigned or sublet as a whole, nor may the performance thereunder be assigned, without the prior written consent of the Owner.
19. No Waiver: The failure of the Owner at any time to require performance by the Contractor of any provision hereof, shall in no way affect the right of the Owner thereafter to enforce any provision or any part of the Contract, nor shall the failure of the Owner to enforce any breach of any provision hereof to be taken or held to be a waiver of such provision, or as a waiver, modification or rescission of the Contract itself.
20. Full Agreement. The Contract Documents supersede all prior negotiations, discussion, statements, and agreements between Owner and Contractor and constitute the full, complete, and entire agreement between Owner and Contractor. There can be no changes to this Contract by oral means, nor by course of conduct of the parties, nor by custom of the trade. No changes to this Contract will be binding on either party hereto unless such change is properly authorized, in writing, in accordance with Section 3, Part 2 of the General Conditions.
IN WITNESS WHEREOF the parties hereto have executed this Contract the day and year first written above.
CONTRACTOR:
LEGAL GC Firm Name
_
Print Name, Title
APPROVED BY USING AGENCY:
Institution Name (A Unit of the University System Of Georgia)
Print Name, President
Print Name and Title
OWNER:
BOARD OF REGENTS OF THE UNIVERSITY SYSTEM OF GEORGIA
Sandra Lynn Neuse, Vice Chancellor for
Real Estate and Facilities
Samson Oyegunle, Associate Vice Chancellor
for Design & Construction
Attachments:
General Conditions and Forms
Supplementary General Conditions
BID REQUIREMENTS
INVITATION TO BID
The Owner will receive sealed bids from Contractors in Plant Operations Warehouse Conference Room, One College Dr. Brunswick GA, 31520 (Address). Bids must be physically on the table in the Bid Room by 2:00pm o'clock, at the time legally prevailing in Atlanta, Georgia on May 21, 2026, for the construction of The Coffin Building Gym Floor Replacement located in. Brunswick , Georgia. At the time and place noted above, the bids will be publicly opened and announced.
Bidders are cautioned that acquisition of Bidding Documents through any source other than the office of the Design Professional is not advisable. Acquisition of Bidding Documents from unauthorized sources places the bidder at risk of receiving incomplete or inaccurate information upon which to base a bid.
Contract, if awarded, will be on a lump sum basis. No bid may be withdrawn for a period of sixty (60) days after time has been called on the date of opening except in accordance with the provisions of Georgia law. Bids must be accompanied by a Bid Bond made payable to the Owner in an amount equal to not less than five percent of the Bid. Both a performance bond and a payment bond will be required, each in an amount equal to 100 percent of the Contract Sum prior to execution of contract.
The Owner reserves the right in its sole and complete discretion to waive technicalities and informalities. The Owner further reserves the rights in its sole and complete discretion to reject all bids and any bid that is not responsive or that is over the budget. The Owner anticipates that the contract will be awarded to the responsive and responsible bidder who provides the lowest bid within the budget. In judging whether the bidder is responsible, the Owner will consider, but is not limited to, the following:
Whether the bidder or its principals are currently ineligible, debarred, suspended, or otherwise excluded from bidding or contracting by any state or federal agency, department, or authority;
Whether the bidder or its principals have been terminated for cause or are currently in default on a public works contract;
Whether the bidder can demonstrate sufficient cash flow to undertake the project as evidenced by a Current Ratio of 1.0 or higher;
Whether the bidder can demonstrate a commitment to safety with regard to Workers' Compensation by having an Experience Modification Rate (EMR) over the past three years not having exceeded an average of 1.2; and
Whether the bidder's past work provides evidence of an ability to successfully complete public works projects within the established time, quality, or cost, or to comply with the bidder's contract obligations.
In the event all responsive and responsible bids are in excess of the budget, the Owner, in its sole and absolute discretion and in addition to rejecting all bids, reserves the right either to supplement the budget or to negotiate with the lowest responsive and responsible bidder (after all deductive alternates are taken) but only for the purpose of making changes to the project that will result in a cost to the Owner that is within the budget, as it may be supplemented.
BOARD OF REGENTS OF THE UNIVERSITY SYSTEM OF
BY: SANDRA LYNN NEUSE, VICE CHANCELLOR FOR REAL ESTATE & FACILITIES
NOTE - If within campus delegated authority, replace VC Neuse's name with the campus' project procurement entity.
[Remainder of Page Intentionally Left Blank]
BID REQUIREMENTS
INSTRUCTIONS TO BIDDERS
1. Basis of Contract. Contract, if awarded, will be on a lump sum basis and will be substantially in accordance with the Contract shown on pages Contract - 1 to Contract - 4.
2. Examination of Site. In undertaking the work under this Contract, the Contractor acknowledges that he has visited the Project Site and has taken into consideration all observed conditions that might affect his work.
3. Surety and Insurance Companies. The Contract provides that the surety and insurance companies must be acceptable to the Owner. Only those sureties listed in the Department of Treasury's Listing of Approved Sureties (Department Circular 570) are acceptable to the Owner. At the time of issuance, all insurance and bonds must be issued by a company licensed by the Georgia Insurance Commissioner to transact the business of insurance in the State of for the applicable line of insurance. Such company shall be an insurer (or, for qualified self-insurers or group self-insureds, a specific excess insurer providing statutory limits) with an A.M. Best Financial Strength Rating of "A-" or better and with an A.M. Best Financial Size Category of Class V or larger.
4. Bidding Documents. The Bidding Documents comprise the Construction Documents, the Invitation to Bid, the Instructions to Bidders, the Bid Form, and all Addenda, upon which the bidder submits a bid.
5. Addenda. All Addenda issued prior to bid date adjust, modify, or change the drawings and specifications as set forth in the Addenda. No Addenda will be issued within five days of the date set for opening bids without an extension of the bid date. All such Addenda are part of the contract.
6. Interpretations. No oral interpretation will be made to bidders as to the meaning of the drawings and specifications. Requests for interpretation of drawings and specifications must be made in writing to the Design Professional not later than six days prior to the date set for receipt of the bids. Failure on the part of the successful bidder to request clarification shall not relieve him as Contractor of the obligation to execute such work in accordance with a later interpretation by the Design Professional. All interpretations made to bidders will be issued in the form of Addenda to the plans and specifications and will be sent to all plan holders of record. Acknowledgement of receipt of such Addenda shall be listed in the Bid Form by the Contractor.
7. Alternates. Unless otherwise stipulated, all alternate bids are deductive. It is in the best interest of the public, and the intent of the Owner is, that the entire Project be constructed within the funds allocated in the Project budget. The acceptance of any deductive alternate will be utilized as a last resort to accomplish the Project without requiring a redesign and rebidding of the Project. Any alternate, or alternates, if taken, will be taken in numerical sequence to the extent necessary.
8. Sales Tax. Unless otherwise provided for in the Contract Documents, the Contractor shall include in his bid all sales taxes, consumer taxes, use taxes, and all other applicable taxes that are legally in effect at the time bids are received.
9. Trade Names, Specifications.
(a) No Restriction of Competition. When reference is made in the Contract Documents to trade names, brand names, or to the names of manufacturers, such references are made solely to indicate that products of that description may be furnished and are not intended to restrict competitive bidding. If it is desired to use products of trade or brand names or of manufacturers' names that are different from those mentioned in the Bidding Documents, application for the approval of the use of such products must reach the hands of the Design Professional at least ten days prior to the date set for the opening of bids (see 9(b) below). This provision applies only to the party making a submittal prior to bid. If approved by Design Professional, the Design Professional will issue an addendum to all bidders. This provision does not prevent the Owner from initiating the addition of trade names, brand names, or names of manufacturers by addendum prior to bid.
(b) Request for Approval of Substitute Product. All requests for approval of substitution of a product that is not listed in the Bidding Documents must be made to the Design Professional in writing. For the Design Professional to prepare an addendum properly, an application for approval of a substitute product must be accompanied by a copy of the published recommendations of the manufacturer for the installation of the product together with a complete schedule of changes in the drawings and specifications, if any, that must be made in other work in order to permit the use and installation of the proposed product in accordance with the recommendations of the manufacturer of the product. The application to the Design Professional for approval of a proposed substitute product must be accompanied by a schedule setting forth in which respects the materials or equipment submitted for consideration differ from the materials or equipment designated in the Bidding Documents.
(c) Burden of Proof. The burden of proving acceptability of a proposed product rests on the party making the submission. Therefore, the application for approval must be accompanied by technical data that the party requesting approval desires to submit in support of its application. The Design Professional will consider reports from reputable independent testing laboratories, verified experience records showing the reputation of the proposed product with previous users, evidence of reputation of the manufacturer for prompt delivery, evidence of reputation of the manufacturer for efficiency in servicing its products, or any other written information that is helpful in the circumstances. The degree of proof required for approval of a proposed product as acceptable for use in place of a named product or named products is that amount of proof necessary to convince a reasonable person beyond all doubt. To be approved, a proposed product must also meet or exceed all express requirements of the Contract Documents.
(d) Issuance of Addenda. If the Design Professional approves the submittal, an addendum will be issued to all prospective bidders indicating the approval of the additional product(s). Issuance of an addendum is a representation to all bidders that the Design Professional in the exercise of his professional discretion established that the product submitted for approval is acceptable and meets or exceeds all express requirements. If a submittal is initially rejected by the Design Professional, but determined to be acceptable to Design Professional after a conference with the Owner, an addendum covering the said submittal will be issued prior to the opening of bids. The successful bidder may furnish no products of any trade names, brand names, or manufacturers' names except those designated in the Contract Documents unless approvals have been published by addendum in accordance with the above procedure. Oral approvals of products are not valid.
(e) Conference with the Owner. Any party who alleges that rejection of a submittal is the result of bias, prejudice, caprice, or error on the part of the Design Professional may request a conference with a representative of the Owner, provided: that the request for said conference, submitted in writing, shall have reached the Owner at least six days prior to the date set for the opening of bids, time being of the essence.
10. Employment of Georgia Citizens and Use of Products. The work provided for in this Contract is to be performed in . It is the desire of the Owner that materials and equipment manufactured or produced in shall be used in the work and that citizens shall be employed in the work at wages consistent with those being paid in the general area in which the work is to be performed. This desire on the part of the Owner is not intended to restrict or limit competitive bidding or to increase the cost of the work; nor shall the fulfillment of this desire be asserted by the Contractor as an excuse for any noncompliance or omission to fulfill any obligation under the contract.
11. Trading with the State Statutes, Ethics. By submitting a bid, the bidder certifies that the provisions of law contained in O.C.G.A. Sections 45-10-20 to 45-10-71, which prohibit officials and employees of the state from engaging in certain transactions with the state and state agencies, and the Governor's Executive Orders governing ethics, have not and will not be violated in any respect in regard to this contract and further certifies that registration and all disclosures required thereby have been complied with.
12. Georgia Security and Immigration Compliance Act Requirements. No bid will be considered unless the Contractor certifies its compliance with the Immigration reform and Control Act of 1986 (IRCA), D.L. 99-603 and the Georgia Security Immigration Compliance Act OCGA 13-10-91 et seq. The Contractor shall execute the Georgia Security and Immigration Compliance Act Affidavit, as found in Section 7 of the Construction Contract. Contractor also agrees that it will execute any affidavits required by the rules and regulations issued by the Georgia Department of Audits and Accounts. If the Contractor is the successful bidder, contractor warrants that it will include a similar provision in all written agreements with any subcontractors engaged to perform services under the Contract.
13. Owner's Policy Statement. The policy of the Owner is that minority business enterprises shall have the maximum opportunity to participate in the Owner's purchasing process. The Owner encourages all minority business enterprises to compete for, win, and receive contracts for goods, services, and construction. In addition, law provides a state income tax credit available to any business that subcontracts with a minority-owned business. [See O.C.G.A. 48-7-38 and O.C.G.A. 50-5-130. See also Executive Order of the Governor No. A-11-0002-1992.] Any questions regarding statements contained hereunder should be directed to {Name, Address, and Telephone Number of Designee, as described in the box below}.
14. Bids.
(a) Bid Opening. Bids will be opened and announced as stated in the Invitation to Bid.
(b) Bid Submission. All bids must be submitted on the Bid Form as attached hereto and must be signed, notarized, and sealed by a notary public. All blanks for information entry in bid forms submitted to Owner should be filled. Blanks left unfilled constitute irregularities in the bid and place the bidder at risk of having the bid rejected unless the Owner rules the irregularity to be an informality or technicality that the director can waive, as is made clear in Paragraph 16 of these "Instructions to Bidders" and on the Bid Form. Numbers shall be written in English words and in Arabic numerals. The inclusion of any condition, alternate, qualification, limitation, or provision not called for shall render the bid nonresponsive and shall be sufficient cause for rejection of a bid.
(c) Bid Security. Bids must be accompanied by a Bid Bond made payable to the Owner in an amount not less than five percent of the Bid. Bid Bonds should be furnished on forms accepted as standard by the insurance industry, but shall be substantially in accordance with the Bid Security Form attached hereto.
(d) Delivery of Bids. Bids are to be addressed to the Owner, at the address and room number shown in the Invitation to Bid. Bids must be enclosed in an opaque, sealed envelope; marked with the Bid Date, Bid Time, Bid Number, Name of Project; and identified with the words "Bid for Construction." Bids must be placed in the hands of the Owner at the specified location by not later than the hour and date named in the Invitation to Bid. After that time, no bids may be received. It is the sole responsibility of the bidder to ensure the delivery of the bids to the required address.
(e) Alternates. A bid must be submitted for all alternates. Failure to so may render the bid nonresponsive and be sufficient cause for rejection of a bid.
(f) Withdrawal of Bids. Bids may be withdrawn by bidders prior to the time set for official opening. After time has been called, no bid may be withdrawn for a period of sixty (60) days after the time and date of opening except as provided in O.C.G.A Section 13-10-22 (appreciable error in calculation of bid). Negligence or error on the part of any bidder in preparing his bid confers no right of withdrawal or modification of his bid after time has been called except as provided by Georgia law.
15. Contract Award. Award shall be made on a lump sum basis to the lowest responsive and responsible bidder. The lowest bid will be the bid whose price, after incorporating all accepted alternates, is the lowest responsive bid that was received from a responsible bidder. No bid may be withdrawn for a period of sixty (60) days after time has been called on the date of opening except in accordance with the provisions of law.
16. Owner's Rights Concerning Award. The Owner reserves the right in its sole and complete discretion to waive technicalities and informalities. The Owner further reserves the right in its sole and complete discretion to reject all bids and any bid that is not responsive or that is over the budget, as amended. In judging whether the bidder is responsible, the Owner will consider, but is not limited to consideration of, the following:
(a) Whether the bidder or its principals are currently ineligible, debarred, suspended, or otherwise excluded from bidding or contracting by any state or federal agency, department, or authority;
(b) Whether the bidder or its principals have been terminated for cause or are currently in default on a public works contract;
(c) Whether the bidder can demonstrate sufficient cash flow to undertake the project as evidenced by a Current Ratio of 1.0 or higher;
(d) Whether the bidder can demonstrate a commitment to safety with regard to Workers' Compensation by having an Experience Modification Rate (EMR) over the past three years not having exceeded an average of 1.2; and
(e) Whether the bidder's past work provides evidence of an ability to successfully complete public works projects within the established time, quality, or cost, or to comply with the bidder's contract obligations.
17. Owner's Right to Negotiate with the Lowest Bidder. In the event all responsive and responsible bids are in excess of the budget, the Owner, in its sole and absolute discretion and in addition to the rights set forth above, reserves the right either to (i) supplement the budget with additional funds to permit award to the lowest responsive and responsible bid, or (ii) to negotiate with the lowest responsive and responsible bidder (after taking all deductive alternates) only for the purpose of making changes to the Project that will result in a cost to the Owner that is within the budget, as it may be amended.
18. Contract Forms. The contract forms, including the payment and performance bonds, shall be as set forth in the General Conditions, Section 7 - Forms.
BID REQUIREMENTS
BID FORM
To: Owner ________________________________________________________
Re: Project No., Name ________________________________________________________
Bid Date:
THE BID:
Bid. Having carefully examined the Specifications entitled the Bidding Documents, Drawings: and Addendum No.(s): ___________ as well as the Site and conditions affecting the Work, bidder hereby proposes to furnish all services, labor, materials, and equipment called for by them for the entire Work, in accordance with the aforesaid documents, for the sum of:
______________________________________________________________ Dollars ($ ___________________________)
which sum is hereinafter called the Bid. The Bid shall be the amount of the Contract Sum executed between the Owner and the Contractor unless Alternates are accepted.
Alternates. We further propose that, should any of the following alternates be accepted and be incorporated in the Contract, the Bid will be altered in each case as follows:
Errors or Revisions. Prior to the bid opening date and hour, errors may be stricken or revisions may be made and corrections entered on this proposal form or on the bid envelope with sufficient clarity to be easily understood. All such annotations shall be binding on the bidder.
No Withdrawal. For and in consideration of the sum of $10.00, the receipt of which is hereby acknowledged, bidder and Owner agree that this bid may not be revoked or withdrawn after the time set for the opening of bids, except as provided in Georgia law, but is an irrevocable offer that shall remain open for acceptance for a period of sixty (60) days following the time set for the opening of bids.
Execution of the Contract. If bidder is notified in writing by statutory mail of the acceptance of this bid within sixty (60) days after time set for the opening of bids, bidder agrees to execute within ten days the Contract for the Work for the above stated Bid, as adjusted by the accepted Alternates, and at the same time to furnish and deliver to the Owner a Performance Bond and a Payment Bond on forms shown in Section 7 of the General Conditions of the Contract, both in an amount of equal to 100 percent of the Contract Sum.
Commencement and Completion of Work. Upon the Effective Date of the Contract, bidder agrees to commence all Preconstruction Activities. Upon issuance of a Proceed Order, bidder agrees to commence physical activities on the Site with adequate forces and equipment and to complete to Material Completion all work in 120 consecutive calendar days beginning the day after the date of the Proceed Order.
Bid Bond. Enclosed herewith is a Bid Bond (NO OTHER FORM ACCEPTABLE) in the amount of _________________________________________ Dollars ($ _____________________ ) (being not less than five percent of the Bid). Bidder agrees that the above stated amount is the proper measure of liquidated damages that the Owner will sustain by bidder's failure to execute the Contract or to furnish the Performance and Payment Bonds should bidder's bid be accepted.
Obligation of Bid Bond. If this bid is accepted within sixty (60) days after the date set for the opening of bids and bidder fails to execute the Contract within ten days after Notice of Successful Bid, or if bidder fails to furnish both Performance and Payment Bonds, the obligation of the Bid Bond will remain in full force and effect and the money payable thereon shall be paid into the funds of the Owner as liquidated damages for such failure; otherwise, the obligations of the Bid Bond will be null and void.
Bidder Certification
Certification under Oath. Under oath I certify that I am a principal or other representative of the bidder, and that I am authorized by it to execute the foregoing bid on its behalf; and further, that I am a principal person of the bidder with management responsibility for the construction for the bidder, and as such I am personally knowledgeable of all its pertinent matters. I further certify that this bid is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a bid for the same services, materials, labor, supplies, or equipment and is in all respects fair and without collusion or fraud. Bidder and its principals understand that collusive bidding is a violation of state and federal law and can result in fines, prison sentences, and civil damage awards. Bidder agrees to abide by all conditions of this bid.
BY: __________________________________________
Authorized Signature (BLUE INK)
___________________________________________
Printed Name Title
Sworn to and subscribed before me this Day of , 20 .
________________________________________
Notary Public
My commission expires: ______________
(SEAL)
NOTE: THE NOTARY SEAL MUST BE APPLIED UNDER GEORGIA LAW, WHETHER OR NOT THE LAW OF THE STATE WHERE EXECUTED PERMITS OTHERWISE.
STATEMENT OF BIDDER'S QUALIFICATIONS:
(To be subscribed and sworn to before a notary public.)
The bidder submits the following statement of bidder's qualifications for consideration by the Owner.
Bidder's Name: _________________________________________________________
LEGAL NAME OF BUSINESS
Bidder's Address: __________________________________________________________
LEGAL BUSINESS ADDRESS (NO P.O. BOX, MUST BE PHYSICAL ADDRESS)
__________________________________________________________
CITY STATE ZIP
__________________________________________________________
MAILING ADDRESS IF DIFFERENT FROM ABOVE
Telephone Number: ___________ ______________________ POC Email: ______________________
AREA CODE NUMBER
The full names of persons and firms interested in the foregoing bid as principals are as follows:
(1)____________________________________________________________________
Circle One: President Partner Owner Other
(2)____________________________________________________________________
Circle One: Vice President Secretary Partner Other
(3)____________________________________________________________________
Circle One: Vice President Secretary Partner Other
Note: If incorporated: The names of both the President and Corporate Secretary must be indicated. If a partnership, all partners must be indicated.
Social Security Number or FEIN: _____________________________________
Contractor's Georgia License Type and Number:
Contractor's Federal Employment Verification Certification: (Must include completed Contractor Affidavit as found in Section 7 of the Contract)
The Contractor is registered with, authorized to use, is using and will continue to use, the federal work authorization program throughout the term of the contract, and holds the following authorization:
User Identification Number:
Date of Authorization:
State Where Organized or Incorporated: ______________________________
Plan of Organization: (Circle One) Proprietorship Corporation Partnership Joint Venture Other (Describe)
Years Engaged in Construction Contracting in Present Firm Organization: ____________ years.
Bidder Hereby Certifies that bidder:
a. Has never refused to sign a contract at the original bid on a public works contract except as allowed under law.
b. Has never been terminated for cause on a public works contract.
c. Has had no (criminal or felony) convictions, suspensions, or debarments of the bidder, its officers, or its principals for building code violations, bid rigging, or bribery in the last ten years.
d. Is not and its organization or its principals are not debarred, suspended, declared ineligible, or otherwise excluded by any Federal or State department or agency from doing business with the Federal Government or a State.
e. Has insurance required by the Contract Documents in place or has arranged to obtain it from an insurer authorized to do business in the State of .
f. Has sufficient bonding capacity to obtain a payment and performance bond from a surety meeting the requirements of the Contract Documents and authorized to do business in the State of .
g. Has sufficient cash flow to perform this Project.
Remarks or explanations of the above paragraphs a through g:
__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Bidder Certification
Certification under Oath. Under oath I certify that I am a principal or other representative of the bidder, and that I am authorized by it to execute the foregoing Statement of Bidder's Qualifications is true and correct, including any explanation above and submitted under oath.
BY: __________________________________________
Authorized Signature (BLUE INK PLEASE)
___________________________________________
Printed Name Title
Sworn to and subscribed before me this Day of , 20 .
________________________________________
Notary Public
My commission expires: ______________
(SEAL)
NOTE: THE NOTARY SEAL MUST BE APPLIED UNDER GEORGIA LAW, WHETHER OR NOT THE LAW OF THE STATE WHERE EXECUTED PERMITS OTHERWISE.
-------------------------------------------------------------------------------------
Statistical Information. This request is made for statistical purposes only.
PLEASE INDICATE BELOW WHICH OF THE FOLLOWING DESCRIPTIONS APPLY TO YOUR COMPANY:
____ MINORITY BUSINESS ENTERPRISE (MBE) - One of the following statements describes this business: a) Owned by a member of a minority race; or b) a partnership of which a majority of interest is owned by one or more members of a minority race; or c) a public corporation of which a majority of the common stock is owned by one or more members of a minority race. A member of a minority race is defined as a person who is a member of a race that comprises less than fifty percent of the total population of the State of . For recordkeeping purposes, this includes, but is not limited to, persons who are Black, Hispanic, Asian-Pacific American, Native American, or Asian-Indian American.
____ GEORGIA MINORITY BUSINESS ENTERPRISE (GMBE) - Business meets the definition of a minority-owned business and, in addition, meets the following criteria: a) was organized in the State of Georgia; or b) reports income from the business for Georgia Income Tax purposes; or c) minority stockholders report earnings for Georgia Minority Business Enterprise.
____ NEITHER DESCRIPTION APPLIES TO YOUR COMPANY.
BID REQUIREMENTS
BID SECURITY FORM
KNOW ALL BY THESE PRESENT, That we, {Insert Contractor's Legal Name and Address} as Principal, hereinafter called the Principal, and {Insert Legal Name and Address of Surety}, a corporation duly organized under the laws of the State of {Insert State of Corporate Organization}, as Surety, hereinafter called the Surety, are held and firmly bound unto:
OWNER:
Attention:
Phone Number:
Facsimile Number:
as Obligee, hereinafter called the Obligee in the sum of ______________________________________________ (Not less than five percent of the Bid) Dollars ($ _______________________ ), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has submitted a Bid for ________________________________________________________;
{Insert Owner's Project Number and Project Description}
NOW, THEREFORE, if the Obligee shall accept the Bid of the Principal and (1) the Principal shall enter into a Contract with the Obligee in accordance with the terms of such Bid, and the Principal shall execute the Contract and give such bond or bonds as may be specified in the Bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) in the event of the failure of the Principal to enter such Contract and give such bond or bonds, and the Principal shall pay to the Obligee the difference not to exceed the difference hereof between the amount specified in said Bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said Bid; then this obligation shall be null and void, otherwise to remain in full force and effect.
Signed and sealed this _______ Day of _______________, 20___
Name of Contractor:
Principal
____________________________________
Witness
By: (Seal)
Title
Name of Surety:
Surety
____________________________________
Witness
By: (Seal) (*)
(*) Attach Power of Attorney
GENERAL CONDITIONS
TABLE OF CONTENTS
SECTION 1 - GENERAL
Part 1 General Provisions
1.1.1 General Matters
1.1.2 Project Team, Cooperation, Partnering
1.1.3 Constitutional Principles Applicable to State Public Works Projects
1.1.4 Third Party Beneficiary
1.1.5 Notice
1.1.6 Liquidated Damages
1.1.7 Documents
1.1.8 Defined Terms
1.1.9 Basic Definitions
Part 2 Contractor's General Responsibilities and Duties
1.2.1 Contractor's General Responsibilities
1.2.2 Contractor's General Duties
1.2.3 Audit
1.2.4 Employment of Georgia Citizens and Use of Georgia Products and Georgia Forest Products
Part 3 Owner's General Responsibilities and Rights
1.3.1 Owner's Representative
1.3.2 Design Professional
1.3.3 Permits, Licenses, and Inspections
1.3.4 Testing
1.3.5 No Partial Occupancy
1.3.6 Disqualification of Potential "Pre-Qualified" Subcontractors
1.3.7 Owner's Right to Perform Work
Part 4 Protection of Persons and Property
1.4.1 Reasonable Precautions
1.4.2 Duty to Protect Property
1.4.3 Safety Precautions
1.4.4 Emergencies
1.4.5 Fire Protection
1.4.6 Remedy Damages
1.4.7 Written Program
Part 5 Bonds, Indemnity, and Insurance
1.5.1 Bonds
1.5.2 Liability and Indemnification
1.5.3 Insurance Requirements
Part 6 Hazardous Conditions and Materials
1.6.1 Hazardous Materials
1.6.2 Responsibility and Warranty of Subcontractors, Trade Contractors, and Suppliers
1.6.3 Hazardous Materials and Substances Used on the Job Site
1.6.4 Hazardous Conditions
Part 7 Miscellaneous Provisions
1.7.1 Legal Compliance
1.7.2 Surveys, Permits and Regulations
1.7.3 Open Records Act
1.7.4 Use of Project Site
1.7.5 Office for Contract Compliance Specialist (CCS)
1.7.6 Utilities
1.7.7 Royalties and Patents
1.7.8 Separate Contracts
1.7.9 Minority, Women and Disadvantaged Business Participation
1.7.10 Assignment
1.7.11 Interpretation of Contract Documents
1.7.12 Counterparts
1.7.13 Forms and Specimens
1.7.14 Entire Agreement
SECTION 2 - PRE-COMMENCEMENT PHASE
Part 1 Pre-commencement Phase Services
2.1.1 Pre-commencement Coordination
2.1.2 Construction Preparation Period
2.1.3 Construction Management Plan
2.1.4 Quality Control Program
2.1.5 Construction Progress Schedule, Overall Project Schedule
2.1.6 Progress Reports and Information
2.1.7 Rental Rates and Wage Rates for Change Orders
2.1.8 Unit Prices
2.1.9 Building Commissioning Services
Part 2 Construction Documents and Site Plan
2.2.1 Contract Documents
2.2.2 Documents at the Project Site
2.2.3 Submittals
2.2.4 Manufacturer's Recommendations
2.2.5 Site Plan
2.2.6 Geological and Archaeological Specimens
SECTION 3 - CONSTRUCTION PHASE
Part 1 Construction Phase Services
3.1.1 Basic Construction Services
3.1.2 Measurements and Dimensions
3.1.3 Rain Water, Surface Water, and Back-up
3.1.4 Dust Control
3.1.5 Cutting, Patching and Fitting
3.1.6 Space Conditions
3.1.7 Cleaning Up
3.1.8 Duty of Contractor to Report Defects
3.1.9 Duty of Contractor to Report Conflicts
Part 2 Changes to the Work
3.2.1 Acknowledgement of Existing Physical Conditions
3.2.2 Owner's Right to Make Changes
3.2.3 Changes Forbidden without Consent of Owner
3.2.4 Form and Execution of Change Orders
3.2.5 All Cost and Time Impacts to be Included
3.2.6 Changes in Contract Time
3.2.7 Determining the Cost to Owner for Changes
3.2.8 Cost Allowable for Changes to the Work, Allowances for Contractor, and Permissible Expenditures
3.2.9 Allowable Costs for Changes to the Work
3.2.10 Costs Not Allowable for Changes in the Work
3.2.11 Change Order Formats (Lump Sum, Force Accounts, Indeterminate Unit Pricing)
3.2.12 Changes Due to Subsurface or Other Unforeseen Conditions
3.2.13 Compensable Rock
3.2.14 Claims for Extended General Conditions Costs
3.2.15 Release of Claims
3.2.16 Sole Source Designation
Part 3 Time
3.3.1 Time is of the Essence
3.3.2 Competent Management of Time
3.3.3 Contract Time
3.3.4 Commencement, Prosecution, and Completion
3.3.5 Construction Progress Schedule (Overall Project Schedule)
3.3.6 Completion Date
3.3.7 General Rule - No Damages for Delay
3.3.8 Exception to General Rule - Compensable Delay
3.3.9 Non-Compensable Delay
3.3.10 Submission of Claims for Compensable Delay and to Extend the Material Completion and Occupancy Date
3.3.11 Recovery of Schedule Delays
Part 4 Correcting the Work, Inspections, Covering and Uncovering Work
3.4.1 Correcting the Work
3.4.2 Inspections
3.4.3 Covering and Uncovering Work
3.4.4 Inspection Does Not Relieve Contractor
Part 5 Subcontractors, Trade Contractors, and Suppliers
3.5.1 Subcontractors, Trade Contractors, and Suppliers
3.5.2 Representation of Contractor
3.5.3 Contractor Responsible for Acts and Omissions
3.5.4 No Contract between Owner and Subcontractors, Trade Contractors, and Suppliers
3.5.5 Relationship of Contractor and Subcontractors, Trade Contractors, and Suppliers
SECTION 4 - COMPENSATION
Part 1 General
4.1.1 Payments
4.1.2 Application for Payments
4.1.3 Processing of Application for Payment (Periodical Estimates)
4.1.4 Effect of Design Professional's Certificate an Application for Payment
4.1.5 Payment Due
4.1.6 Payment Due Dates and Interest
4.1.7 Payments for Change Order Work
Part 2 Payments Withheld
4.2.1 Payments Withheld
Part 3 Liens
4.3.1 Public Property Not Subject to Lien
4.3.2 Notice of Commencement
4.3.3 Release of Liens
SECTION 5 - CONTRACT ADJUSTMENTS, DISPUTES, AND TERMINATION
Part 1 Owner's Right to Suspend or Stop Work
5.1.1 Owner's Right to Suspend Work
5.1.2 Owner's Right to Stop Work
5.1.3 Owner's Rights Independent from Rights and Duty of the Design Professional
Part 2 Contract Adjustments and Disputes
5.2.1 General Provisions
5.2.2 General Claims for Contract Adjustments and Disputes
5.2.3 Dispute Resolution
5.2.4 Certain Claims Excluded from General Claims
Part 3 Termination
5.3.1 Owner's Right to Terminate Contract for Convenience
5.3.2 Owner's Right to Declare Default and/or Terminate Contract for Cause
5.3.3 Contractor's Right to Terminate
5.3.4 Limitation of Payments
5.3.5 Termination by Owner for Abandonment by Contractor
5.3.6 Notices of Termination
SECTION 6 - PROJECT COMPLETION
Part 1 Material Completion
6.1.1 Material Completion
6.1.2 Effect of Achieving Material Completion
6.1.3 Effect of Failure to Achieve Material Completion
Part 2 Final Completion
6.2.1 Final Completion
6.2.2 Effect of Achieving Final Completion
6.2.3 Effect of Failure to Achieve Final Completion
Part 3 Inspections for Completion of the Work
6.3.1 General Responsibility of the Contractor for Inspection
6.3.2 Notice of Readiness for Inspection for Material Completion
6.3.3 Conducting the Inspection for Material Completion
6.3.4 Notification of Using Agency of Site Visits by the Contractor or Subcontractors
6.3.5 Notification of Readiness for Interim Inspection for Punchlist Completion
6.3.6 Conducting the Interim Inspection for Punchlist Completion
6.3.7 Conducting the Inspection for Final Completion
Part 4 Final Documents
6.4.1 Final Documents
6.4.2 Presentation of Final Documents
6.4.3 Keys
Part 5 Payment for Material Completion and for Final Payment
6.5.1 Payment for Material Completion
6.5.2 Application for Payment for Material Completion
6.5.3 Release of Contractor's Retainage
6.5.4 Effect of Payment for Material Completion and Release of Claims
6.5.5 Final Payment
6.5.6 Effect of Final Payment and Release of Claims
Part 6 Correction of the Work after Final Payment
6.6.1 Non-Compliant or Defective Work
6.6.2 Warranty and Guaranty
6.6.3 Warranty Complaint Item Procedure
SECTION 7 - FORMS
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-55964-NONST-2026-000000041
State Government of Georgia
Bid Due: 8/13/2026
Follow Master Breacher Course Support Active Contract Opportunity Notice ID W9124M26RA002 Related Notice
DEPT OF DEFENSE
Bid Due: 12/18/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-62351-NONST-2026-000000025
State Government of Georgia
Bid Due: 7/30/2026
Bid Information Type IFB Status Issued Number U-4661 (Parkway Memorial Gardens Sewer Remediation)
City of Warner Robins
Bid Due: 7/30/2026