CM AT RISK Re-ADVERTISEMENT
The North Carolina State Port Authority is accepting proposals for a Construction
Manager at Risk for the Berth 6&7 Improvements project at Port of Morehead City. Due
February 20th 2026 in the Maritime Building, 2202 Burnett Blvd, Wilmington, NC
28401.
This project consists of reinforcement of the existing steel sheet pile bulkhead and
rehabilitation of the apron along the approximately 1,000-foot-long Berth 6–7. This
project is located at the port of Morehead City and has an estimated construction budget
of $25,800,000.00.
For purposes of coordination, primary contact for project information is:
Christopher Nerell
NORTH CAROLINA PORTS
Project Manager, Engineering
Direct: 910-746-6364
Email: christopher.nerell@ncports.com
For project drawings please contact: MR.Hasan@wsp.com
Project Information Link
https://ncports.com/connect/vendor-opportunities
Contract documents including Sections I-III and Appendices A-J posted on the State
Construction Office website are considered to be included in this advertisement.
RFP DATA SHEET
Item
Short Description of Project
Issuing Office
Department, Agency/Institution,
Location where the Project will be
constructed
Project Overview
Website address (URL) for posting of
notices regarding this project
Expected Date of Completion of
Design
Datum
This project consists of reinforcement of the existing steel sheet pile
bulkhead and rehabilitation of the apron along the approximately 1,000-
foot-long Berth 6–7.
State Construction Office
Engineering Department, North Carolina State Port Authority
Morehead City, North Carolina
The base bid includes installing a new bulkhead waterward of the existing
bulkhead at Berths 6 and 7, with a future average mudline of -47.0 feet.
The scope also covers new soil anchors, extension of existing stormwater
outfalls through the new bulkhead, and corrosion protection. In addition,
the work involves demolition and replacement of existing fenders at the
west end of Berth 7 to align with the new berthing line, along with repairs
to the Berth 7 return wall. Additionally, the apron on Berth 6 and 7 needs
to be repaired including replacing the freight rail, concrete deck as well as
the stormwater drainage system.
https://ncports.com/connect/vendor-opportunities/
March 1st, 2026
Project Designer & Consultants
WSP USA Inc.
Construction Manager at Risk
Selection Schedule including Pre-
Proposal Conference
Construction Management Fee
(Section II Paragraph E.2)
Total Project Construction Budget
Advertisement Posting
Proposals due
Shortlist
Interviews
Selection
January 30th 2026
February 20th 2026
February 27th 2026
March 17th 2026
March 24th 2026
The Construction Management Fee will be a fixed number that will be
reasonably negotiated between the CM at Risk, the Owner, and the State
Construction Office.
Total Project Budget: $ 25,800,000.00
Less:
Design Fees + CA $ 2,200,000.00
Other Reserves – SI/CMT $ 300,000.00
Owner’s Contingency $ 1,100,000.00
Estimated Available for Construction (GMP) $ 22,200,000.00
Reference Documents
Links to the CMAR documents are listed on the State Construction
Office website under the heading NCDOA Forms and Documents,
Construction Manager At Risk (CMAR) Forms. The link to the NCDOA
State Construction Office website is:
https://ncadmin.nc.gov/divisions/state-construction-office
Links to the specific CMAR documents from the State Construction
website are also listed below:
• Qualifications Questionnaire SEE BELOW
Included in this document.
• Section I Proposals, Evaluation, Selection and Award
• Section II General Provisions
• Section III The General Conditions of the Contract, Form OC-
15/CM
• Appendix A. Form of Contract - Pre-Construction Services
• Appendix B. Form of Contract – Preliminary Guaranteed
Maximum Price
• Appendix C. Form of Contract - Fixed Guaranteed Maximum
Price
• Appendix D. Performance & Payment Bond Forms
• Appendix E. Preliminary Design Information Packet
• Appendix F. HUB Plan
• Appendix G. RFP Affidavits
• Appendix H. Rules Implementing Mediated Settlement
• Appendix J. CMR Matrix
STATE OF NORTH CAROLINA
Qualifications Questionnaire for Construction Manager at Risk
Due Date:
February 20th, 2026 at 5:00pm
Submitted to:
North Carolina State Port Authority, Port Engineering,
Wilmington, North Carolina
Christopher Nerell, Project Manager
2202 Burnett Blvd., Wilmington, NC, 28401
910-746-6364
christopher.nerell@ncports.com
Project Title:
Berth 6&7 Improvements. Morehead City, N.C.
Proposer’s Name and Principal Office serving this project:
(Include Company Name and address along with the name of the contact person with telephone
number and e-mail address)
Profile of Proposer:
A. Give corporate history of the company including organizational structure, years in
business and evidence of authority to do business in North Carolina.
B. Provide annual workload for each of the last five (5) years; number of projects and total
dollar value.
C. List projects for which the company is currently committed including name & location of
each project, time frame to complete & dollar volume of each project.
D. Financials – Attach latest balance sheet and income statement if available, based on
company type. Audited statements preferred. If not available, attach a copy of the latest
annual renewal submission to the relevant licensing board. Indicate Dunn & Bradstreet
rating if one exists. (Firms must submit financial data and may clearly indicate a request
for confidentiality to avoid this item becoming part of a public record.)
E. Attach letter from Surety Company or its agent licensed to do business in North Carolina
verifying proposer’s capability of providing adequate performance and payment bonds
for this project.
F. List all construction projects performed by the proposer for agencies and institutions of
the State of North Carolina during the past 10 years.
G. Litigation/Claims. If yes to any of the questions below, list the project(s), dollar value,
contact information for owner and designer and provide a full explanation with relevant
documentation.
1.Has your company ever failed to complete work awarded to it?
___Yes ___No
2.Has your company ever failed to substantially complete a project in a timely manner (i.e.
more than 20% beyond the original contracted, scheduled completion date)?
___Yes ___No
3.Has your company filed any claims with the North Carolina State Construction Office
within the last five years?
___Yes ___No
4.Has your company been involved in any suits or arbitration within the last five years?
___Yes ___No
5.Are there currently any judgments, claims, arbitration proceedings or suits pending or
outstanding against your company, its officers, owners, or agents?
___Yes ___No
6.Has your present company, its officers, owners, or agents ever been convicted of charges
relating to conflicts of interest, bribery, or bid-rigging?
___Yes ___No
7.Has your present company, its officers, owners, or agents ever been barred from bidding
public work in North Carolina?
___Yes ___No
Project Experience
A. List three projects of similar size, scope and complexity performed by the proposer.
B. For each of the three projects, include specific details on the extent to which pre-
construction & construction phase services were provided.
C. For the three projects listed above where CM services were provided, list the Guaranteed
Maximum Price (if given), or if not given, the estimated cost provided by you, and the
total cost of the project at completion.
D. For each of the three projects above where CM services were provided, compare the
number of days in the original schedule with the number of days taken for actual
completion.
E. For each of the three projects listed above, attach project owner references including the
name, address, telephone and fax numbers, and e-mail address of the project owner
representative.