CITY OF SUMNER REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL SERVICES FOR WATER SYSTEM IMPROVEMENTS

Agency: City of Sumner
State: Washington
Type of Government: State & Local
NAICS Category:
  • 237110 - Water and Sewer Line and Related Structures Construction
  • 541330 - Engineering Services
  • 541611 - Administrative Management and General Management Consulting Services
  • 541990 - All Other Professional, Scientific, and Technical Services
Posted Date: Apr 28, 2025
Due Date: May 21, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

The City of Sumner solicits interest from consulting firms with expertise in providing professional services in the area of municipal utilities and Public Works projects.  Services are anticipated to be completed within the 2025 calendar year.

The City of Sumner reserves the right to retain the services of responsive firm(s) for subsequent phases associated with this work.

The City of Sumner reserves the right to amend terms of this “Request for Qualifications” (RFQ), to circulate various addenda, or to withdraw the RFQ at any time, regardless of how much time and effort consultants have spent on their responses.

Prospective consultants will be held to the ADA and Civil Rights language adopted by the City of Sumner.

Project Description

The City of Sumner is seeking professional services from qualified consulting firms to provide design, engineering, and possibly construction management services for the purposes of upgrading the domestic water facilities within and adjacent to the following listed locations:

  • Valley Ave at SR410:
    • Between Gary St and Gault St: As part of this section, the City is also seeking a minor additional design for the Stormwater utility system.
    • SR410 from the eastbound on and off ramp intersection and 74 th St Ct
  • 54th St Ct E from Wright Ave to Cul-de-Sac
  • 159th Ave between Riverside Dr and 76 th St
  • From the Viewpoint Tank to 170 th Ave
  • 16 th St between Wood and McMillan

Evaluation Criteria

Submittals will be evaluated and ranked based on the following criteria:

  1. Qualification of the proposed project manager and key staff members;
  2. Qualifications/expertise of the firm with the utility and public works infrastructure in the area; experience with projects of similar complexity and function.
  3. Consultants’ approach to the City’s project as demonstrated in a description of their approach to the work.
  4. Familiarity with City standards, relevant codes, and City planning requirements; and
  5. Demonstrated ability of the Consultant to perform high quality work, control costs, meet schedules, prepare documentation, and ensure project commitments are met.

Selection Procedure

After the deadline for acceptance of proposals, the SOQ’s will be reviewed and evaluated by an Evaluation Committee comprised of, but not limited to, City staff, appointed or elected officials, and individuals chosen by Public Works staff to participate.  The Evaluation Committee will rate written proposals based on the evaluation criteria listed above.

The City may choose to interview the top firms as ranked by the Evaluation Committee.  Information from the interviews along with feedback from references will be incorporated into the final rankings.

If a contract cannot be negotiated with the top-ranked firm, the City will contact the next firm in line and attempt to negotiate with that firm.  The process will be repeated until an agreement is reached.

Format

The Statement of Qualifications (SOQ) should describe the composition of the proposed team, the qualifications of the key individuals identified on that team, and the relevant experience of the team on similar projects.  Respondents may include subconsultants within their project team.

The Consultant’s Statement of Qualifications should include the following information:

  1. The proposal should be accompanied by a brief introductory letter stating your firm’s interest in the project.
  2. Provide resumes of no more than three (3) key members of the proposed project team inclusive of key subconsultant who will work on this project.
  3. List projects of similar complexity and magnitude undertaken and completed in the past ten (10) years and provide references and a phone number for each reference.
  4. Reference projects should list the involvement of proposed project team members for whom resumes have been submitted.
  5. Please include a statement of assurance that listed team members, including those of subconsultants, will not be replaced without prior approval of the City.

The Statement of Qualifications (SOQ) should consist of no more than ten (10) pages.  The cover letter, front and back covers, and section dividers will not be counted in the ten (10) page limit.

Submittal Deadline:

Please submit an electronic version of your Statement of Qualifications in a single .pdf document by email or other electronic means to thil@sumnerwa.gov no later than no later than 11:00 a.m. on May 21 st , 2025. Hard copy submittals are not required. Any proposal received after the specified date and time may be rejected and may not receive any further consideration by the City.  Postmarks will not be accepted. All questions regarding this solicitation should be directed to Thi Le, Engineering Specialist at (253) 299-5718 or thil@sumnerwa.gov .

Americans with Disabilities Act (ADA) Information

The City of Sumner in accordance with Section 504 of the Rehabilitation Act (Section 504) and the Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability, in all of its programs and activities. This material can be made available in an alternate format by emailing the Contact person or by calling collect 253-299-5700.

Title VI Statement

The City of Sumner in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award.

Dates of Publication:

Courier Herald: April 30 and May 7, 2025 Seattle Daily Journal of Commerce: April 30 and May

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bid Title: RFP New Wastewater Treatment Plant Design Category: Tribal Employment Rights Ordinance

Quinault Indian Nation

Bid Due: 7/03/2026

Project ID: CTY-CR-2025-06 Title: CITYWIDE CONSULTANT ROSTER: Engineering, Surveying, and Design Consulting Addenda:

City of Seattle

Bid Due: 12/30/2030

2026 Courthouse Roof Membrane Bid/RFP Status Open - accepting bids and proposals Bid/RFP

County of Pend Oreille

Bid Due: 6/09/2026

Project: Capital Project Planning RFP Ref. #: 26-001 Type: RFP Status: Open Open

Spokane Public Facilites District

Bid Due: 7/08/2026