CO NP BLCA 10(1) South Rim Drive
| Agency: | TRANSPORTATION, DEPARTMENT OF |
|---|---|
| State: | Colorado |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Sep 17, 2026 |
| Due Date: | Oct 8, 2026 |
| Solicitation No: | 6982AF26Q000022 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
- Original Published Date: Sep 17, 2026 11:44 am MDT
- Original Date Offers Due: Oct 08, 2026 02:00 pm MDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Oct 23, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
Montrose , CO 81401USA
This is a Request for Quote. Plans and specifications are available.
PROJECT NUMBER: CO NP BLCA 10(1)
PROJECT NAME: South Rim Drive Improvement
PROJECT DESCRIPTION:
The National Park Service (NPS) has an immediate safety requirement to restore roadside protection along South Rim Drive following damage sustained during last year's wildfire event. The purpose of this project is to remove remaining roadside hazards and install modern, crash-tested safety barriers to restore the corridor to safe operating conditions prior to peak visitor seasons.
SCOPE OF THE WORK:
The contractor shall provide all labor, materials, equipment, and supervision necessary to execute guardrail removal, site preparation, and installation across twelve (12) distinct locations along South Rim Drive.
Principal work elements include, but are not limited to, the following:
- Selective Boulder Removal & Dispersal: Carefully remove, relocate, or safely set aside existing large boulder barriers at specified curves out of the active road prism/clear zone in accordance with park cultural and aesthetic boundaries.
- Site Grading & Base Preparation: Execute minor grading, shoulder stabilization, and post-hole excavation at the 12 designated locations to prepare the roadside for barrier placement.
- Specialized Guardrail Procurement & Installation: Supply and install steel guardrail systems featuring a weathered-look finish and structural treatments (e.g., Natina stain coatings).
- Traffic Control & Sequencing: Provide comprehensive traffic control, including active one-lane closures and flagging operations, to accommodate construction activities while maintaining safety for park staff and public visitors.
Prospective bidders are advised that the specialized weathered-look guardrail steel and required aesthetic coatings carry extended procurement windows (up to an 8-week lead time plus required material curing periods). Contract duration and ordering timelines are structured to accommodate this supply chain restriction.
To maximize productivity and account for high-altitude weather volatility, construction operations are anticipated to launch in early Spring (April), utilizing a combination of full road closure windows (pre-opening) and transitioning to active one-lane traffic control configurations following the seasonal opening of the roadway.
ANTICIPATED SCHEDULE:
- Advertisement: Mid-September 15, 2026
- Award: Mid-October 2026
- Notice to Proceed (NTP): Mid-October 2026 (Allows the contractor to immediately order the guardrail to absorb the 8-week lead time/curing window over the winter)
- Construction: Early April 2027 – Late May 2027
ESTIMATED COST RANGE:
The estimated bid range for Schedule A is between $700,000 and $2,000,000.
- 12300 W. DAKOTA AVE
- LAKEWOOD , CO 80228
- USA
- Denise Martinez
- CFLAcquisitions@dot.gov
- Jorey Deml
- CFLAcquisitions@dot.gov
- Sep 17, 2026 11:44 am MDTCombined Synopsis/Solicitation (Original)
- Aug 21, 2026 11:06 pm MDT Sources Sought (Updated)
Related Document
| Sep 23, 2026 | [Combined Synopsis/Solicitation (Updated)] CO NP BLCA 10(1) South Rim Drive |
| Sep 25, 2026 | [Combined Synopsis/Solicitation (Updated)] CO NP BLCA 10(1) South Rim Drive |
| Sep 29, 2026 | [Combined Synopsis/Solicitation (Updated)] CO NP BLCA 10(1) South Rim Drive |
| Oct 1, 2026 | [Combined Synopsis/Solicitation (Updated)] CO NP BLCA 10(1) South Rim Drive |
| Oct 2, 2026 | [Combined Synopsis/Solicitation (Updated)] CO NP BLCA 10(1) South Rim Drive |
See Also
Follow Administrative Parking Lot Repairs Active Contract Opportunity Notice ID 1240LT27Q0019 Related Notice
AGRICULTURE, DEPARTMENT OF
Due by 11/23/2026
CMU 2889 North Avenue Improvements
Colorado Mesa University
Due by 11/05/2026
Follow Paving Acquisition Vehicle - Rockies (PAV-R) IDIQ Sources Sought Active Contract Opportunity
DEPT OF DEFENSE
Due by 11/20/2026
Project Number Description Documents *NHPP 0062-038 (25407) Project is in Region 1 in
State Government of Colorado
Due by 12/03/2026