Cocoa Police Department HVAC Renovations
| Agency: | City of Cocoa |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Aug 4, 2026 |
| Due Date: | Sep 4, 2026 |
| Solicitation No: | B-26-12-COC |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Main
Agency
City of Cocoa
City of Cocoa
Status
Active
Active
Fiscal Year
2026
2026
Title
Cocoa Police Department HVAC Renovations
Cocoa Police Department HVAC Renovations
Number
B-26-12-COC
B-26-12-COC
Type
Invitation to Bid
Invitation to Bid
Department
Public Works/Facilities
Public Works/Facilities
Online Submissions
No
No
Project Estimate
Piggyback Solicitation
No
No
Insurance Required
Yes
Yes
Bid Bond Required
Yes
Yes
Bid Bond Amount
5% of Bid Amount
5% of Bid Amount
Performance Bond Required
Yes
Yes
Performance Bond Amount
100% of Contract Amount
100% of Contract Amount
Construction Bond Required
No
No
Construction Bond Amount
Scope of Services
The Contractor will provide all materials and labor necessary for the removal and replacement of three (3) Split System DX air conditioning units at the Cocoa Police Department located at 1226 West King Street, Cocoa, FL 32922. This project will require coordinated work across electrical, controls, and HVAC trades to ensure a complete and functional installation. The selected contractor shall be responsible for, at a minimum, the following:
• Removal and proper disposal of three (3) existing AC units, including disconnection of associated electrical, controls, and refrigerant lines in accordance with applicable codes (e.g., EPA refrigerant recovery requirements).
• Furnishing and installing three (3) new AC units of appropriate capacity to match or improve upon existing building load requirements.
• Electrical work including disconnects, wiring, and connections necessary to power the new units, brough up to current code as required.
• Controls work including integration of new units with the building automation/control system (BAS), thermostats, or standalone controls as applicable.
• HVAC work including ductwork modifications/connections, curb adapters (if needed), refrigerant line sets, condensate drainage, and startup/commissioning of each unit.
• Coordination of any required structural support modifications for new equipment (if unit dimensions/weights differ from existing).
• Testing, balancing and verification that each unit is operating to manufacture specifications.
• Cleanup and removal of all debris, packaging, and old equipment from the site upon completion.
• Provision of warranty documentation, equipment manuals, and as-built information upon project completion. All work shall be constructed according to the Construction Plans and are made part of the contract by
reference. The Contractor shall construct the project per:
1. The jurisdiction for the project site is the City of Cocoa, Florida. All work shall be permitted and undertaken in accordance with applicable codes and ordinances.
2. Prime contractor is assumed to be familiar with all general conditions/contract requirements associated with the contract between owner and contractor as they apply to the work noted on the detailed specifications, attached herein as Exhibits A, B and C. Prime contractor shall transfer all such requirements to all subcontractors.
3. All contractors shall examine job site prior to submission of a bid to observe all visible existing conditions. submission of bid will be taken to confirm familiarity with conditions of the work, so the bid price includes all work necessary to provide a completed, ready-to-occupied project.
4. Contractor shall obtain all permits required to undertake the work unless noted otherwise.
5. Prior to receiving a notice-to-proceed, the owner will file a notice-of-commencement with appropriate authority.
6. The contractor shall deliver a work schedule immediately after receiving a notice of award showing all tasks and completion dates.
7. The contractor will be responsible for providing all labor, materials, and equipment necessary to perform the work.
The Contractor will provide all materials and labor necessary for the removal and replacement of three (3) Split System DX air conditioning units at the Cocoa Police Department located at 1226 West King Street, Cocoa, FL 32922. This project will require coordinated work across electrical, controls, and HVAC trades to ensure a complete and functional installation. The selected contractor shall be responsible for, at a minimum, the following:
• Removal and proper disposal of three (3) existing AC units, including disconnection of associated electrical, controls, and refrigerant lines in accordance with applicable codes (e.g., EPA refrigerant recovery requirements).
• Furnishing and installing three (3) new AC units of appropriate capacity to match or improve upon existing building load requirements.
• Electrical work including disconnects, wiring, and connections necessary to power the new units, brough up to current code as required.
• Controls work including integration of new units with the building automation/control system (BAS), thermostats, or standalone controls as applicable.
• HVAC work including ductwork modifications/connections, curb adapters (if needed), refrigerant line sets, condensate drainage, and startup/commissioning of each unit.
• Coordination of any required structural support modifications for new equipment (if unit dimensions/weights differ from existing).
• Testing, balancing and verification that each unit is operating to manufacture specifications.
• Cleanup and removal of all debris, packaging, and old equipment from the site upon completion.
• Provision of warranty documentation, equipment manuals, and as-built information upon project completion. All work shall be constructed according to the Construction Plans and are made part of the contract by
reference. The Contractor shall construct the project per:
1. The jurisdiction for the project site is the City of Cocoa, Florida. All work shall be permitted and undertaken in accordance with applicable codes and ordinances.
2. Prime contractor is assumed to be familiar with all general conditions/contract requirements associated with the contract between owner and contractor as they apply to the work noted on the detailed specifications, attached herein as Exhibits A, B and C. Prime contractor shall transfer all such requirements to all subcontractors.
3. All contractors shall examine job site prior to submission of a bid to observe all visible existing conditions. submission of bid will be taken to confirm familiarity with conditions of the work, so the bid price includes all work necessary to provide a completed, ready-to-occupied project.
4. Contractor shall obtain all permits required to undertake the work unless noted otherwise.
5. Prior to receiving a notice-to-proceed, the owner will file a notice-of-commencement with appropriate authority.
6. The contractor shall deliver a work schedule immediately after receiving a notice of award showing all tasks and completion dates.
7. The contractor will be responsible for providing all labor, materials, and equipment necessary to perform the work.
Dates(All times are listed as
EST
)
Broadcast Date
8/4/2026 8:00 AM EST
8/4/2026 8:00 AM EST
Question End Date
8/20/2026 5:00 PM EST
8/20/2026 5:00 PM EST
Sample Due Date
Due Date
9/4/2026 3:00 PM EST
9/4/2026 3:00 PM EST
Bid Opening Date
Question End Date Reminder Notification
3 Day(s)
3 Day(s)
Sample Due Date Reminder Notification
0 Day(s)
0 Day(s)
Due Date Reminder Notification
3 Day(s)
3 Day(s)
Pre-Bid Meetings
Total: 1
(All times are listed as
EST
)
| Date | Time | Mandatory | Location |
| 8/13/2026 | 10:00 AM | Yes |
City of Cocoa City Hall
3rd Floor Conference Room 65 Stone Street Cocoa, FL 32922 |
Shortlist Meeting
Total: 0
(All times are listed as
EST
)
| Date | Time | Location |
Documents
Total: 4
Commodity Codes
Total: 9
| Code | Description |
| [031-6] | Air Conditioning and Heating: Central Units, and Parts and Accessories Not Individually Itemized |
| [557-5] | Air Conditioning, Heating and Ventilation |
| [559-5] | Air Conditioning, Heating and Ventilation (Including Defrosters and Defoggers) |
| [967-2] | Air Conditioning, Heating, and Ventilating Equipment (HVAC) Manufacturing Services |
| [031-18] | Coil and Fan Units, Air Conditioning |
| [031-21] | Compressors, Air Conditioning: Industrial Type, and Parts |
| [906-44] | Heating; Ventilating; Air Conditioning - Architectural Services |
| [910-36] | Heating, Air Conditioning, and Ventilation Maintenance and Repair Services (Including Installation) |
| [914-50] | Heating, Ventilating and Air Conditioning (HVAC) |
Publications
Total: 1
| Publication | Date |
| Florida Today | 8/4/2026 |
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Title: MDSO Kendall District Restroom+Locker Room/Gym and Desk Operations Center Renovations Opening Date:
Miami-Dade County
Due by 10/14/2026
Project: Tennis and Basketball Court Resurfacing Ref. #: PNC2132726Q1 Department: FASD - Purchasing
Broward County
Due by 9/30/2026
The Florida Fish and Wildlife Conservation Commission is seeking competitive pricing to procure
State Government of Florida
Due by 10/21/2026
Project ID: Title: Annual Pavement Marking Services Addenda: 1 Release Date: 8/12/2026 Due
Alachua County
Due by 9/23/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.