| Agency: | Colorado Mesa University |
|---|---|
| State: | Colorado |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 28, 2026 |
| Due Date: | Apr 30, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
ADVERTISEMENT FOR BIDS
Design / Bid / Build
State of Colorado
Colorado Mesa University
Notice Number: CMU 2872
Project Number: 1039-26-1
Project Title: Escalante Hall Second Floor Geo Pipe Replacement
Estimated Project Cost: $437,103.00
NOTICES
1. For all projects with a total dollar value above $150,000 Notice of Final
Settlement is required by C.R.S. 38-26-107(1). Final Settlement, if required,
will be advertised in the same location as the original solicitation.
2. For State Public Works C.R.S. 8-17-101 - Colorado labor shall be employed to
perform at least 80% of the work. Colorado labor means any person who is a
resident of the state of Colorado at the time of the Public Works project.
3. All respondents accept the conditions of this AFB, including but not limited to,
the following:
a. All submittals shall become the property of the State of Colorado and
will not be returned.
b. Late submittals shall not be evaluated.
c. The State reserves the right to reject any or all proposals on the basis of
being unresponsive to this AFB or for failure to disclose requested
information.
d. The State shall not be liable for any costs incurred by respondents in the
preparation of submittals and proposals nor in costs related to any
element of the selection and contract negotiation process.
4. The respondent has reviewed Appendix F and by responding has agreed that the
terms and conditions of the sample Contractor's Design/Bid/Build (D/B/B)
Agreement (SC-6.21) and General Terms and Conditions of the Contractor's
Design/Bid/Build Agreement (SC- 6.23) are expressly workable without
reservation. Any exceptions to the contract must be communicated formally in
writing before the bid closes.
5. Per C.R.S. 24-92-117, a public construction project in the amount of five
hundred thousand dollars or more shall be subject to the Buy Clean Colorado
(BCCO) Act program requirements. The BCCO Act requires the Office of the
State Architect to establish a maximum acceptable global warming potential
OSA-AFB-1 pg. 1
REV 7/2025
(GWP) limit for each category of eligible materials, which include asphalt and
asphalt mixtures, cement and concrete mixtures, glass, post-tension steel,
reinforcing steel, structural steel, and wood structural elements. For any
solicitation for a contract for the design of an eligible project, a State Agency
or institution shall require the designer who is awarded the contract to include,
in project specifications when final construction documents are released, a
current Environmental Product Declaration (EPD) that meets the maximum
acceptable GWP limits for each eligible material specified for the project. A
contractor that is awarded a contract for an eligible project shall not install
any eligible materials on the project until the contractor submits an EPD for
each eligible material procured for the project.
6. Per C.R.S. 24-92-Part 2, a public construction project in the amount of five
hundred thousand dollars or more shall be subject to the State prevailing wage
rate, of the regular, holiday, and overtime wages paid and the general
prevailing payments on behalf of employees to lawful welfare, pension,
vacation, apprentice training, and educational funds in the State, for each
employee needed to execute the contract. Payments to the funds must
constitute an ordinary business expense deduction for federal income tax
purposes by contractors and subcontractors. Contractors are required to pay
their employees at weekly intervals and shall comply with the enforcement
provisions of C.R.S. 24-92-209. Contractors awarded a project of this size will
be required to utilize the LCPTracker cloud-based labor compliance and
certified payroll application.
7. Preference shall be given to Colorado resident bidders and for Colorado labor,
as provided by law.
8. Per C.R.S. 24-105-201 If the construction value is $50,000 or greater a Bid
Bond and Power of Attorney or Proposal Guaranty is required in an amount not
less than 5% of the total Bid.
PROJECT OVERVIEW
Introduction
Opened in 2014, Escalante Hall is a three-story, 76,000-square-foot facility at
Colorado Mesa University that houses the Department of Languages, Literature, and
Mass Communication. The building blends traditional classrooms with modern
technology to foster interdisciplinary learning and is integrated into the university's
sustainable geothermal Geo-Grid for temperature control.
The State of Colorado, Colorado Mesa University (CMU), is soliciting bids from
qualified contractors to replace the second-floor geo pipe in Escalante Hall.
Scope of Services
All existing mechanical piping indicated on the provided plans shall be removed and
replaced with Niron PP-RCT SDR-11 piping. This includes all mechanical piping on the
2nd and 3rd levels of Escalante Hall, including the heat pump loop mains, supply, and
return piping serving approximately 52 heat pumps.
OSA-AFB-1 pg. 2
REV 7/2025
Replacement piping shall match the size of the existing pipes being removed. New
isolation valves shall be provided at all branch take-offs, as well as on the heat pump
loop mains, to ensure each level can be fully isolated. The contractor shall carefully
remove, protect, and reinstall the existing valve packages and circulator pumps at
each heat pump, providing all necessary manufacturer-approved transition fittings to
connect the new PP-RCT piping to the existing metallic components.
Because PP-RCT plastic piping behaves differently than metallic pipe, the contractor
must provide new piping supports, hangers, and expansion compensation devices
spaced strictly per the Niron manufacturer's installation guidelines.
Upon completion of the piping installation, the contractor shall chemically flush the
new piping and refill the system, providing new glycol to match the existing system's
chemical composition and freeze-protection percentage. Finally, the contractor is
responsible for thoroughly bleeding all air from the piping system and individual heat
pump coils following the system recharge to verify proper flow and operation at all
units prior to final turnover.
The scope of services will include full Construction Contracting Services for the
project specified during the process of construction and warranty period to the State
as per the Advertisement for Bid. Specific tasks to be performed by the Contractor
include those generally performed by the construction community where the
Contractor is the prime vendor to the State. Bidders shall reference the drawings,
specifications, and supporting documents in the Appendices for an understanding of
the entire scope of the project.
Per C.R.S. 38-26-106, if a contract amounts to $150,000 or more, the awarded
contractor shall provide payment and performance bonds not less than 50% of the
value of the contract. The costs associated with this bond are to be included in the
contractor's bid.
MINIMUM REQUIREMENTS
Notice is hereby given to all interested parties that all firms will be required to meet
all minimum requirements to be considered for this project. Interested bidders should
be prepared to show evidence of the following to be considered as qualified, as a
minimum:
1. Not previously terminated by the State for non-performance on a State
Buildings contract or procurement.
2. The bidding contractor must have been in the same business, under the same
name for the last two (2) years.
3. Demonstrated specific contracting experience in projects of similar scope and
complexity for at least two (2) projects each in excess of $500,000.00, utilizing
the expertise present in their Colorado Office; and
OSA-AFB-1 pg. 3
REV 7/2025
4. Demonstrated bonding capability up to $500,000.00 for an individual project
coincidentally with current and anticipated workloads; provide letter from
surety that affirms this capacity.
5. Attended and signed in at the Non-Mandatory Pre-Bid Conference.
6. For a respondent to be considered responsive to this RFQ, the submittal of
qualifications must be posted on Bidnet/Rocky Mountain E-Purchasing System
(RMEPS) website, https://www.rockymountainbidsystem.com.
NON-MANDATORY PRE-BID CONFERENCE AND SITE TOUR
A non-mandatory Pre-Bid Meeting will be held at:
Building Address: University Center, 1455 N. 12th St., Grand Junction, CO, 81501
Room: UC 221
Date/Time April 21, 2026 from 11:00am-12:00pm
SCHEDULE
The following is a tentative schedule of events for the Bid Submittal process and an
outline of the schedule for the balance of the project. All dates are subject to change
and changes in the schedule will be issued via addendum.
Advertisement for Bids Issued 4/17/2026
Mandatory Pre-Bid Conference and Site Tour 4/21/2026 at 11:00am MDT
Request for Clarifications Due 4/22/2026 by 12:00pm MDT
Final Addendum Issued (anticipated) 4/23/26
Bid Submittals Due (date and Time) 4/30/26 by 12:00pm MDT
Award Intent Notification (anticipated) 5/1/2026
Contracting 5/1/2026
Contract Approval (anticipated) 5/8/2026
Anticipated Construction Start 5/15/2026
Anticipated Construction Finish 8/1/2026
The above schedule is tentative. Responding firms shall be notified of revisions in a
timely manner by email or posted on Bidnet/Rocky Mountain E-Purchasing System
(RMEPS) website, https://www.rockymountainbidsystem.com. Respondents may elect
to verify times and dates by email, but no earlier than 36 hours before the scheduled
date and time.
QUESTIONS, CLARIFICATIONS AND ADDENDA
Owner initiated changes to this AFB will be issued under numerically sequenced
addenda on Bidnet/Rocky Mountain E-Purchasing System (RMEPS),
https://www.rockymountainbidsystem.com.
Questions and requests for clarifications regarding this project shall be submitted
before the deadline listed in the above schedule on Bidnet/Rocky Mountain E-
Purchasing System (RMEPS), https://www.rockymountainbidsystem.com.
OSA-AFB-1 pg. 4
REV 7/2025
Communication regarding the project during the procurement, outside of this
submission process or scheduled procurement milestones is not permitted.
POINT OF CONTACT/CLARIFICATION
Name: Breanne Meier
Agency: Colorado Mesa University
Email Address: bmeier@coloradomesa.edu
Phone: 970-248-1417
BIDDING
Bids shall be submitted on the required bid form as indicated on the Information for
Bidders document (SBP-6.12) in Appendix A.
An electronic copy of the sealed bid submittal is due on 4/30/26 and shall be received
no later than 12:00 PM MDT_, and shall be submitted/accepted via on Bidnet/Rocky
Mountain E-Purchasing System (RMEPS), https://www.rockymountainbidsystem.com.,
as described in the Information for Bidders (SBP-6.12)
Bid Forms and Appendices to be included with bid submittal:
Bid Form (SBP-6.13)
Bid Bond (SBP-6.14)
Bid Alternates (SBP-6.131)
Unit Pricing (SBP-6.133)
Late bid submittals will be rejected without consideration. The State of Colorado
assumes no responsibility for costs related to the preparation of bid submittals.
APPENDICES:
Appendix A: Information for Bidders (SBP-6.12)
Appendix B: Bid Form (SBP-6.13)
Appendix B1: Bid Alternates (SBP-6.131) (if Applicable)
Appendix B2: Unit Pricing (SBP-6.133) (if Applicable)
Appendix B3: Bid Bond (SBP-6.14) (if Applicable)
Appendix C: Sample: Direct Labor Burden Calculation (SBP-6.18)
Appendix D: Applicable Prevailing Wage and Apprenticeship and Fringe
Rates (if Applicable)
Appendix E: Sample: Apprenticeship Utilization Certifications (SBP-2.1)
(if Applicable)
(Appendix F: Sample: SC6.21 and SC6.23 Design/Bid/Build Contractor's
Agreement and General Conditions of the Contract)
OSA-AFB-1 pg. 5
REV 7/2025
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
INFORMATION FOR BIDDERS
Institution or Agency:
Project No./Project Name:
1. BID FORM: Bidders are required to use the Bid form attached to the solicitation.
Each bidder is required to bid on all alternates and indicate the time from the
date of the Notice to Proceed to Substantial Completion in calendar days. In
addition, the bidder is required to indicate the period of time to finally complete
the project from Substantial Completion to Final Acceptance, in calendar days.
Bids indicating times for Substantial Completion and Final Acceptance in excess of
the number of days indicated in the Advertisement for Bids for completion of the
entire Project may be found non-responsive and may be rejected. The bid shall
not be modified or conditioned in any manner. Bids and applicable bid security
shall be submitted according to the following instructions:
2. INCONSISTENCIES AND OMISSIONS: Bidders may request clarification of any
seeming inconsistencies, or matters seeming to require explanation, in the bidding
documents at least three (3) business days prior to the time set for the opening of
Bids. Decisions of major importance on such matters will be issued in the form of
addendum.
3. APPLICABLE LAWS AND REGULATIONS: All work under this Contract shall comply
with the provisions of all state and local laws, approved state building codes,
ordinances and regulations which might in any manner affect the work to be done
or those to be employed in or about the work. Labor for work shall be governed
by the provisions of Colorado law which are hereinafter set forth in Articles 27 and
52 of the General Conditions. This includes the requirements for apprenticeship
and prevailing wage on Public Projects. The bidder should be aware that reporting
of embodied carbon emissions of eligible materials shall be governed by the
provisions of Colorado State Law. This includes the requirements for
Environmental Product Declarations (EPDs) that meet the maximum acceptable
Global Warming Potential (GWP) limits as established by the Office of the State
Architect.
4. BID SECURITY: A bid security of not less than 5% of the bid price is required when
the price is estimated to be $50,000 or more. The security shall be a bond by a
surety company, the equivalent in cash, or otherwise supplied in a form
SBP-6.12
Rev 7/2025
satisfactory for the State. Noncompliance requires the bid to be rejected as
nonresponsive.
5. TAXES: The Bid submitted shall exclude all applicable federal excise or
manufacturers' taxes and all state sales and use taxes as hereinafter set forth in
Article 9.3 of the GENERAL CONDITIONS.
6. OR EQUAL: The words "OR EQUAL" are applicable to all specifications and
drawings relating to materials or equipment specified. Any material or equipment
that will fully perform the duties specified, will be considered "equal", provided
the bid submits proof that such material or equipment is of equivalent substance
and function and is approved, in writing. Requests for the approval of "or equal"
shall be made in writing at least five (5) business days prior to bid opening. During
the bidding period, all approvals shall be issued by the Architect/Engineer in the
form of addenda at least two (2) business days prior to the bid opening date.
7. ADDENDA: Owner/architect initiated addenda shall not be issued later than two
(2) business days prior to bid opening date. All addenda shall become part of the
Contract Documents and receipt must be acknowledged on the Bid form.
8. METHOD OF AWARD - LOWEST RESPONSIBLE BIDDER: If the bidding documents
for this project require alternate prices, additive and/or deductible alternates
shall be listed on the alternates bid form provided by the Principal Representative.
Bidders should note the Method of Award is applicable to this Bid as stated below.
A. DEDUCTIBLE ALTERNATES: The lowest responsible Bid, taking into account the
Colorado resident bidder preference provision of Colorado law, will be determined by,
and the contract will be awarded on the base bid combined with deductible
alternates, accepted in numerical order as listed in the Bid Alternates Form provided
by the Principal Representative. The subtraction of alternates shall result in a sum
total within available funds. If this bid exceeds such amount, the right is reserved to
reject all bids. An equal number of alternates shall be subtracted from the base bid
of each bidder within funds available for purposes of determining the lowest
responsible bidder.
B. ADDITIVE ALTERNATES: The lowest responsible Bid, taking into account the Colorado
resident bidder preference provision of Colorado law, will be determined by and the
contract will be awarded on the base bid combined with additive alternates in
numerical order in as listed in the Bid Alternates Form provided by the Principal
Representative. The addition of alternates shall result in a sum total within available
funds. If this bid exceeds such amount, the right is reserved to reject all bids. An
equal number of alternates shall be added to the base bid of each bidder within funds
available for purposes of determining the lowest responsible bidder.
C. DEDUCTIBLE AND ADDITIVE ALTERNATES: Additive alternates will not be used if
deductible alternates are used and deductible alternates will not be used if additive
alternates are used.
9. NOTICE OF CONTRACTOR'S SETTLEMENT - Agencies/institutions must indicate in
the initial Solicitation where settlement will be advertised in electronic media.
SBP-6.12
Rev 7/2025
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
BID FORM
Institution or Agency:
Project No./Project Name:
Bidder Acknowledges Receipt of Addenda Numbers: _______________________________
(See 3a below for the next 3 items)
Bidder Anticipates Services outside the United States or Colorado:* No Yes
Bidder will comply with 80% Colorado Labor on project above $500,000 No Yes
Bidder is a Service-Disabled Veteran Owned Small Business:* No Yes
Base Bid $________________________
Bidder's Time of Completion
Time Period from Notice to Proceed to Substantial Completion: ____________________________
Time Period from Substantial Completion to Final Acceptance: ____________________________
Total Time of Completion of Entire Project (a + b): _________________________
1. BID: Pursuant to the advertisement by the State of Colorado dated ______________ the
undersigned bidder hereby proposes to furnish all the labor and materials and to perform
all the work required for the complete and prompt execution of everything described or
shown in or reasonably implied from the Bidding Documents, including the Drawings and
Specifications, for the work and for the base bid indicated above. Bidders should include
all taxes that are applicable.
2. EXAMINATION OF DOCUMENTS AND SITE: The bidder has carefully examined the Bidding
Documents, including the Drawings and Specifications, and has examined the site of the
Work, so as to make certain of the conditions at the site and to gain a clear understanding
of the work to be done.
3. PARTIES INTERESTED IN BID: The bidder hereby certifies that the only persons or parties
interested in this Bid are those named herein, and that no other bidder or prospective
bidder has given any information concerning this Bid.
a. If the bidder anticipates services under the contract or any subcontracts will be
performed outside the United States or Colorado, the bidder shall provide in a
written statement which must include, but need not be limited to the type of
services that will be performed at a location outside the United States or Colorado
and the reason why it is necessary or advantageous to go outside the United States
or Colorado to perform such services. (Does not apply to any project that receives
federal moneys) *
SBP-6.13
Rev 7/2025
b. For State Public Works projects per C.R.S. 8-17-101, Colorado labor shall be
employed to perform at least 80% of the work. Colorado Labor means any person
who is a resident of the state of Colorado at the time of the Public Works project.
Bidders indicating that their bid proposal will not comply with the 80% Colorado
Labor requirement are required to submit written justification along with the bid
submission. (Does not apply to any project that receives federal moneys) *
c. A Service-Disabled Veteran Owned Small Business (SDVOSB) per C.R.S. 24-103-211,
means a business that is incorporated or organized in Colorado or maintains a place
of business or has an office in Colorado and is officially registered and verified by
the Center for Veteran Enterprise within the U.S. Department of Veteran Affairs.
Attach proof of certification along with the bid submission. *
d. Projects estimated to be $1 million or more that do not receive federal funds are
required to comply with the State Apprenticeship Utilization requirements C.R.S.
24-92-115
e. Projects estimated to be $500,000 or more that do not receive federal funds are
required to comply with the State Prevailing Wage requirements C.R.S. 24-92-201
through 210.
4. BID GUARANTEE: This Bid is accompanied by the required Bid Guarantee. Per C.R.S. 24-
105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney
or Proposal Guaranty is required in an amount not less than 5% of the total Bid. You are
authorized to hold said Bid Guarantee for a period of not more than thirty (30) days after
the opening of the Bids for the work above indicated, unless the undersigned bidder is
awarded the Contract, within said period, in which event the Office of the State
Architect, may retain said Bid Guarantee, until the undersigned bidder has executed the
required Agreement and furnished the required Performance Bond, Labor and Material
Payment Bond, and Insurance Policy.
5. TIME OF COMPLETION: The bidder agrees to achieve Substantial Completion of the
Project from the date of the Notice to Proceed within the number of calendar days
entered above, and in addition, further agrees that the period between Substantial
Completion and Final Acceptance of the Project will not exceed the number of calendar
days noted above. If awarded the Work, the bidder agrees to begin performance within
ten (10) days from the date of the Notice to Proceed subject to Article 46, Time of
Completion and Liquidated Damages of the General Conditions of the Contract, and agrees
to prosecute the Work with due diligence to completion. The bidder represents that
Article 7D of the Contractor's Agreement (SC-6.21) has been reviewed to determine the
type and amount of any liquidated damages that may be specified for this contract.
6. EXECUTION OF DOCUMENTS: The bidder understands that if this Bid is accepted, bidder
must execute the required Agreement and furnish the required Performance Bond, Labor
and Material Payment Bond, Insurance Policy and Certificates of Insurance within ten (10)
days from the date of the Notice of Award, and that the bidder will be required to sign to
acknowledge and accept the Contract Documents, including the Drawings and
Specifications.
7. ALTERNATES: Refer to the Information for Bidders (SC-6.12) for Method of Award for
Alternates and use State Form SBP-6.13.1 Bid Alternates form to be submitted with this
bid form if alternates are requested by the institution/agency in the solicitation
documents.
SBP-6.13
Rev 7/2025
8. Submit wage rates (direct labor costs) for prime contractor and subcontractor as
requested by the institution/agency in the solicitation documents.
9. The right is reserved to waive informalities and to reject any and all Bids.
*Does not apply to projects for Institutions of Higher Education that have opted out of the State
Procurement Code.
SIGNATURES: If the Bid is being submitted by a Corporation, the Bid shall be signed by an officer,
i.e., President or Vice-President. If a sole proprietorship or a partnership is submitting the Bid,
the Bid shall so indicate and be properly signed.
Dated this ________ Day of _______________________ , 20______
THE BIDDER:
By ________________________________________ _________________________________________________
Company Name Address
Phone Number ______________________________ _________________________________________________
City, State Zip Code
By ________________________________________ _________________________________________________
Name (Print) and Title Signature
SBP-6.13
Rev 7/2025
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Description: 2027-045M26- Fire Alarm Device Replacement, CMHHIP Department: CDHS - Office of Administrative
State Government of Colorado
Bid Due: 8/14/2026
RRIC Construction Services for 2026 Offseason Work - Bid Package 1 Closing date
City of Denver
Bid Due: 9/08/2026
Follow Jeffco Airtanker Base Flooring Replacement Active Contract Opportunity Notice ID 1240LT26Q0144 Related
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/21/2026
Follow Safety Shower and Eyewash Corrections Phase 1 Active Contract Opportunity Notice ID
COMMERCE, DEPARTMENT OF
Bid Due: 8/06/2026