Climbing Tower Maintenance and Restoration
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Colorado |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Sep 5, 2025 |
| Due Date: | Sep 9, 2025 |
| Solicitation No: | W911RZClimbingTowermaintenanceandRestoration |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Sep 05, 2025 04:55 pm MDT
- Original Response Date: Sep 09, 2025 09:00 am MDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Sep 24, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z2JZ - REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
-
NAICS Code:
- 236220 - Commercial and Institutional Building Construction
-
Place of Performance:
Colorado Springs , COUSA
THIS IS A SOURCES SOUGHT NOTICE REQUESTING INFORMATION IN SUPPORT OF THE FOLLOWING REQUIREMENT. This is NOT a Request for Proposal (RFP) or an announcement of a forthcoming solicitation. The Government is seeking information concerning the availability of capable contractors to provide:
All resources and materials needed to execute climbing renovations and modifications. The contractor will warranty all work one year from date of completion and closeout. It will be the responsibility of the contractor to procure all materials, coordinate manpower, and conduct scheduling to ensure a timely completion per the agreed upon call order period of performance. Period of Performance: 30 September 2025- 31 March 2026
5.1 Basic Services. The Contractor shall provide services for all waste management ensuring it is properly disposed of off-site. The Contractor will always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. The contractor will regrout and repaint structural steel base plates. The contractor will clean and repaint all panel rebar hooks. The contractor will replace all missing, worn, or unserviceable t-nuts and corresponding anchor points. The contractor will remove and repair all loose and delaminated concrete. The contractor will patch all cracks properly routing out to ensure a clean and durable bond. The contractor will paint and seal all repair areas identified (any abnormality in the climbing wall and/or structure as compared to original or intended state). The contractor will patch and seal the top of the structure to cover exposed substructure and reduce water intrusion. The contractor will repaint and seal the entire climbing wall. The contractor will repaint and seal all portions of the primary steel structure with signs of flaking, corrosion, or damage. Corrosion, cracks, and/or other abnormalities will be identified, removed, and structurally reinforced with appropriate welding and or fastening. The contractor will scour and seal the existing concrete with textured sealant. The contractor will adjust and orient all top rope and lead bolt hangars. A load test will be performed to support intensive training loads and a safe and maximum load capacity reports will be generated for all existing anchor points. The contractor will have the appropriate experience and credentialling to conduct climbing wall repairs of this scale. Lack of appropriate experience and/or credentialing will result in immediate termination. It will be the responsibility of the contractor to procure all materials, coordinate manpower, and conduct scheduling to ensure a timely completion per the agreed upon period of performance. The contractor, subcontractors, and all personnel associated with the project must have the appropriate access to Fort Carson and appropriate climbing wall restoration experience and/or credentialing.
No contract will be awarded from this announcement. This source sought notice should not be construed as a commitment or authorization to incur costs in anticipation of such a procurement. MICC Fort Carson is interested in obtaining responses from prospective contractors, but no contractor will be reimbursed for providing this information, therefore MICC-Ft. Carson will accept the requested information in whatever format it is provided. All information provided shall become property of the U.S. Army and will not be returned. Responses are requested by 0900 AM Mountain Standard Time on September 09, 2025.
- BLDG 1220 1676 EVANS STREET
- FORT CARSON , CO 80913-5198
- USA
- Julia Gomez
- julia.e.gomez.civ@army.mil
- Sep 05, 2025 04:55 pm MDTSources Sought (Original)
See Also
Follow Gunnison Ranger District Soap Creek Stream Repairs Active Contract Opportunity Notice ID
AGRICULTURE, DEPARTMENT OF
Due by 9/17/2026
Follow Z1DA--554-26-106 Replace DW Valves. Active Contract Opportunity Notice ID 36C25926R0057 Related Notice
VETERANS AFFAIRS, DEPARTMENT OF
Due by 9/16/2026
General Information Document ID IFB1-CAAA-2027000018-1 Status Open Description CTF FCF Grease Interceptor IFB1
State Government of Colorado
Due by 10/01/2026
Follow Z--BLM-CO TRFO BASIN WELL AND WATER SYSTEM Active Contract Opportunity Notice ID
INTERIOR, DEPARTMENT OF THE
Due by 9/17/2026