Cliff Walk Stability Assessment
| Agency: | York town |
|---|---|
| State: | Maine |
| Type of Government: | State & Local |
| Posted Date: | Nov 21, 2025 |
| Due Date: | Dec 19, 2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Bid Title: |
Cliff Walk Stability Assessment
|
| Category: | Bid Announcements |
| Status: | Open |
|
Attachment Preview
Town of York – Informal Request for Proposal
Stability Assessment of the Cliff Walk
The Town of York is seeking quotes from qualified geotechnical and civil engineering
firms to complete a stability assessment of the Cliff Walk, a roughly 1-mile out and back coastal
pedestrian pathway starting at York Harbor Beach. The pathway sustained damage during recent
storms, and the Town is looking to better understand current conditions before determining next
steps. Attached to this request are photos of damages.
Project Overview
We are requesting a professional evaluation to help answer the following:
1. Is the Cliff Walk stable enough to responsibly rebuild?
2. If so, where are the stable areas or anchor points that could support reconstruction?
3. Are there sections that may be beyond reasonable repair?
The assessment will support internal decision-making and may be referenced in future FEMA
Public Assistance documentation.
Scope of Work
At a minimum, quotes should reflect the cost to complete:
• A site visit and visual inspection of the full Cliff Walk corridor
• A geotechnical review of slopes, retaining structures, and observable stability issues
• A civil engineering review of remaining structures, walkways, and erosion areas
• Identification of stable, marginal, and unstable segments
• Any modeling or engineering analysis the firm believes is appropriate
• A written report summarizing findings and recommended next steps
• Maps or figures showing areas of concern
• A general opinion on feasibility of partial or full reconstruction
If a firm believes additional tasks would be beneficial, please include them as optional items.
Quote Requirements
Please provide:
• A proposed cost (lump sum or phased cost range is acceptable)
• A brief description of your approach
• Expected timeline to complete the assessment
• Names/credentials of key staff who would work on the project
• Examples of similar coastal or geotechnical projects (if available)
Timeline
We are requesting quotes by: Close of business on Friday, December 19, 2025.
Work may begin as soon as a firm is selected.
Submission
Quotes may be submitted by email to:
Nicole Pestana
Emergency Management Director
Npestana@yorkmaine.org
Questions
Please reach out by email with any questions or clarifications needed.
The Town appreciates your time and interest and looks forward to reviewing your quote.
Image 1. Small Retaining Wall- Located at 43.1336N, 070.6345W
Image 2. Large Retaining Wall- Located at 43.1336N, 070.6334W
Image 3. Example of structural compromise of remaining sections
of the retaining walls
This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.