CO OMAD 300(69) Minuteman Missile Access Road
| Agency: | TRANSPORTATION, DEPARTMENT OF |
|---|---|
| State: | Wyoming |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Oct 24, 2024 |
| Due Date: | Oct 24, 2024 |
| Solicitation No: | 6982AF24B000018 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Oct 24, 2024 02:27 pm MDT
- Original Published Date: Sep 12, 2024 11:45 am MDT
- Updated Date Offers Due: Oct 24, 2024 02:00 pm MDT
- Original Date Offers Due: Oct 16, 2024 02:00 pm MDT
- Inactive Policy: Manual
- Updated Inactive Date: Nov 20, 2024
- Original Inactive Date: Nov 20, 2024
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
FE Warren AFB , WY 82005USA
PROJECT DESCRIPTION:
In cooperation with the F.E. Warren Air Force Base and Central Federal Lands Highway Division, this project includes re-graveling up to 116.910 miles of existing gravel on Minuteman Missile Access Roads in various counties within Colorado, Nebraska, and Wyoming. The intent of this project is to provide necessary aggregate road maintenance for select routes utilized by the United States Air Force. The work includes roadway reconditioning and adding four inches of aggregate surface course. All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed or as approved by the CO. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations.
SCOPE OF WORK:
With a fixed-price variable-scope contracting method, less mileage may be awarded. The total amount of miles included in the scope will be dictated by the mileage awarded. The project PS&E will provide a prioritized schedule of roadways to be improved that is anticipated to include up to 116.910 total miles of roadway reconditioning and re-graveling of existing aggregate surface roads.
THE BREAKDOWN OF THE ROADS IS:
- Up to 8.66 miles of reconditioning and regraveling of aggregate surface roads within three segments in Laramie County, Wyoming.
- Up to 11.90 miles of reconditioning and regraveling of aggregate surface roads within two segments in Weld County, Colorado.
- Up to 40.83 miles of reconditioning and regraveling of aggregate surface roads within twelve segments in Logan County, Colorado.
- Up to 14.54 miles of reconditioning and regraveling of aggregate surface roads within five segments in Banner County, Nebraska.
- Up to 3.1 miles of reconditioning and regraveling of aggregate surface roads within one segment in Cheyenne County, Nebraska.
- Up to 37.86 miles of reconditioning and regraveling of aggregate surface roads within eleven segments in Kimball County, Nebraska.
PRINCIPAL WORK ITEMS:
Full utilization of the funding amount to provide Aggregate Surface Reconditioning and Re-Graveling Aggregate Surface Course for up to 116.910 miles of existing aggregate surface roads.
- Costs for items which are incidental to Section 301: Watering for dust control, sub excavation, rental equipment, general labor.
- Temporary Traffic Control
ANTICIPATED SCHEDULE:
Advertise: September 2024
Award: Fall 2024
Construction: June 2025 through September 2025
DISCLOSURE OF MAGNITUDE: $8,650,000.00
- 12300 W. DAKOTA AVE
- LAKEWOOD , CO 80228
- USA
- Stephanie Navarro
- CFLContracts@dot.gov
- Jorey Deml
- cflcontracts@dot.gov
- Oct 24, 2024 02:27 pm MDTSolicitation (Updated)
- Oct 23, 2024 07:35 am MDT Solicitation (Updated)
- Oct 15, 2024 07:12 pm MDT Solicitation (Updated)
- Sep 22, 2024 09:55 pm MDT Presolicitation (Original)
- Sep 12, 2024 11:45 am MDT Solicitation (Original)
Related Document
| Oct 16, 2024 | [Solicitation (Updated)] CO OMAD 300(69) Minuteman Missile Access Road |
| Oct 23, 2024 | [Solicitation (Updated)] CO OMAD 300(69) Minuteman Missile Access Road |
See Also
Follow 4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming Active
AGRICULTURE, DEPARTMENT OF
Due by 10/27/2026
Follow WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase
TRANSPORTATION, DEPARTMENT OF
Follow WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase
TRANSPORTATION, DEPARTMENT OF
Follow WY MT NP MULTI PMS(1), Pavement Preservation Wyoming and Montana Active Contract
TRANSPORTATION, DEPARTMENT OF