CLASS Justification and Approval for Vandenberg Space Force Base Automated Logic controllers (5 years)
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Feb 11, 2026 |
| Due Date: | Feb 25, 2026 |
| Solicitation No: | W912PL26S0008 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Follow
Active
Contract Opportunity
Notice ID
W912PL26S0008
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
US ARMY CORPS OF ENGINEERS
Sub Command
ENGINEER DIVISION SOUTH PACIFIC
Sub Command 2
ENDIST LOS ANGELES
Office
W075 ENDIST LOS ANGELES
General Information
Classification
Description
Contact Information
History
- Contract Opportunity Type: Special Notice (Original)
- Original Published Date: Feb 11, 2026 08:15 am PST
- Original Response Date: Feb 25, 2026 01:00 pm PST
- Inactive Policy: Manual
- Original Inactive Date: Feb 11, 2027
-
Initiative:
- None
- Original Set Aside:
- Product Service Code:
- NAICS Code:
-
Place of Performance:
This Class Justification and Approval covers all VSFB controller system purchases from the effective date of this Class Justification and Approval through 2031. DDC controller system purchases during the next 5 years are expected to number 2,000 units (the number of units expected to reach the end of service life). The 2,000 units was calculated utilizing builder data with the HVAC systems, nearing end of life, that will require an upgrade/update including the control system. This data was acquired from the Builder SMS data. From that, a single controller was calculated for each air handler, boiler, and chiller. The building square footage was divided by a predetermined square footage to determine the number of zone controllers. These figures were then increased by 25% to account for unscheduled failures and their replacements. The sum of the estimated scheduled and unscheduled replacements was approximately 2,000 units. Additionally, each unit is a different type of controller, which will include routers, large equipment controllers, single zone controllers. Automated Logic will be able to provide the number of units. It is a large company with the ability to manufacturer the controllers on a large scale, and their controllers are manufactured in the US. The size and complexity of HVAC control systems depend on the facility. Some systems can be small and simple while others can be large and complex. Depending on the equipment that makes up the HVAC system, different Automated Logic controllers will be needed to control the type of equipment. While the cost per controller varies based upon the type of controller, the current average controller cost is estimated at approximately $850 per unit based on market research. When an average inflation rate of 5% is considered the average cost is expected to increase to $1,100 by 2030. Based on the estimated 2,000 units which may be replaced in the next 5 years and average estimated costs varying between $850 and $1,100, the total spend necessary for these units has been estimated at approximately $2.5M over the next 5 years. The type of appropriations that will be used are dFSRM funds, MILCON, and central funds. There will be no IP/IP rights associated with this Class Brand-Name Only Justification because it will only be utilized for firm-fixed price construction, renovation, and repair projects. The approval of this Class Brand-Name Only Justification will eliminate inefficiencies and duplication in cost by reducing the training requirement by an estimated $80K and 830 hours per 5 year training cycle and the need to train USAF HVAC technicians on multiple manufacturer control systems. The manufacturers of the top three HVAC control systems that are installed on Base were contacted by Civil Engineering (CE) to get the price and time requirement for their required classes needed to train a technician to utilize and access these systems. The average cost and time to complete these classes and an assumed training/retraining of 1 technician of each year was calculated and compared to the training requirement for 1 control system vs 3 control systems which estimated to the $80K and 830 hours per 5 year cycle. This notice advises that any interested responsible party that believes it is equally or otherwise uniquely capable of providing a substitution for meeting the requirements should submit a capability statement.
Attachments/Links
Contracting Office Address
- KO CONTRACTING DIVISION 915 WILSHIRE BLVD SUITE 1109
- LOS ANGELES , CA 90017-3409
- USA
Primary Point of Contact
- Cameron Stokes
- Cameron.Stokes@usace.army.mil
- Phone Number 2134523009
Secondary Point of Contact
- Feb 11, 2026 08:15 am PSTSpecial Notice (Original)
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Follow RFI Keyboard, Video, and Mouse Active Contract Opportunity Notice ID RFI_KEYBOARD_VIDEO_AND_MOUSE Related
DEPT OF DEFENSE
Due by 9/30/2026
Follow NOTICE OF INTENT TO AWARD SOLE SOURCE Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Due by 9/24/2026
Follow FD2020-22-00153 Active Contract Opportunity Notice ID Related Notice Department/Ind. Agency DEPT OF
DEPT OF DEFENSE
Due by 11/15/2026
Bid Information Type One Time or Annual DIR Bid Status Issued Number 26-26114
San Antonio Water System
Due by 9/18/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.